Searched but couldn't find anything on this.

The westbound platform at Hubberts Bridge has disappeared. A notice at Boston states that the platform was taken out of use on (I think) 19 December and a replacement road service is being provided whilst Network Rail carry out urgent work.

Anyone know the reason for removal of the platform ?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

youngiecj

Member
Joined
26 Feb 2012
Messages
415
I believe it was sinking into the Forty Foot Drain its adjacent too and needed shoring up. I believe when rebuilt the platform will only be able to accommodate local door operation (ie its going to be smaller!). Still doesn't seem right with the extra 2 minutes at Swineshead on 2S04/2S20!
 

Starmill

Veteran Member
Joined
18 May 2012
Messages
27,194
Location
Bolton
Presumably passengers travelling from Hubberts Bridge to stations west of Sleaford could also board the Skegness service and change at Boston for the Nottingham service.
 

Meerkat

Established Member
Joined
14 Jul 2018
Messages
9,276
This is when our railway looks ludicrous.
A tiny station in a tiny place, served by a couple of trains a day carrying 1400 passengers a year - as soon as any significant work was required it should have been closed.
 

Kite159

Veteran Member
Joined
27 Jan 2014
Messages
22,729
Location
West of Andover
This is when our railway looks ludicrous.
A tiny station in a tiny place, served by a couple of trains a day carrying 1400 passengers a year - as soon as any significant work was required it should have been closed.

Might rival Breich & Dolgarrog for most spent per passenger
 

LowLevel

Established Member
Joined
26 Oct 2013
Messages
8,899
I believe it was sinking into the Forty Foot Drain its adjacent too and needed shoring up. I believe when rebuilt the platform will only be able to accommodate local door operation (ie its going to be smaller!). Still doesn't seem right with the extra 2 minutes at Swineshead on 2S04/2S20!

Apparently they're also doing some track work in the area and there were concerns it would collapse during that so they demolished it as a preemptive move.
 
Joined
14 Aug 2012
Messages
1,070
Location
Stratford
Apparently they're also doing some track work in the area and there were concerns it would collapse during that so they demolished it as a preemptive move.

Could they be taking one line out making it single in that area, I am sure its single near there and only doubles just before the station
 
Joined
14 Aug 2012
Messages
1,070
Location
Stratford
Interesting that there is a replacement bus in the morning to Sleaford for Grantham which also calls at Swineshead half an hour after the train has stopped there

The afternoon you have to go to Boston then come back again
 

youngiecj

Member
Joined
26 Feb 2012
Messages
415
Is there anybody get on there, thought there was only 1 train a day stop there

Yeah there is regular passengers, around 5 school children in the morning heading to Sleaford and a couple of regulars from Boston in the afternoon. Also get passengers for the golf complex next to the station. People often walk to the Wheatsheaf Pub and then get the train back in the afternoon as well.
 

LowLevel

Established Member
Joined
26 Oct 2013
Messages
8,899
Could they be taking one line out making it single in that area, I am sure its single near there and only doubles just before the station

No. It is extremely elderly jointed track and there has been some welded rail laid out for years in the cess so I assume they're finally replacing it.
 