DorkingMain

Member
Joined
25 Aug 2020
Messages
692
Location
London, UK
It is an aspiration of the Tarka Line group who help run the line to enable railtours, charters etc to run to Barnstaple. I think it would need an intermediate block section between Eggesford and Barnstaple to flight trains and make it usable though.
Given how expensive a decent platform can be to build (it would have to be a fairy long one too, to safely hold charter trains) - this doesn't seem like a viable idea even without the need to modify the signalling system to accommodate it.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Freightmaster

Verified Rep
Joined
7 Jul 2009
Messages
4,504
Does Didcot control as far as Exeter?
Didcot's area of control currently extends from Paddington to Lavington (just east of Westbury) via the Berks and Hants
and Paddington to Flax Bourton (between Bristol TM and Yatton) via Bath and Chipping Sodbury. It will be many years
before control extends any further west.

Also, where are Wigan's signals controlled (WCML)?
Warrington PSB - the boundary with Preston PSB is between Coppull and Boars Head,
and just like the West of England, there are no plans for resignalling or recontrol for the
foreseeable future.




MARK
 

Ash Bridge

Established Member
Joined
17 Mar 2014
Messages
4,222
Location
Stockport
Given how expensive a decent platform can be to build (it would have to be a fairy long one too, to safely hold charter trains) - this doesn't seem like a viable idea even without the need to modify the signalling system to accommodate it.
Dosen’t need a new one as the original Barnstaple Junction island platform is still in situ and is likely more than lengthy enough, would obviously need some refurbishment work though.
 
Last edited:

21C101

Established Member
Joined
19 Jul 2014
Messages
2,559
Dosent need a new one as the original Barnstaple Junction island platform is still in situ and is likely more than lengthy enough, would obviously need some refurbishment work though.
I believe the concept is the same as has been done for Tweedbank for much the same reasons(ie 2 platforms). Suspect some external funding will be needed but if FTN goes all the way to Barnstaple, not as expensive ss you might think to do, especially if done as part of a general resignalling.
 

Ash Bridge

Established Member
Joined
17 Mar 2014
Messages
4,222
Location
Stockport
I believe the concept is the same as has been done for Tweedbank for much the same reasons(ie 2 platforms). Suspect some external funding will be needed but if FTN goes all the way to Barnstaple, not as expensive ss you might think to do, especially if done as part of a general resignalling.
Definitely agree about the external funding and presumably primarily from the area’s tourist authorities. If it was possible to lock-in and stable the charter set overnight perhaps operators i.e. Belmond and others could be offering an overnight stay in a quality hotel with tour participants then conveyed by coaches meeting the train on arrival. This part of the world has a lot to offer in terms of both coastal and inland scenery imho...
 

21C101

Established Member
Joined
19 Jul 2014
Messages
2,559
Definitely agree about the external funding and presumably primarily from the area’s tourist authorities. If it was possible to lock-in and stable the charter set overnight perhaps operators i.e. Belmond and others could be offering an overnight stay in a quality hotel with tour participants then conveyed by coaches meeting the train on arrival. This part of the world has a lot to offer in terms of both coastal and inland scenery imho...
Indeed. What has moved it from fantasy to potentially do-able is FTN enabling remote signalling equipment to be installed far more cheaply and axle counters making track circuit block feasible without continuous track circuits.
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,723
Warrington PSB - the boundary with Preston PSB is between Coppull and Boars Head,
and just like the West of England, there are no plans for resignalling or recontrol for the
foreseeable future.




MARK
Don't be so sure about that for Warrington.

A new block section in any resignalling will still be north of 7 figures.
 

John R

Established Member
Joined
1 Jul 2013
Messages
6,130
I believe the concept is the same as has been done for Tweedbank for much the same reasons(ie 2 platforms). Suspect some external funding will be needed but if FTN goes all the way to Barnstaple, not as expensive ss you might think to do, especially if done as part of a general resignalling.
Been racking my brains trying to work out what FTN means, but have finally admitted defeat, so perhaps someone could put me out of my misery.
 

