Due to the present infastructure at Reading station with there only being four through platforms and no fly-over junctions, only two stopping services an hour do not terminate at Reading (Paddington-Oxford). With the nine through platforms there will be from Easter next year and the fly-over junctions to the east and west of the station that will exist at the end of the project (2015), crossing paths and a lack of through platforms will no longer be a barrier to linking stopping/semi-fast services at Reading. If the CP5 plans go ahead there will also be a direct train to Heathrow.
I have attached a schematic of the tracks around Reading station after the Upgrade

The present Crossrail plans include the present 4tph stopping service between Reading and Paddington being replaced by:
2tph Maidenhead-Crossrail (stopping)
2tph Reading(or Beyond)-Paddington (slow-semi-fast [Reading-Twyford-Maidenhead-Slough-Hayes&Harlington-EalingBroadway-Paddington)
If Crossrail is extended to Reading it almost certainly will not go any further than Reading.
If the CP5 plans go ahead the destinations of non-intercity services to the east of Reading might well be:
- Paddington
- Heathrow
- Waterloo
- Gatwick
Those to the west might be:
- Oxford/EastWestRail
- Newbury/Bedwyn
- Basingstoke
I am interested to know what services people think should run as a result of this new capacity.
As a starter I'll put in:
Birmingham(or beyond)-(fast-semi-fast)-Reading-(fast)-Heathrow (1tph)
Manchester-(fast-semi-fast)-Reading-(semi-fast)-Southampton (1tph)
Oxford-(stopping)-Reading-(slow-semi-fast)-Paddington (1tph)
Oxford-(stopping)-Reading-(fast-semi-fast)-Paddington (1tph)
Oxford-(semi-fast)-Reading-(semi-fast)-Gatwick/Ashford.Int (1tph)
Newbury-(stopping)-Reading-(slow-semi-fast)-Paddington (1tph)
Newbury-(stopping)-Reading-(slow-semi-fast)-Heathrow (1tph)
Basingstoke-(stopping)-Reading-(slow-semi-fast)-Heathrow (1tph)
Southampton-(fast-semi-fast)-Reading-(fast)-Heathrow (1tph)
Reading-EastWestRail-MML-Sheffield-York-Edinburgh (1tph)
Reading-Crossrail (stopping) (2tph)
Reading-Waterloo (stopping) (2tph)
Reading-Gatwick (stopping) (1tph)
Bedwyn-Reading (stopping) (1tph)
+ all GW intercity services
I have attached a schematic of the tracks around Reading station after the Upgrade

The present Crossrail plans include the present 4tph stopping service between Reading and Paddington being replaced by:
2tph Maidenhead-Crossrail (stopping)
2tph Reading(or Beyond)-Paddington (slow-semi-fast [Reading-Twyford-Maidenhead-Slough-Hayes&Harlington-EalingBroadway-Paddington)
If Crossrail is extended to Reading it almost certainly will not go any further than Reading.
If the CP5 plans go ahead the destinations of non-intercity services to the east of Reading might well be:
- Paddington
- Heathrow
- Waterloo
- Gatwick
Those to the west might be:
- Oxford/EastWestRail
- Newbury/Bedwyn
- Basingstoke
I am interested to know what services people think should run as a result of this new capacity.
As a starter I'll put in:
Birmingham(or beyond)-(fast-semi-fast)-Reading-(fast)-Heathrow (1tph)
Manchester-(fast-semi-fast)-Reading-(semi-fast)-Southampton (1tph)
Oxford-(stopping)-Reading-(slow-semi-fast)-Paddington (1tph)
Oxford-(stopping)-Reading-(fast-semi-fast)-Paddington (1tph)
Oxford-(semi-fast)-Reading-(semi-fast)-Gatwick/Ashford.Int (1tph)
Newbury-(stopping)-Reading-(slow-semi-fast)-Paddington (1tph)
Newbury-(stopping)-Reading-(slow-semi-fast)-Heathrow (1tph)
Basingstoke-(stopping)-Reading-(slow-semi-fast)-Heathrow (1tph)
Southampton-(fast-semi-fast)-Reading-(fast)-Heathrow (1tph)
Reading-EastWestRail-MML-Sheffield-York-Edinburgh (1tph)
Reading-Crossrail (stopping) (2tph)
Reading-Waterloo (stopping) (2tph)
Reading-Gatwick (stopping) (1tph)
Bedwyn-Reading (stopping) (1tph)
+ all GW intercity services