I've always wondered how HS2 can justify putting Birmingham on a branch of its own. Surely Birmingham isn't large enough to generate a 3tph non-stop service to London? Who are these passengers going to be?
I've always wondered how HS2 can justify putting Birmingham on a branch of its own. Surely Birmingham isn't large enough to generate a 3tph non-stop service to London? Who are these passengers going to be?
Not to mention Chiltern from Moor Street/Snowhill and the couple of people that ride the LNWR services all the way to Euston for a cheaper price (Though I don’t think that HS2 can compete in terms of price).Suggest looking at the current 3 Pendolinos per hour between Euston and Birmingham and observing how many folks travel end to end today.
Not to mention Chiltern from Moor Street/Snowhill and the couple of people that ride the LNWR services all the way to Euston for a cheaper price (Though I don’t think that HS2 can compete in terms of price).
Add to which the current Pendo service will be at least thinned, if not completely removed ...
I've always wondered how HS2 can justify putting Birmingham on a branch of its own. Surely Birmingham isn't large enough to generate a 3tph non-stop service to London? Who are these passengers going to be?
Don't forget the Birmingham Curzon Street to Birmingham Interchange section will be used by trains from Leeds and Manchester too.
Pedantry alert, but anything to the north won't go through Interchange, it will turn left at the Delta junction at Water Orton.Don't forget the Birmingham Curzon Street to Birmingham Interchange section will be used by trains from Leeds and Manchester too.
I've always wondered how HS2 can justify putting Birmingham on a branch of its own. Surely Birmingham isn't large enough to generate a 3tph non-stop service to London? Who are these passengers going to be?
which makes it extremely expensive.
Add to which the current Pendo service will be at least thinned, if not completely removed ...
If there's one thing that comes up on HS2 threads more than the question of a through station in Birmingham, it's asking why it's so expensive, and whether it is worthwhile...No offense..... (not used as a platitude) But...
You say that quite often. I understand that cost is a rather large factor in various projects but it seems to come with little foresight. From an edumacational standpoint. How much foresight is factored in ? With a project like HS2 there has to be some kind of long term implications. I'm thinking 20+yrs down the line. When the beancounters and abacus shakers play with the numbers. How far ahead is cost factored in ?
From a more emotional standpoint. Why is it always about cost and not what is the best choice ?
Cheers in advance.
If there's one thing that comes up on HS2 threads more than the question of a through station in Birmingham, it's asking why it's so expensive, and whether it is worthwhile...
So the simple answer is that there would be very little benefit to justify the huge cost of providing through running at Birmingham.
To partly answer your wider question, business cases are based on capital cost plus 60 years of operating costs and benefits.
But politicians are understandably nervous to spend a sum that would run into the billions of public money for a tunnel under Birmingham if the experts are saying it won't have any significant benefit.
Commuters and businessmen. Successful Birminghamites who can now move to London and travel to Birmingham and ordinary Londoners who can now afford a slightly larger abode in Birmingham.I've always wondered how HS2 can justify putting Birmingham on a branch of its own. Surely Birmingham isn't large enough to generate a 3tph non-stop service to London? Who are these passengers going to be?
I'd suggest the real short-sightedness with HS2 in the Birmingham area was not including any provision to add a connection (probably in the Water Orton to Washwood Heath area) for trains to access the classic network to New Street and beyond. This would ultimately allow HS services to continue towards Bristol and Reading on the existing route. Similar provision is being included further north for future links to NPR (which I think may now happen before some parts of HS2 itself) and it shouldn't be particularly expensive as it's basically a straight track long enough to allow a junction to be added later. But I've not seen any mention of it being added in Birmingham and Government wants to minimize changes to Phase 1 as already agreed by Parliament.I think. Since I work for the railway. My bias has skewed somewhat. Cost has always been a factor and politically I get the numerous implications but I struggle more and more about some of the seemingly short-sightedness. I see some projects that get implemented but kinda have a side plan that at a later date, more would be added. I wonder more and more about the long term future and hope to some extent that money is less of a deciding factor for major projects like HS2 where we need to think more about the very long term implications.
This bit I understand.
So who/what decides if the cost is justified ? Does it literally just come down to an equation for cost/benefit analysis or is there someone or some mechanic that is saying '"$"£"$" it. lets do it because we need to ?
60yrs is way more than I expected.
Ta Mr _M
Commuters and businessmen. Successful Birminghamites who can now move to London and travel to Birmingham and ordinary Londoners who can now afford a slightly larger abode in Birmingham.
I'd suggest the real short-sightedness with HS2 in the Birmingham area was not including any provision to add a connection (probably in the Water Orton to Washwood Heath area) for trains to access the classic network to New Street and beyond. This would ultimately allow HS services to continue towards Bristol and Reading on the existing route. Similar provision is being included further north for future links to NPR (which I think may now happen before some parts of HS2 itself) and it shouldn't be particularly expensive as it's basically a straight track long enough to allow a junction to be added later. But I've not seen any mention of it being added in Birmingham and Government wants to minimize changes to Phase 1 as already agreed by Parliament.
