HS2 support in 2015

2015; where do you stand in your support or otherwise of HS2?

  • Strongly support

    Votes: 94 52.8%
  • Support

    Votes: 29 16.3%
  • Not sure, but probably favour it going ahead over being cancelled

    Votes: 15 8.4%
  • Not sure, but probably favour it being cancelled over going ahead

    Votes: 7 3.9%
  • Should be cancelled

    Votes: 14 7.9%
  • Should have been cancelled by now

    Votes: 19 10.7%

  • Total voters
    178
  • Poll closed .
Status
Not open for further replies.

The Ham

Veteran Member
Joined
6 Jul 2012
Messages
12,028
Since the announcement at the end of 2009 the railways have continued to see growth beyond that allowed for in the business case, investment at fairly high levels with future investment for the whole network being promised until at least 2020. As such where do people's support or lack thereof stand for HS2?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

ainsworth74

Forum Staff
Staff Member
Global Moderator
Joined
16 Nov 2009
Messages
31,069
Location
Redcar
My one concern with this poll is that this forum might be a little biased :lol:
 

The Ham

Veteran Member
Joined
6 Jul 2012
Messages
12,028
My one concern with this poll is that this forum might be a little biased :lol:

True, although it wasn't that long ago that there were plenty of people on her arguing against it; I was intrigued to see if that was still the case or whether opinion had changed.
 

SS4

Established Member
Joined
30 Jan 2011
Messages
8,589
Location
Birmingham
I support it. Whilst I am concerned about Birmingham becoming yet another London satellite with the appropriate effects on prices capacity is needed on the network.

I'd prefer to see more investment in the West Midlands (especially Bham - Cov) but that is largely impracticable
 

Geezertronic

Established Member
Joined
14 Apr 2009
Messages
4,124
Location
Birmingham
I'd prefer to see more investment in the West Midlands (especially Bham - Cov) but that is largely impracticable

I guess any potential improvements between Birmingham and Coventry were dashed when the new Bullring was created and the option to take up the space for an additional two tracks into the Southern end of New Street was not taken up. Plus any improvements would not be cost effective to apply around Beechwood Tunnel according to previous

My opinion is that it would be better to make a new Curzon Street station a through station and improve capacity that way (maybe for Cross City?)
 

scarf ace

Member
Joined
7 Feb 2015
Messages
9
I haven't voted because I can't find the button for "HS2 should be cancelled and HSUK built instead".
 

The Ham

Veteran Member
Joined
6 Jul 2012
Messages
12,028
I haven't voted because I can't find the button for "HS2 should be cancelled and HSUK built instead".

I've not put reasons for supporting or cancelling HS2 as otherwise the poll would be too long and I would have missed a reason (or 5). I would suggest that your vote should be in one of the bottom 2 options.
 

stockport1

Member
Joined
5 Apr 2011
Messages
169
I support HS2 on condition that the rest of the railway is electrified and upgraded in the meantime and things like buxton-matlock are reopened.

the worry for me is that we have a HS2 link and meanwhile pacers are still running from Manchester to leeds etc etc etc
 

Camden

Established Member
Joined
30 Dec 2014
Messages
1,949
I support that capacity is needed up to MK, and maybe a high speed line to Birmingham is the best way to do that but beyond Birmingham no I don't support it. HS2 has been divisive and picked big winners but also a lot of heavy losers including with it not appearing consistent in how those winners and losers been chosen. Its benefits seems to be shrouded in politicspeak rather than facts and figures. I would describe it as a political project rather than a transport one, propped up really by transport lobby, the local authorities of the big winners, the local authorities of the please-can-we-have-its, plus a small fanbase.
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,640
I guess any potential improvements between Birmingham and Coventry were dashed when the new Bullring was created and the option to take up the space for an additional two tracks into the Southern end of New Street was not taken up. Plus any improvements would not be cost effective to apply around Beechwood Tunnel according to previous

My opinion is that it would be better to make a new Curzon Street station a through station and improve capacity that way (maybe for Cross City?)

Debatable that two extra tracks would do anything into New St as you still have to put the trains somewhere when you are there. The figure of £1billion is still chucked about for doing the Cov corridor.

Considering the height of Curzon St, Im not sure how you are going to make that a through station.
 

class26

Member
Joined
4 May 2011
Messages
1,197
Before you vote...

You may have seen the reports of the latest anti Hs2 nonsense that the 'true' cost of the project is £138bn. This has been concocted by a couple of leading antis including Andrew Bodman from Hs2aa.

