Sorry, how can any TOC run a fleet of trains that relies on components to be stripped off withdrawn examples of the fleet? that would be madness and surely unviable. Can someone specify which components are now obsolete and reliant on stripped parts?
The age card keeps being thrown at these machines, but remember that LNER examples also ran the London to Newark / Leeds 'stopping' service- , as well as pounding up the ECML and adding the Aberdeen and Inverness sections too which require extensive stopping north of Edinburgh - but still managed close to 20,000 MTIN? Did LNER/VTEC have a iarger maintenance budget? Granted more stop/ starting will use brake pads and discs up quicker, but surely these are monitored and replaced as necessary. A 2+9 HST needed close to 9 or 10 minutes to reach 125mph, while a 2+4 will reach its 100mph maximum in 2.5 minutes - that's a lot less heat build up in the engine room. They were still being cycled from notch 1 to full power regularly when running up the ECML. Braking from 100mph or less also produces less heat in the brakes. So why should these be less reliable on slower services with a lighter load? Maybe LNER/VTEC could afford a larger maintenance budget as it had much higher passenger loadings and greater revenue? Or were these more carefully maintained to avoid horrible breakdowns on the ECML which would have been costly in terms of the repercussions to other services when they did fail and block one of the country's main rail arteries?