• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Hull Trains set at Peterborough station

Status
Not open for further replies.

Aictos

Established Member
Joined
28 Apr 2009
Messages
10,403
What happened to the Class 180 on the 18:50 Kings Cross to Hull working yesterday, got into Peterborough on the way home and it had been detrained and was stopped in Platform 4.

Went out for the day today and noticed it was still there in one of the though sidings to the west of Platforms 4/5 that the freights usually use.

Would have thought it would have been moved into the Nene sidings, I know from time to time non FCC trains have used the sidings.

Anyone know what's up with it, apart from it's a 180 and they're always breaking down....:lol:
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

BOSCH

Member
Joined
18 Oct 2007
Messages
492
What happened to the Class 180 on the 18:50 Kings Cross to Hull working yesterday, got into Peterborough on the way home and it had been detrained and was stopped in Platform 4.

Went out for the day today and noticed it was still there in one of the though sidings to the west of Platforms 4/5 that the freights usually use.

Would have thought it would have been moved into the Nene sidings, I know from time to time non FCC trains have used the sidings.

Anyone know what's up with it, apart from it's a 180 and they're always breaking down....:lol:

It broke down,it was late into the cross to form the 1851 and left late eventually failing in pl4 at p/boro delaying the EC lincoln service and yours truly on 1918 GC service due to only having 2 engines running !
 

Max

Forum Staff
Staff Member
Administrator
Joined
8 Jun 2005
Messages
5,468
Location
Cambridge
It would be interesting to know what the mechanical status of the unit was before leaving KGX. If it had already lost engines wouldn't it have been more sensible to cancel altogether and transfer pax to EC?
 
Joined
26 Sep 2009
Messages
556
Location
Bishops Stortford
Only slightly off-topic, but this raises an issue on the intended IEP bi-mode configuration.

As I understand it, a bi-mode 5-car will have three engines of a rating similar to a 180 (QSK19 or similar).

It will only need to drop one engine to be in the same predicament as the failed 180 at Peterborough.

That'll be fun north of Edinburgh.
 

Aictos

Established Member
Joined
28 Apr 2009
Messages
10,403
It would be interesting to know what the mechanical status of the unit was before leaving KGX. If it had already lost engines wouldn't it have been more sensible to cancel altogether and transfer pax to EC?

I know East Coast have been accepting both Hull Trains and Grand Central tickets recently due to various cancellations, faults etc...

I'm positive though that while waiting time before I dispatched the Hull Trains set one time last year, the Train Manager clearly stated they must have a minimum of 3 of 5 engines in full working order - any less would result in the service being cancelled and passengers going forward on East Coast and Northern.

Don't know if this policy has changed but wouldn't it be safer as you have said to cancel the service and request ticket acceptance with East Coast - the faulty set could head to Ferme Park then head back in time for the set which forms the 20:30 to Hull to couple onto it to drag it DIT as a 10 car train.

What's the guidelines for Grand Central then if you have less then 3 engines in full working order for their 180s.
 

Max

Forum Staff
Staff Member
Administrator
Joined
8 Jun 2005
Messages
5,468
Location
Cambridge
Don't know if this policy has changed but wouldn't it be safer as you have said to cancel the service and request ticket acceptance with East Coast - the faulty set could head to Ferme Park then head back in time for the set which forms the 20:30 to Hull to couple onto it to drag it DIT as a 10 car train.

What's the guidelines for Grand Central then if you have less then 3 engines in full working order for their 180s.

Mind you, when you couple 180s the faults can often be transferred to the other set, and certain 180s don't couple at all (GC and Hull Trains learnt this the hard way once during engineering works when they had to use the same path on the ECML). Probably would have made most sense to send the unit straight to Old Oak Common for attention!
 

BOSCH

Member
Joined
18 Oct 2007
Messages
492
What's the guidelines for Grand Central then if you have less then 3 engines in full working order for their 180s.

Same as Hull Trains,3 is the minimum number of engines allowed to be in traffic,any less then its a failure I'm afraid !!! You can still reach 125mph on 3 engines as long as the terrain is level or falling,inclines are a no no !!! :lol::lol:;)
 

RichmondCommu

Established Member
Joined
23 Feb 2010
Messages
6,906
Location
Richmond, London
Mind you, when you couple 180s the faults can often be transferred to the other set, and certain 180s don't couple at all (GC and Hull Trains learnt this the hard way once during engineering works when they had to use the same path on the ECML). Probably would have made most sense to send the unit straight to Old Oak Common for attention!

Pardon! How is it possible that certain members of the 180 class don't couple to each other! How can this be? That’s ludicrous!
 

sprite

Member
Joined
4 Jan 2011
Messages
168
Location
Leeds
asylumxl if you're refering to a yellow "sticker" on only the coupler at one end of a 220/221 unit then it actually is to denote it being the DMF (Driving Motor First). 185's also have a yellow coupling box on the 1st class end.
 
Joined
7 Jan 2010
Messages
254
The 180's have had a yellow dot painted on the couplers to show that they have had modified bushes and grease fitted.

I have also heard of problems with the DMDS vehicles trying to couple with other DMDS vehicles as the TMS software gets 'confused'. I think this has only been a problem since they have been operated by different TOC's due to running different software versions.
 
Status
Not open for further replies.

Top