Here's that claim filleted;

https://paulbigland.wordpress.com/2015/03/24/hs2aa-the-hs2-will-cost-138bn-deceit-exposed/

What would be interesting is to list all what HS2 makes possible, not just on the high speed network but the capacity increases throughout and then have an attempt at assessing how much this would all cost if to be achieved on the classic network.
 

Geezertronic

Established Member
Joined
14 Apr 2009
Messages
4,124
Location
Birmingham
Debatable that two extra tracks would do anything into New St as you still have to put the trains somewhere when you are there. The figure of £1billion is still chucked about for doing the Cov corridor.

Considering the height of Curzon St, Im not sure how you are going to make that a through station.

You'd know vastly more than I would, how does the £1bn figure compare with the idea of extending New Street under the existing New Street and routing CC into there and would that be a more viable option than any of the others (including using Moor Street)?
 

Voglitz

Member
Joined
18 Feb 2015
Messages
249
What would be interesting is to list all what HS2 makes possible, not just on the high speed network but the capacity increases throughout and then have an attempt at assessing how much this would all cost if to be achieved on the classic network.

HS2 would make possible, for example, the running of six 400-metre passenger trains per hour each way between Birmingham and Manchester, and Birmingham and Leeds.

However, the all-day demand for travel between those city pairs would not fill a single train. So the excess capacity doesn't have a monetisable worth, and there wouldn't be any value in attempting to provide it, with or without HS2.

The current capital cost of the Y network is about £55 billion, if an RPI adjustment is used to convert from 2011-prices. But, as shown by Great Western Electrification (etc), rail infrastructure inflation is running well ahead of RPI.

Almost no information is available on the financial modelling of HS2, but there's no evidence of any part of the British railway network meeting its total costs from user charges. Overall government support support runs at around £4 billion per annum, and HS1 is one of Britain's most heavily subsidised sections of track.

Most high speed lines worldwide, including heavily used ones such as Taiwan's, seem to require substantial government subsidy.
 

NotATrainspott

Established Member
Joined
2 Feb 2013
Messages
3,304
HS2 would make possible, for example, the running of six 400-metre passenger trains per hour each way between Birmingham and Manchester, and Birmingham and Leeds.

However, the all-day demand for travel between those city pairs would not fill a single train. So the excess capacity doesn't have a monetisable worth, and there wouldn't be any value in attempting to provide it, with or without HS2.

The current capital cost of the Y network is about £55 billion, if an RPI adjustment is used to convert from 2011-prices. But, as shown by Great Western Electrification (etc), rail infrastructure inflation is running well ahead of RPI.

Almost no information is available on the financial modelling of HS2, but there's no evidence of any part of the British railway network meeting its total costs from user charges. Overall government support support runs at around £4 billion per annum, and HS1 is one of Britain's most heavily subsidised sections of track.

Most high speed lines worldwide, including heavily used ones such as Taiwan's, seem to require substantial government subsidy.

If you take a libertarian attitude whereby anything requiring government subsidy is an inherently bad thing then there's basically no case to build any form of infrastructure whatsoever. Crossrail won't ever be able to self-fund based on passenger ticket revenues, especially when the cost of tickets on it will be very much in line with the rest of the London Underground.

The only cost of providing the Birmingham-Manchester and Birmingham-Leeds services is the cost of building the extra platform (2tph = 1 platform face) for each pairing at their termini and the cost of the northern Birmingham chord. Would these services be planned to exist if it were going to cost billions to provide them? No. The northern chord at Birmingham is necessary for HS2 classic-compatibles from wherever to reach the main rolling stock depot at Washwood Heath anyway, so there's really no scope to save money here. It's also a defeatist attitude to take that a city of several million people cannot justify having a half-decent non-stop service to another city of several million people - that there isn't enough demand today is typical of the shameful way in which the UK's regions, cities and nations are marginalised by a metropolitan elite.
 

158756

Established Member
Joined
12 Aug 2014
Messages
1,628
Could someone please explain, or point me in the direction of an explanation of, how the North will see economic benefits from HS2? Will it not just allow Manchester City Centre to become a dormitory suburb of London, and companies to do their business in the North from an office at Old Oak Common?
 

NotATrainspott

Established Member
Joined
2 Feb 2013
Messages
3,304
Could someone please explain, or point me in the direction of an explanation of, how the North will see economic benefits from HS2? Will it not just allow Manchester City Centre to become a dormitory suburb of London, and companies to do their business in the North from an office at Old Oak Common?