Commuters and businessmen. Successful Birminghamites who can now move to London and travel to Birmingham and ordinary Londoners who can now afford a slightly larger abode in Birmingham.
All of which will probably reduce substantially post-Covid 19. Very significant numbers of past commuters have now appreciated that their work can be completed remotely much of the time. Season ticket sales will plummet and the London peak overcrowding will reduce.
Swings and roundabouts I think, if you look in detail at what work is going to be done to get into Curzon St above ground you would think why didn't they tunnel all the way in. However, that leaves you in the underground station conundrum which people on here seem to despise (especially if you go off the normal comments on New St), an overground architects wet dream will always sell, especially if it leads to surrounding regeneration with the station as the focal point.I'd suggest the real short-sightedness with HS2 in the Birmingham area was not including any provision to add a connection (probably in the Water Orton to Washwood Heath area) for trains to access the classic network to New Street and beyond. This would ultimately allow HS services to continue towards Bristol and Reading on the existing route. Similar provision is being included further north for future links to NPR (which I think may now happen before some parts of HS2 itself) and it shouldn't be particularly expensive as it's basically a straight track long enough to allow a junction to be added later. But I've not seen any mention of it being added in Birmingham and Government wants to minimize changes to Phase 1 as already agreed by Parliament.
I'd suggest the real short-sightedness with HS2 in the Birmingham area was not including any provision to add a connection (probably in the Water Orton to Washwood Heath area) for trains to access the classic network to New Street and beyond. This would ultimately allow HS services to continue towards Bristol and Reading on the existing route. Similar provision is being included further north for future links to NPR (which I think may now happen before some parts of HS2 itself) and it shouldn't be particularly expensive as it's basically a straight track long enough to allow a junction to be added later. But I've not seen any mention of it being added in Birmingham and Government wants to minimize changes to Phase 1 as already agreed by Parliament.
Phase 2B will indeed run trains from Birmingham as far as Newcastle. As the current Cross Country route is significantly slower than the ECML and WCML, a parallel HS2 route will deliver some of the best projected journey time savings from the whole HS2 network.This is partly why I don't like Curzon Street as a terminus because I think HS2 should be built or least prepared for as an 'X' network with a route from Curzon Street towards the southwestas there will inevitably be trains from Curzon Street towards Leeds / York via Phase 2B. These could have started further south towards Bristol (and beyond) and South Wales.
Phase 2B will indeed run trains from Birmingham as far as Newcastle. As the current Cross Country route is significantly slower than the ECML and WCML, a parallel HS2 route will deliver some of the best projected journey time savings from the whole HS2 network.
A tunnel onwards from Curzon Street would be approximately aligned for a future extension towards Bristol. Looking again at that map, it might surface somewhere around M5 junction 3 and turn southwards, perhaps to drop onto the existing line south of Bromsgrove as an initial phase (avoiding the congested suburban section). However the first part of the tunnel would have to go underneath New Street (station_) and it would also have to get down from the hill that is Birmingham to pass under the Chad valley. I haven't worked out a profile but I think these constraints would indeed push Curzon Street station below ground level, which unfortunately would also make it pretty much impossible to deliver without dismantling the Phase 1 station and disrupting services for many years. My idea for a Washwood Heath connection is a sort of compromise solution to this.
The other option would be a line taking off south-westwards from somewhere south of Birmingham Interchange (off the four-track section to avoid capacity problems), although this runs into some fairly hilly and scenic countryside. But it must be borne in mind that London-Birmingham fills three Pendolinos per hour (and most of it also serves London to the North) and Birmingham-Bristol only fills (overfills) two Voyagers.
No offense..... (not used as a platitude) But...
You say that quite often. I understand that cost is a rather large factor in various projects but it seems to come with little foresight. From an edumacational standpoint. How much foresight is factored in ? With a project like HS2 there has to be some kind of long term implications. I'm thinking 20+yrs down the line. When the beancounters and abacus shakers play with the numbers. How far ahead is cost factored in ?
From a more emotional standpoint. Why is it always about cost and not what is the best choice ?
Cheers in advance.
You would struggle to do that. HS2 goes over Landor St/Duddeston Jn and then over the Cross City line, you would either have to dive down very quickly or go underground via another spur on the approach.Perhaps a tunnelled Curzon Street for through services? So a doubled level station? I doubt there would be value in only going as far as Bromsgrove its either Bristol or nowt.
As for current capacity between Birmingham and Bristol yes overfilled and probably demand supressed I would suggest, though that could have been helped by longer trains of a certain type staying on a little longer but still thats for existing thraeds elsewhere.