21C101

Established Member
Joined
19 Jul 2014
Messages
2,559
Been racking my brains trying to work out what FTN means, but have finally admitted defeat, so perhaps someone could put me out of my misery.
Fixed Telecom Network. A high speed fibre optic based comms network that was put in primarily to provide landlines for GSM-R radio but also to support signalling links to ROCs and general telecoms. Unlike the legacy comms/signalling it provides diversity so that if a cable is cut or equipment fails an alternative route provides service.
 

father_jack

Established Member
Joined
26 Jan 2010
Messages
1,557
Been racking my brains trying to work out what FTN means, but have finally admitted defeat, so perhaps someone could put me out of my misery.
A "google" of the exact words "FTN signalling railway" comes up with Fixed Telecoms Network. I can't/won't show link as it can't be "quoted" as per forum rules. On the subject aren't acronyms supposed to be explained anyway ?
 

John R

Established Member
Joined
1 Jul 2013
Messages
6,130
Fixed Telecom Network. A high speed fibre optic based comms network that was put in primarily to provide landlines for GSM-R radio but also to support signalling links to ROCs and general telecoms. Unlike the legacy comms/signalling it provides diversity so that if a cable is cut or equipment fails an alternative route provides service.
Thank you for the detailed explanation.
 

30907

Veteran Member
Joined
30 Sep 2012
Messages
21,980
Location
Airedale
I believe the concept is the same as has been done for Tweedbank for much the same reasons(ie 2 platforms).
Tweedbank platforms are both used - including for overnight berthing - though as you say there was a plan for regular tourist trains from Edinburgh.
 

21C101

Established Member
Joined
19 Jul 2014
Messages
2,559
Something odd here. See screenshot. Platform numbers at all the stations except Yeoford where it calls at Platform "BAR". Does this mean there will be a platform "OKE" before too long.

It also shows something else, a full 30 minutes between Crediton and the next loop at Eggesford which makes running a reliable hourly service to Barnstaple very difficult, as literally no recovery time.

So reinstating Coleford Junction (reducing this to 24 minutes) has major operational reliabilitg gains for Barnstaple services, with consequent impact at Exeter, before you even bring the additonal Okehampton services into the equation.
 

Attachments

  • Screenshot_20210405-115905_National Rail.jpg
    Screenshot_20210405-115905_National Rail.jpg
    224.6 KB · Views: 55

HamworthyGoods

Established Member
Joined
15 Jan 2019
Messages
4,485
It also shows something else, a full 30 minutes between Crediton and the next loop at Eggesford which makes running a reliable hourly service to Barnstaple very difficult, as literally no recovery time.

So reinstating Coleford Junction (reducing this to 24 minutes) has major operational reliabilitg gains for Barnstaple services, with consequent impact at Exeter, before you even bring the additonal Okehampton services into the equation.

You are incorrectly comparing the departure time at Crediton and the departure time at Eggesford, you should be looking for the arrival time as per the enquiry on the same train attached.

The actual running time between the two points is around 26 minutes. The train from Exeter usually awaits around 5 minutes at Eggesford for the train from Barnstaple to cross.

There is no need for additional double tracking for the existing Barnstaple service, it performs very well on the infrastructure that is there. Yes in an ideal world the line would have more double track but it’s not necessary and there’s more important things to spend money on. Looking at GWR’s performance for the last 4 weeks over 98% of Devon Local services were on time compared to the target of 92% showing little need for infrastructure enhancements.

 

Attachments

  • 6C783192-B260-498A-A91D-B2DE6BD84DF7.png
    6C783192-B260-498A-A91D-B2DE6BD84DF7.png
    1.6 MB · Views: 11
Last edited:

21C101

Established Member
Joined
19 Jul 2014
Messages
2,559
You are incorrectly comparing the departure time at Crediton and the departure time at Eggesford, you should be looking for the arrival time as per the enquiry on the same train attached.

The actual running time between the two points is around 26 minutes. The train from Exeter usually awaits around 5 minutes at Eggesford for the train from Barnstaple to cross.

There is no need for additional double tracking for the existing Barnstaple service, it performs very well on the infrastructure that is there. Yes in an ideal world the line would have more double track but it’s not necessary and there’s more important things to spend money on. Looking at GWR’s performance for the last 4 weeks over 98% of Devon Local services were on time compared to the target of 92% showing little need for infrastructure enhancements.

