So many people appear so excited over Crossrail, High Speed 1 and High Speed 2.
Personally, I believe that the billions of pounds involved would have been better spent giving the country a 21st Century railway network the entire nation would be proud of.
Upgrading every inch of existing track and signals to European TGV-type standards allowing high speed operation on all main lines with provision for possible future high speed running on what are now branches.
What is the problem with converting the miles and miles of double track running through open countryside to four track, allowing fast trains to overtake semi-fast trains?
Nationwide overhead electrification would also prevent the need for electric trains to be dragged along a diversionary route by a diesel locomotive.
I don't agree with minor routes being doomed for all eternity to diesel powered units unable to operate at more than 50mph because of the track not being able to safely accommodate higher speeds.
This massive network wide upgrade would include the procurement of a brand new fleet of trains of just two types, one for long distance use and one for local use.
Such an upgrade could surely have been carried for the same cost as the two projects currently in progress and the one proposed.
All three projects are vanity projects allowing the government to brag about how wonderful its rail network is while hiding the fact that 95% of the rail network has not been substantially upgraded since the last century.
Personally, I believe that the billions of pounds involved would have been better spent giving the country a 21st Century railway network the entire nation would be proud of.
Upgrading every inch of existing track and signals to European TGV-type standards allowing high speed operation on all main lines with provision for possible future high speed running on what are now branches.
What is the problem with converting the miles and miles of double track running through open countryside to four track, allowing fast trains to overtake semi-fast trains?
Nationwide overhead electrification would also prevent the need for electric trains to be dragged along a diversionary route by a diesel locomotive.
I don't agree with minor routes being doomed for all eternity to diesel powered units unable to operate at more than 50mph because of the track not being able to safely accommodate higher speeds.
This massive network wide upgrade would include the procurement of a brand new fleet of trains of just two types, one for long distance use and one for local use.
Such an upgrade could surely have been carried for the same cost as the two projects currently in progress and the one proposed.
All three projects are vanity projects allowing the government to brag about how wonderful its rail network is while hiding the fact that 95% of the rail network has not been substantially upgraded since the last century.