On Sunday 13 September, 1B51 15 37 Paddington to Swansea terminated Bristol Parkway due sheared gearbox on rear Power car 43179. Train moved to Up Loop Severn Tunnel Jn. Front PC and trailers moved yesterday as 5Z86 13+35 Severn Tunnel Jcn to Landore. 43179 still at Severn Tunnel Jcn on a skate board, with the probability of having to be removed by road.
 
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

GlosRail

Member
Joined
18 May 2012
Messages
158
Last edited:

gazthomas

Established Member
Joined
5 Jun 2011
Messages
3,466
Location
Llandudno
Forgive my ignorance but do power cars have a gearbox? I thought it was engine -> alternator -> traction motors?
--- old post above --- --- new post below ---
Unless the gearbox is between the engine and the alternator of course?
 

NSEFAN

Established Member
Joined
17 Jun 2007
Messages
3,518
Location
Southampton
There is gearing from the traction motors to the wheels, not sure if this is variable though.
 

SpacePhoenix

Established Member
Joined
18 Mar 2014
Messages
5,491
That must have gone with a bang when it went! Would it have caused any secondary damage when it failed?
 

gimmea50anyday

Established Member
Joined
8 Jan 2013
Messages
3,456
Location
Back Cab
This accident in 1979 was caused by the failure of the gearbox

http://www.railwaysarchive.co.uk/eventsummary.php?eventID=1073

The wheelset siezed and the pinion gear on the traction motor ground down the main gear attached to the drivewheels so the motor spun but the wheels didnt turn. When the train hit the crossover at northallerton the wheelset which had now had a groove dug in to it in the shape of the railhead and tried to follow the crossover point work at 70mph. no major injures fortunately


DOT Northallerton Derailment Accident Report said:
5. To reduce size, mass, and cost a traction motor is used which runs at a speed considerably higher than that of the axle that it drives. A speed reduction gearhox is used between the motor armature shaft and the axle. To reduce the unsprung mass on the axles and hence the amount of track damage, the two traction motors are mounted on the bogie frame and thus fully sprung by the primary suspension. Each gearbox is mounted on the axle by two taper roller bearings and the pinion is carried on its own shaft in the upper half of the gearbox by two additional taper roller bearings. The gear wheel is mounted directly on the axle. The drive from the motor armature is to a short cardan shaft through a flexible coupling. The cardan shaft passes through the hollow centre of the pinion shaft and is connected to it at the far end by a second flexible coupling. A torque reaction link with bonded rubber bushes couples the gearhox to the bogie frame. The gearhox is overall about 110Ox600x3M) mm.
 
Last edited:

fgwrich

Established Member
Joined
15 Apr 2009
Messages
10,676
Location
Hampshire
Has anyone else seen the irony in the failed powercars name? :lol:

Reminds me a little bit of IC / NSE era Laira / OOC - Depots renown for churning the best of the fleet on the Western, the less so on the South Western.
 

PHILIPE

Veteran Member
Joined
14 Nov 2011
Messages
13,472
Location
Caerphilly
Hauled to StPhilips Marsh by 57604 of the FGW Night Riviera Pool which ran Light ex O.O.Common.
 
Status
Not open for further replies.

Top