I'm not calling for additional double tracking. The double track is already there, just not configured in a way that it can be used as double track. A legacy of the technology constraints at the time.
 

HamworthyGoods

Established Member
Joined
15 Jan 2019
Messages
4,485
I'm not calling for additional double tracking. The double track is already there, just not configured in a way that it can be used as double track. A legacy of the technology constraints at the time.

And by joining it up at Coleford Jn would give the same outcome - more double track for which there is no apparent justification for. I understand what you are trying to propose and the existing layout, but sadly I just can’t see a case being made for it. Certainly not on performance grounds with such good existing performance.

Junction re-modelling isn’t cheap neither is building step free platform at Yeoford to mirror existing accessibility.
 

21C101

Established Member
Joined
19 Jul 2014
Messages
2,559
And by joining it up at Coleford Jn would give the same outcome - more double track for which there is no apparent justification for. I understand what you are trying to propose and the existing layout, but sadly I just can’t see a case being made for it. Certainly not on performance grounds with such good existing performance.

Junction re-modelling isn’t cheap neither is building step free platform at Yeoford to mirror existing accessibility.
Yeoford could be solved by moving the junction east of the station although I am not sure it would be operationally desirable. If the down platform was brought back into use it would more likely have its own short step free path to Station Road than a footbridge/lifts as is being done at Brading, so wouldn't be costly.

Assuming it is done as part of a general resignalling/recontrol with Crediton Box abolished it would make little difference cost wise whether the crossovers were renewed in the same place as the existing or at Yeoford thanks to FTN/axle counter track circuyt block technology

I suspect that if this technology had existed in the early 70s, the junction would have remained at Coleford but controlled by Crediton, but with just a single line from Crediton to Coleford
 

John R

Established Member
Joined
1 Jul 2013
Messages
6,130
And by joining it up at Coleford Jn would give the same outcome - more double track for which there is no apparent justification for. I understand what you are trying to propose and the existing layout, but sadly I just can’t see a case being made for it. Certainly not on performance grounds with such good existing performance.

Junction re-modelling isn’t cheap neither is building step free platform at Yeoford to mirror existing accessibility.
Surely it would give much more resilience. If a train is late coming south it would reduce any knock-on delays going north? And I'm not convinced by the existing performance argument - it's unusually high everywhere at the moment with so few of those pesky passengers that can delay trains for a multitude of reasons (often the simple fact of there being too many of them).

(I'm not commenting on the expense point - I have no idea what it might cost, although everything to do with infrastructure is always eye-wateringly expensive, so you may well be right, in terms of the overall business case.)
 

REVUpminster

Established Member
Joined
3 Jan 2021
Messages
1,308
Location
Paignton
I don't know how difficult it would be to physically move the crossovers at Crediton to Coleford junction and plain line Crediton. I would think it would be cheaper way to do it. If it could be controlled from Exeter box then Crediton signal box could close.
 

Irascible

Established Member
Joined
21 Apr 2020
Messages
2,233
Location
Dyfneint
I don't know how difficult it would be to physically move the crossovers at Crediton to Coleford junction and plain line Crediton. I would think it would be cheaper way to do it. If it could be controlled from Exeter box then Crediton signal box could close.
Given the age of Exeter's signalling I wonder if anyone would dare modify it...
 

MarkyT

Established Member
Joined
20 May 2012
Messages
7,598
Location
Torbay
Given the age of Exeter's signalling I wonder if anyone would dare modify it...
Crediton, although about the same age as Exeter PSB, is a small self-contained western region 'E10K'* installation with a local relay-based interlocking and panel. A major issue at Exeter has been the 'panel processor', an old processor-based system that provides the multiplexed control links and handles the controls and indication logic for the wider remote-controlled areas overseen by Exeter such as Taunton and Newton Abbott, but not the immediate environs of Exeter St Davids, Cowley Bridge Junction and Exeter Central station which were provided with traditional relay-based panel circuits and direct multicore cable links instead. The panel processor supplier almost immediately ceased supporting the product, and that has prevented any reconfiguration requiring data changes, effectively locking in the current track layout for four decades! For example, the new properly signalled passenger connection to the West Somerset Railway had to wait until the level crossing at Silk Mills had been decommissioned, so the channels used for its manual control from Exeter could be reassigned to the new signalled routes without a panel processor reconfiguration being required. The panel processor issue would not affect any work at Crediton.