At the moment, if you're thinking of where to locate your business headquarters or other major offices in the UK, you have to take into account a location's accessibility to London as well as other factors such as the costs and availability of workers. The Thames Valley is currently doing extremely well because it has such wonderful connections to central London and Heathrow, so companies like O2 Telefonica choose to locate themselves there. Birmingham, Manchester, Leeds etc have the capability to have these sorts of businesses in their city centres but their connections to London and the rest of the country are too poor for their lower costs to make them a good option. For example, the major long distance travel networks are oriented towards London, so it is easier to get from Glasgow to London than it is to get from Glasgow to Birmingham or Manchester. Since HS2 and the future high speed rail network is focused on Birmingham, and with HS3 tying Manchester and Leeds together, the relative advantage of London over other cities in Britain is going to decrease even more to make them more attractive places to invest. Wonderfully, it does this without making London worse, so there's no real negative effect. A business headquarters at Old Oak Common would be able to connect to businesses located in Birmingham's Eastside, and vice-versa.
 

rdeez

Member
Joined
7 Apr 2013
Messages
354
Support in my local area is approximately 0%, if the local community Facebook group is anything to go by!

I posted in support of HS2 and was brutally shot down with a variety of arguments from a number of people (including, surprise surprise, a May election candidate...)

Mind you, in my locality, if you support anything that doesn't pretend we're still a quaint 17th century farming community, you're some kind of dangerous deviant. :roll:
 

Snapper

Established Member
Joined
28 May 2006
Messages
2,460
Location
All over the place
Here's an updated blog on the antis campaign that's failed to set the election alight..

"As we’re now well into the general election campaign I thought it would be interesting to have yet another look at the anti Hs2 campaign’s social media influence.

No doubt they’ve been hoping that the *cough* ‘millions’ they claim are affected by & who oppose Hs2 would be flocking to their banner. As usual, the truth is very different....."
More here:

https://paulbigland.wordpress.com/2015/04/10/the-anti-hs2-mobs-campaign-continues-to-hit-the-rocks/
 
Last edited by a moderator:

Blamethrower

Member
Joined
13 Oct 2014
Messages
384
Location
Bedfordshire
Wholeheartedly support.

We need more capacity, reliability and inter-connectivity.

The only way to do this is to build new lines. WCML upgrade was tried and only delivered 125mph running, new signalling (which hadn't been touched for years) and the removal of a few bottlenecks. £9bn + years of disruption + slight improvement in reliability? what a bargain.

What I don't agree with though is an "either/or" argument that most people are championing.

Rail investment is the highest it's ever been. NOT because of privatisation but because of necessity. IF this country was to have another Hatfield type scenario, politicians would probably be murdered. Our infrastructure is crumbling so we have to re-invest massively just to keep the railway running.

To respond to demand greatly out-stripping supply, we build a new railway to remove the expresses and increase the commuter trains on old lines.

Plus the entire project gives a huge boost to the markets

It's win win for everyone, apart from people stuck in the dark ages. Like my soon to be father in law.

He doesn't support it at all yet it won't affect him in any way. His opinion is often indicative of what I see on here and it has absolutely no basis in fact, reality or sense. He is simply an old fart who drives everywhere at 20 mph and drove 150's when on the railway. He doesn't like change, he doesn't like new lines (despite travelling to paris many times), he doesn't like fast trains, he likes inter-operability challenges as he finds them interesting.

So essentially, enthusiasts who don't want HS2 show similar traits to him. The same reason we are debating whether we need HS2 or not, is the SAME reason we as a country took so long to phase out steam.

WE ARE STUCK IN THE PAST AND WE FEAR CHANGE.
 

Pigeon

Member
Joined
8 Apr 2015
Messages
1,123
I have seen that stated but I do not agree with it. The pot of gold on which HS2 depends is only available because the politicians are determined on doing it. It could equally well be made available for other projects instead if the politicians could make those other projects a focus of equal determination. I am also concerned that it will lead to other projects failing to get off the ground with politicians saying "we're already spending £enormous on the railways, we can't spare any more". It is a great shame that the major parties are all pro-HS2 so that it cannot be a matter to affect how people vote in the forthcoming election.

I don't agree with the points made in favour of HS2. The economic argument is something I will not comment on myself because I consider that all economics comes from fairyland and we'd be better off if it went back there, so I shall say only that large and respected institutions which don't think economics comes from fairyland do consider HS2 unsound and leave it to them to argue that aspect for me. Why the government, which does believe in economics, is so ready to dismiss them is beyond me, but it does seem to be a general failing of government that once they get a bee in their bonnet about some daft scheme or other no amount of argument even on their own terms will dislodge it.

