I said I am concerned about the possibility of that happening.
My answer to that one is the same as I have been saying ever since HSTs came in: don't build trains that have that limitation in the first place. Instead, build fully flexible formations that allow you to add or subtract arbitrary numbers of vehicles as the need arises (and also allow a defective vehicle to be removed without having to take the whole set out of service). The latest election puff from the Conservatives talks about 50 billion for HS2. That buys a LOT of rolling stock...
(Sorry I've rearranged your post a little, it's so I can answer similar points together).
This is the "pie fallacy" of the economy, whereby people envisage a fixed amount of money which is divvied up between all projects. That's not really how it works. The point is the money is there for HS2 to be built and only for HS2 to be built. If HS2 is not built only a small portion of the £50 bn will be spent, because the government does not believe it would see the return on investment. Whether you (or anyone else) feels that that £50bn could have a better return on investment elsewhere is a different story, but from a funding perspective, that's the bottom line of all the major parties.
Wrong way round. Space is finite, therefore economic growth needs to be limited. But that's a whole nother rant.
Indeed.
You are neglecting both the time spent fiddling around at either end to get to and from the HS2 station, and the need to consider twice the journey time because you have to do the journey once in each direction. So London/Manchester becomes a good four hours, as opposed to six-odd at present, which is not a lot less useless.
I agree, the journey time saving shouldn't be the selling point of HS2 and the unfortunate problem is that the government doesn't trust people with understanding the capacity argument and as such, pushed the "High Speed" argument instead. High Speed is more of a happy bi-product. The premise is basically:
- The WCML needs relief.
- The cost differential between building a high speed service and a non-high speed one is negligible, might as well do the one that goes faster.
Which proves my point. You only get more capacity by using HS2 as an excuse to get rid of most of the Inter-City type services to make more space for stoppers. Only you don't think losing most of the Inter-City type services matters and I think it does. Having to do, say, Milton Keynes to Birmingham on a stopper because the shortage of fast services means there isn't one when you need to travel is painful.
This document from the government might help you to get to grips with this. I think you just misunderstand what the change is going to be.
Basically, the current service pattern from MK to Birmingham is one stopper on the slows + 1 stopper on the fast and 1 "semi-fast"* on the fast in the off peak. The indicative WCML service pattern with HS2 Phase 1 sees 2 stoppers on the fast lines + 2 "semi-fast*" services.
If you look at services to WCML destinations, you'll see that no services are reduced except Warrington (which I'm not sure why, goes from 2tph WC to 1tph HS2).
Off Peak**:
Birmingham - 3tph to 5 tph (2 WCML + 3 HS2)
Wolverhampton - 1tph to 2tph (WCML)
Crewe - 4tph to 5tph (3 WCML + 2 HS2)
Stafford - 1tph to 4tph (3 WCML + 1 HS2)
Manchester - 3tph to 5tph (2 WCML + 3 HS2)
Wigan - 2tph to 2tph (1 WCML + 1 HS2)
Scotland - 1tph to 2tph (1 WCML + 1 HS2)
Milton Keynes*** - 3tph to 9tph (9 WCML)
* calling at Rugby, Coventry, Birmingham International and Birmingham NS, not exactly a "slow" service.
** The diagram on page 13 of the document shows the current peak service, compared to an indicative mixture of peak and off peak, I've used RTT to figure out the current off-peak service pattern. The peak improvement for Milton Keynes Central is a change from 12 tph (of which 3 are pick up/set down only) to 17 tph.
*** This value ONLY includes Fast services
The Freight Transport Association reckon that HS2 will be a big problem for getting freight paths to Scotland, and regard HS2 as something against which the needs of the freight industry need to be protected. What they want from the railway is a European loading gauge route to the north, not a high speed one.
If this is the case, there should certainly be some considerations about this, it could be solved by an effective HS2 - HS1 link (as glbotu desperately tries to shut the can of worms he's just opened........).
What I said was that sorting out things which cannot presently be done well, or at all, should be a higher priority both for money and for "drive" than things which are done well already. If you're going to spend billions on building new lines, build them in places where the existing railway system is useless, not where it's excellent.
...I don't intend to bother trying to cut journey times between London and Manchester. They are short enough already - they comfortably beat the car, and since the journey by car isn't going to get any faster, the train doesn't need to either. Instead I'd cut journey times between, say, Bedford/Luton/Northampton et al and Cambridge/East Anglia, or South Wales and Cardigan Bay, where you go by car and if you haven't got a car you stay at home.
I do agree with you that we should be looking at everywhere from a public transport perspective. The point being that the WCML is currently very overcrowded and is only going to get worse.
I would very much like to see a government that puts getting people out of their cars as a top priority, but remember that governments want to appeal to voters. In places where public transport is currently poor, everyone drives, which means that easy votes go to supporting drivers. In places where it's good, everyone gets public transport, so easy votes go to supporting public transport.
Welcome to failings of capitalist-bipartite-democracy 101.
Maglev in a vacuum tunnel. Transporter beams. A giant catapult in each city that throws people into the air and an
enormous foam rubber glove on a two-hundred-foot spring to catch them at the other end...
Don't give them ideas. Virgin Elastic anyone?
Anyway, my stance on HS2 is "cautious support", I think it'll do a job, but it won't be a miracle. Whether we should instead consider spending £50bn somewhere else is a totally different question.