Although getting on for 40 years old, the existing installations' comparative simplicity at Crediton means some minor reconfiguration to accommodate a new method of block working replacing the train-staff to Okehampton is probably feasible, and that wouldn't require any track layout changes. Any more ambitious work to relocate crossovers etc would be best combined with a more ambitious resignalling scheme. As far as track renewals are concerned the PW costs for a new pair of crossovers near Yeoford would be little different to replacing them in situ at Crediton itself, but clearly the signalling changes for that would be rather more significant. My advice would be to bundle the track and signalling renewals together and combine these with an enhancement scheme to move the pointwork as desired and also change the method of block working towards Barnstaple. The overall 'SEU count'* of such a project should not be any more than a pure like-for-like renewal of the existing layout, thus should represent good value.

*E10K: E10,000, the master drawing number for a book of standard relay circuit diagrams used by BR Western Region signalling designers at Reading. They show annotated typical use-cases that can be customised for individual applications.

**SEU: 'signalling equivalent unit', a rough high-level estimate of size and complexity for signalling installations and projects. Each individual turnout and signal within an area being analysed adds a unit to the area total for the installation or project.
 

Irascible

Established Member
Joined
21 Apr 2020
Messages
2,233
Location
Dyfneint
Crediton, although about the same age as Exeter PSB, is a small self-contained western region 'E10K'* installation with a local relay-based interlocking and panel. A major issue at Exeter has been the 'panel processor', an old processor-based system that provides the multiplexed control links and handles the controls and indication logic for the wider remote-controlled areas overseen by Exeter such as Taunton and Newton Abbott, but not the immediate environs of Exeter St Davids, Cowley Bridge Junction and Exeter Central station which were provided with traditional relay-based panel circuits and direct multicore cable links instead. The panel processor supplier almost immediately ceased supporting the product, and that has prevented any reconfiguration requiring data changes, effectively locking in the current track layout for four decades! For example, the new properly signalled passenger connection to the West Somerset Railway had to wait until the level crossing at Silk Mills had been decommissioned, so the channels used for its manual control from Exeter could be reassigned to the new signalled routes without a panel processor reconfiguration being required. The panel processor issue would not affect any work at Crediton.

Although getting on for 40 years old, the existing installations' comparative simplicity at Crediton means some minor reconfiguration to accommodate a new method of block working replacing the train-staff to Okehampton is probably feasible, and that wouldn't require any track layout changes. Any more ambitious work to relocate crossovers etc would be best combined with a more ambitious resignalling scheme. As far as track renewals are concerned the PW costs for a new pair of crossovers near Yeoford would be little different to replacing them in situ at Crediton itself, but clearly the signalling changes for that would be rather more significant. My advice would be to bundle the track and signalling renewals together and combine these with an enhancement scheme to move the pointwork as desired and also change the method of block working towards Barnstaple. The overall 'SEU count'* of such a project should not be any more than a pure like-for-like renewal of the existing layout, thus should represent good value.

*E10K: E10,000, the master drawing number for a book of standard relay circuit diagrams used by BR Western Region signalling designers at Reading. They show annotated typical use-cases that can be customised for individual applications.

**SEU: 'signalling equivalent unit', a rough high-level estimate of size and complexity for signalling installations and projects. Each individual turnout and signal within an area being analysed adds a unit to the area total for the installation or project.
Just want to say - what a great, concise summary of the situation complete with relevant background ( and as someone with a more than passing interest in signalling, informative too! ).

Also sometimes I hate being right...
 
Joined
2 Jan 2018
Messages
11
Given how expensive a decent platform can be to build (it would have to be a fairy long one too, to safely hold charter trains) - this doesn't seem like a viable idea even without the need to modify the signalling system to accommodate it.
Surely the existing disused platform can be cleared and refurbished - there is no need to build a new one?
 

21C101

Established Member
Joined
19 Jul 2014
Messages
2,559
Depends how structurally sound it is. Might be cheaper and easier to build a new one from scratch.
Its a solid platform of decent length with a brick/stone edge in fair condition. Shouldn't need much more than resurfacing, a new set of coping stones, lighting a shelter and short path to station road across the old sidings.

Legacy of it being a fairly important interchange station in times gone by.

 

HamworthyGoods

Established Member
Joined
15 Jan 2019
Messages
4,485
Its a solid platform of decent length with a brick/stone edge in fair condition. Shouldn't need much more than resurfacing, a new set of coping stones, lighting a shelter and short path to station road across the old sidings.

Legacy of it being a fairly important interchange station in times gone by.


Along with all the other PRM requirements such as stepping distance, tactiles etc. New platforms have an awful lot to comply with - look at how much of a similar in ‘good condition’ out of use platform at Brading is being rebuilt.

That seems to be why things cost an extraordinary amount of money!
 

takno

Verified Rep - Traksy
Joined
9 Jul 2016
Messages
6,596
Along with all the other PRM requirements such as stepping distance, tactiles etc. New platforms have an awful lot to comply with - look at how much of a similar in ‘good condition’ out of use platform at Brading is being rebuilt.

That seems to be why things cost an extraordinary amount of money!
Stepping distance is a possible issue, but there's no really good reason why tactiles or anything else should present a massive issue. Even with stepping distance, the work being done on the Isle of Wight clearly shows that platforms can be raised up to modern heights quite easily at minimal cost, and the (now rather redundant) work at Bath shows that you can build the platforms outwards toward the track with no great difficulty. The largest expense of new platforms is almost invariably massive overbearing bridges with lifts and electrification clearance. If there's an easy way to use the existing street to avoid that then there aren't a lot of reasons why it can't happen.

Obviously there are possible reasons it shouldn't. The signalling isn't free for example, and if you don't introduce an intermediate block you'd potentially have a 10 minute delay to an Okehampton train closely following a Barnstable one. Overall you might end up solving a couple of potential problems and creating new ones that were just as large and harder to timetable around.
 
Joined
16 Feb 2014
Messages
33
Location
Nanpean
As far as track renewals are concerned the PW costs for a new pair of crossovers near Yeoford would be little different to replacing them in situ at Crediton itself, but clearly the signalling changes for that would be rather more significant. My advice would be to bundle the track and signalling renewals together and combine these with an enhancement scheme to move the pointwork as desired and also change the method of block working towards Barnstaple.

Costly yes, but I'd imagine this will be required when Okehampton Parkway is created, and assuming the hourly service continues. I'd said on the UK Railway Discussion thread re Okehampton that, even with line speed increases, Crediton and back on the Dartmoor line will at best still be tight within an hour, as OTW, given the double-stop at Crediton. A further two stops at a Parkway station might too much unless addressed by a crossover further west of its current location.

Those who don't know the area, Okehampton station isn't well placed to be a railhead or interchange. Whilst the car park is large, Station Road has to be accessed from the very centre of town and isn't wide or big enough - particularly after it diverges from Tors Road. Stockley/Exeter Road is better placed and Devon County Council, by the looks of their literature, are unlikely to drop the project over signalling costs so I see it as inevitable. It's also best done at the same time as a wider signalling upgrade (probably with Exeter)

Its a solid platform of decent length with a brick/stone edge in fair condition. Shouldn't need much more than resurfacing, a new set of coping stones, lighting a shelter and short path to station road across the old sidings.

For me, I can't see a case for Yeoford having a second platform knowing the village and the patronage as I do - the crossover should be east of the station. The only possible case for it would be in forward-planning for taking Okehampton through to Bere Alston, and the capacity necessary to be a main line diversion. But that's not a strong enough at this stage for me, plus I can imagine the line could cope without being fully doubled.
 

Irascible

Established Member
Joined
21 Apr 2020
Messages
2,233
Location
Dyfneint
It's also best done at the same time as a wider signalling upgrade (probably with Exeter)
I wonder how much else the state of Exeter PSB is holding back. The Crediton-Barnstaple section used to be a lot more complex than it currently is ( even since area resignalling ) but I guess most of that complexity was controlled by ground frames?

Certainly can't see changes up to & at Central without a new panel at least ( and interfacing that with 40yo interlocking seems a job given as punishment... ). Wonder how far down the queue the area is.
 