Britain is too small and dense for the journey time reductions to be really significant - especially from Birmingham. And quoting the reductions by themselves is misleading because it fails to take account of the fiddling on at either end - getting to the origin station and getting from the destination station to where you actually want to go - which can already be comparable with the time spent on the main leg even with current schedules. It is the same fallacy that we have already seen applied to conventional rail only on a larger scale. To further speed up those parts of a journey which are already fast may be simple and may make for good headlines but it is very much a case of diminishing returns, and the real gains come from the less glamorous and more difficult task of making the slow parts less slow.

The argument that "Europe has high speed rail therefore we ought to have it too" and that it is "embarrassing" that we don't is so dumb as to be unworthy of comment. I find it embarrassing to have a government that uses Muuum, Jean and Johann have great big train sets, why can't I have one too? as a basis of policy.

The capacity argument is fallacious. HS2 cannot significantly release capacity on conventional lines because it only serves the endpoints. It can only replace trains which go between London and Birmingham/Manchester/Leeds non-stop. Correct me if I'm wrong, but I don't think there are any, or very very few. All the trains which call at intermediate stations have to be retained otherwise the service to, from and between those intermediate stations goes down the tubes.

If a new line on that route or similar is to be built it would be better to build one for freight. This avoids the difficulty of needing to call at lots of intermediate points to be any use because it is already well established that rail freight works best for long-distance haulage between a few major hubs, and it releases capacity for real by not only reducing the number of trains needing to use existing lines, but by removing a whole class of trains with their own acceleration/speed/braking characteristics which makes the business of organising paths for the remaining classes that much simpler.

Rather than spend money improving service between London and four towns which already have excellent services - and at the expense of reducing the service available to other towns if the purported capacity improvements are to materialise - I would prefer to see it spent on sorting out things which the current railway network does notably badly. Journeys in directions to or from London are something it does pretty well. Journeys at right angles to that tend to be somewhere between painfully slow and tedious and not worth trying. Many of the routes which used to run at right angles to London no longer exist and those which do remain tend to have a ropy service. If we are going to spend huge amounts of money on the railways I would far rather see it spent on reopening these closed routes and upgrading the existing ones so that the railway becomes a truly useful means of making journeys at right angles to London.

It is galling to see such worthwhile projects as East West Rail getting stuck in the mire on the eastern section because a few miles of new construction are needed, while the hundreds of miles of new construction for HS2 don't seem to be a problem. Bedford to Cambridge is one of those journeys which you just don't do by train - the alternatives being either all the way into London and all the way out again, or all the way round via Leicester, Peterborough and Ely, both of which are ridiculous. Uckfield-Lewes - which should never have been closed, and wouldn't have been had it not been for East Sussex County Council pulling strings behind the scenes to save themselves a few quid on bridging it - is another one whose possible reopening is dragged out endlessly over problems which are very minor compared to HS2. A third example is taking ten years to get moving on the Halton Curve, which should be a no-brainer - not being able to run direct trains between Lime Street and the North Wales coast for the sake of a mere ten million pounds to fettle up something that already exists is really silly.

Another area where the money could be better spent is on providing longer trains - by far the simplest way to increase capacity, on any line, not just the West Coast, and also making journeys much more pleasant for passengers. Nobody likes being crammed in like sardines. Voyagers are widely criticised for being far too small, and now the mistake is being repeated with 5-car IEP sets apparently to replace full-size HSTs.

I could go on but I've probably said enough :) There are many, many deficiencies of the current railway network the remedying of which would be a far better way to spend the money than on HS2, and it could be so spent if the political will to do it was there.
 

Voglitz

Member
Joined
18 Feb 2015
Messages
249
Britain is too small and dense for the journey time reductions to be really significant - especially from Birmingham. And quoting the reductions by themselves is misleading because it fails to take account of the fiddling on at either end - getting to the origin station and getting from the destination station to where you actually want to go - which can already be comparable with the time spent on the main leg even with current schedules. It is the same fallacy that we have already seen applied to conventional rail only on a larger scale. To further speed up those parts of a journey which are already fast may be simple and may make for good headlines but it is very much a case of diminishing returns, and the real gains come from the less glamorous and more difficult task of making the slow parts less slow.

DfT's 2007 Delivering a Sustainable Railway stated "Higher speed is not the only or best way of cutting journey times. Nor is it without cost. Increasing the maximum speed of a train from 200 km/h to 350 km/h means a 90 per cent increase in energy consumption. In exchange, it cuts station-to-station journey time by less than 25 per cent and door-to-door journey-time by even less."

