People are either standing because all of the seats are taken, or they aren't. And when I'm travelling they often are.
Nobody is saying that there are
never circumstances where all seats are taken/ passengers have to stand (the Saturday lunchtime arrival into Whitby during the summer holidays
But, with an average of only 185 passengers a day, if there are services where
all 150+ seats on a two coach DMU are taken then I don't know why you're struggling to understand that there must therefore be a number of services where passenger numbers are rather paltry?
Why not have Hydrogen trains running 95% of services on the line, but with a four coach (Heaton based) 156/158 providing a summer Saturday morning service from Newcastle that arrives in Whitby at lunchtime (and teatime return)?
Personally, I think that 60m trains will be overkill, when Whitby has an average of only thirtysomething passengers per journey (an average that is skewed by busy Saturday services in the summertime, so that presumably means that the other 95% of departures are even quieter), but I guess we've got to test out the new technology somewhere, and a long branch line seems a safe place to do it (i.e. it's not interacting with many other services, if the technology is unreliable then it's not breaking down on a busy main line, it's nicely out of the way)
Sadly a lot of discussion that has very little to do with the interesting prospect of hydrogen trains
I know it is very unfortunate that more people are struggling in disbelief that hundreds of people might want to go on the train to Whitby than discussing the potential of the Hydrogen technology.
Apologies both.
But when the OP starts a thread with the assumption that a sixty metre train won't be able to cope with a line where current DMUs are "often full and standing" then I think it's worth questioning the maths behind his assumption... given that there are only 185 passengers a day at Whitby
I don’t think a 2 car DMU is ever long enough for seaside destinations either
I think that a two coach DMU should be long enough for the vast majority of journeys to a terminus with only 185 passengers a day (spread over around half a dozen services a day, pre-Covid?)
Certainly there are branch lines where we could look at cascading "urban" stock to the seaside during the summer holidays (e.g. could Northern loan some 150s to bolster the branch lines of Devon/ Cornwall for the school summer holidays?), I agree that the railway struggles to cope with service provision on lines with huge swings in demand (e.g. between quiet winters where the "local" population is pretty low and busy summers when thousands of tourists swamp seaside towns), but the Whitby branch seems suitable for the proposed sixty metre train IMHO