GRALISTAIR
Established Member
There are so many HS2 Threads that for my own sanity I have compiled a compilation here.
HS2 Euston
www.railforums.co.uk
HS2 TBM Progress
www.railforums.co.uk
HS2 Colne Valley Viaduct Construction thread
www.railforums.co.uk
More delay for HS2
www.railforums.co.uk
People mover to connect HS2-Birmingham interchange-Airport
www.railforums.co.uk
HS2 Progress at Long Itchington
www.railforums.co.uk
HS2 construction updates Copthall Tunnel
www.railforums.co.uk
HS2 Viaducts progress
www.railforums.co.uk
HS2 Construction updates Birmingham area
www.railforums.co.uk
HS2 Progress near Kenilworth
www.railforums.co.uk
HS2 Old Oak Common
www.railforums.co.uk
Euston terminus maybe delayed or cancelled
www.railforums.co.uk
HS2 official update January 2023
www.railforums.co.uk
HS2 Construction Chipping Warden and Greatworth Green Tunnels
www.railforums.co.uk
HS2- East West Rail bridge
HS2b Eastern Leg de-prioritised
HS2 Euston
HS2 Euston
Some details of station piling have been released, and 4 test piles done which are being monitored Early piling work for the Euston station is expected start in Q1 of this year. This programme of approximately 500 piles will take around two years to complete, followed by another three years of...
HS2 TBM Progress
HS2 TBM Progress
Continuing from the former generic HS2 construction thread: HS2 Ltd continues its rather erratic updates on the progress of its 5 TBMs, issued today (Dec 12) for December 9 (except that the Chiltern report is for December 6, almost a week ago). The Chiltern TBMs were at 7784m/7551m, continuing...
HS2 Colne Valley Viaduct Construction thread
HS2 Colne Valley Viaduct construction updates
I think these are new pictures. The scale of this viaduct is amazing. https://twitter.com/HS2ltd/status/1609157555061755904?s=20
More delay for HS2
More Delay for HS2, and how should we proceed?
It may only be in the Sun, reported by the BBC, but pressure is mounting to cap spend on HS2 because of high cost inflation. Delay to the Euston section or to the whole project, is in the air, to keep within present annual budgets. I'm not sure I believe the possibility of axing the Euston...
People mover to connect HS2-Birmingham interchange-Airport
New people mover train to connect the new HS2 station at Birmingham Interchange with the airport terminal.
I understand that once HS2 opens some sort of transit train people mover will be built to link the Airport with Birmingham Interchange station. However there seems to be very little information on what exactly this will be. Will it simply be an extension of the current cable hauled people mover...
HS2 Progress at Long Itchington
HS2 - Progress at Long Itchington
A pretty impressive flyover of the route heading north and over the Long Itchington tunnel Some serious earthworks have been completed
HS2 construction updates Copthall Tunnel
HS2 Construction Updates - Copthall Tunnel
Found a new video on youtube of a flyover of Copthall tunnel - a 550m cut and cover tunnel located between West Ruislip tunnel portal and the Colne Valley viaduct. Some additional drawings/maps in the following document...
HS2 Viaducts progress
HS2 viaducts progress.
Looks like some more HS2 viaducts are having segments built, according to Twitter. Viaduct deck sections starting to be produced for the Birmingham end of a certain high-speed rail line (pics from an informed source)...
HS2 Construction updates Birmingham area
HS2 Construction Updates - Birmingham Area
I see the main HS2 thread was closed, there's a lot of work going on in the Birmingham area so might be worth having a thread to track updates. The first viaduct pier for the approaches to Curzon has been cast, looks to be at least one or two more in-progress...
HS2 Progress near Kenilworth
HS2 Progress near Kenilworth
The main HS2 thread has been closed and apparently we’re to post individual site updates now, so here’s a couple of drone flyovers from near Kenilworth uploaded today. Really shows that earthworks are coming along well. Also, one of the first proper looks at the ‘Green Tunnel’ portal design in...
HS2 Old Oak Common
HS2 Old Oak Common
I had been expecting to see this in the HS2 Construction thread but it has been closed and I can't find another thread that is suitable. https://www.newcivilengineer.com/latest/hs2-contractors-make-progress-on-station-box-piling-and-utilities-at-old-oak-common-16-12-2022/ HS2 contractors...
Euston terminus maybe delayed or cancelled
Reports that HS2 Euston terminus may be delayed/cancelled
HS2 shambles as it’s revealed £60billion high speed rail project may not go to central LONDON HS2 bosses are weighing up a scaling back of the project — including delaying its Euston terminus to 2038 or scrapping it altogether. Last week, the Department for Transport warned of “tough...
HS2 official update January 2023
HS2 Project Update, January 2023
The HS2 team have posted another update for January 2023. They talk about apprenticeships and bridges that have started to take shape. They're planning to go diesel-free by 2029 which is interesting... because don't they plan to finish construction for phase 1 around 2029?
HS2 Construction Chipping Warden and Greatworth Green Tunnels
HS2 Construction Updates - Chipping Warden / Greatworth Green Tunnels
There are two green tunnels planned , about 1.5 miles each, located south of Long Itchington and north-west of Banbury. Greatworth green tunnel is funnily enough close to Greatworth village, and appears to run under the B4525, the base of the tunnel appears to have been started north of the...
HS2- East West Rail bridge
HS2 East West Rail Bridge
https://twitter.com/HS2ltd/status/1628711274270887936 Made of weathering steel, the 34m East West Rail bridge is designed to naturally age over time to a dark brown colour to help match the tone of the surrounding countryside. It was lifted into position with a 600-tonne crawler crane. New...
www.railforums.co.uk
Future of HS2 2b (Eastern Leg deprioritised)
The government have published a Command Paper this morning which has raised some eyebrows: The Government has accepted the recommendation in the report by Doug Oakervee that plans for HS2 and other major schemes need to be brought together in an Integrated Rail Plan (IRP) for the North and...
www.railforums.co.uk
Last edited: