Aictos
Established Member
- Joined
- 28 Apr 2009
- Messages
- 10,403
What happened to the Class 180 on the 18:50 Kings Cross to Hull working yesterday, got into Peterborough on the way home and it had been detrained and was stopped in Platform 4.
Went out for the day today and noticed it was still there in one of the though sidings to the west of Platforms 4/5 that the freights usually use.
Would have thought it would have been moved into the Nene sidings, I know from time to time non FCC trains have used the sidings.
Anyone know what's up with it, apart from it's a 180 and they're always breaking down....
Went out for the day today and noticed it was still there in one of the though sidings to the west of Platforms 4/5 that the freights usually use.
Would have thought it would have been moved into the Nene sidings, I know from time to time non FCC trains have used the sidings.
Anyone know what's up with it, apart from it's a 180 and they're always breaking down....