The capacity argument is fallacious. HS2 cannot significantly release capacity on conventional lines because it only serves the endpoints. It can only replace trains which go between London and Birmingham/Manchester/Leeds non-stop. Correct me if I'm wrong, but I don't think there are any, or very very few. All the trains which call at intermediate stations have to be retained otherwise the service to, from and between those intermediate stations goes down the tubes.

As you say, the capacity argument is fallacious. Because of the very limited number of places it would serve, HS2 could not replace long distance fast trains on existing tracks.
 

NotATrainspott

Established Member
Joined
2 Feb 2013
Messages
3,304
I have seen that stated but I do not agree with it. The pot of gold on which HS2 depends is only available because the politicians are determined on doing it. It could equally well be made available for other projects instead if the politicians could make those other projects a focus of equal determination. I am also concerned that it will lead to other projects failing to get off the ground with politicians saying "we're already spending £enormous on the railways, we can't spare any more". It is a great shame that the major parties are all pro-HS2 so that it cannot be a matter to affect how people vote in the forthcoming election.

What project isn't being taken forward as a result of spending on HS2?

I don't agree with the points made in favour of HS2. The economic argument is something I will not comment on myself because I consider that all economics comes from fairyland and we'd be better off if it went back there, so I shall say only that large and respected institutions which don't think economics comes from fairyland do consider HS2 unsound and leave it to them to argue that aspect for me. Why the government, which does believe in economics, is so ready to dismiss them is beyond me, but it does seem to be a general failing of government that once they get a bee in their bonnet about some daft scheme or other no amount of argument even on their own terms will dislodge it.

Passenger numbers are growing year-on-year at a faster rate than the government had ever predicted. If this continues - which looks likely given the factors involved - there won't be space left for passengers or freight on the railway. When you start running out of space, you start limiting economic growth. If you don't build HS2, and leave the classic network to struggle, you're going to incur an economic cost. It's not 'free' not to do anything.

Britain is too small and dense for the journey time reductions to be really significant - especially from Birmingham. And quoting the reductions by themselves is misleading because it fails to take account of the fiddling on at either end - getting to the origin station and getting from the destination station to where you actually want to go - which can already be comparable with the time spent on the main leg even with current schedules. It is the same fallacy that we have already seen applied to conventional rail only on a larger scale. To further speed up those parts of a journey which are already fast may be simple and may make for good headlines but it is very much a case of diminishing returns, and the real gains come from the less glamorous and more difficult task of making the slow parts less slow.

Birmingham is too close to London for it to be significant, but that's why HS2 isn't just a railway between London and Birmingham. The business case relies upon it being used for services running further north, and it just so happens that it makes economic sense to split it into two phases in the West Midlands. The original 2010 HS2 plans specified the London-West Midlands route in great detail but all the economic justification still relied upon the expectation that it would continue to Manchester and Leeds.

Journey time savings of 50% to Manchester and Leeds, and in future 50% to Scotland once the full captive line is built, are not to be sniffed at. These are precisely the sorts of journeys which the speed improvements of HSR make much better - London to Manchester will now be around an hour, which would make it possible to properly split a working day between the two cities. London to Scotland would be only two-and-a-bit hours, which would mean a business day trip would be feasible in a way it currently isn't when it's 4 hours 30.

That less glamorous work is happening right here, right now, all across the network. However, there is only so much that can be done without the need for major works. If you look at the scale of individual interventions you can see they're starting to get bigger and bigger - take a look at the plans for the Norton Bridge flyover and you'll see 6km of brand new railway being built. Any similar interventions will need to be the same scale or larger, because all of the smaller, easier ones have already been done to get us to the state we're in at the moment. The MML is being electrified and upgraded for 200km/h running in places, the ECML is being resignalled all the way from King's Cross to Doncaster, the various important lines around the North of England and in the Central Belt of Scotland are being electrified, the GWML is being completely modernised, the Chiltern Line is seeing the Evergreen projects, the list goes on and on.

The argument that "Europe has high speed rail therefore we ought to have it too" and that it is "embarrassing" that we don't is so dumb as to be unworthy of comment. I find it embarrassing to have a government that uses Muuum, Jean and Johann have great big train sets, why can't I have one too? as a basis of policy.

No, that's not what HS2 is being justified on.

The capacity argument is fallacious. HS2 cannot significantly release capacity on conventional lines because it only serves the endpoints. It can only replace trains which go between London and Birmingham/Manchester/Leeds non-stop. Correct me if I'm wrong, but I don't think there are any, or very very few. All the trains which call at intermediate stations have to be retained otherwise the service to, from and between those intermediate stations goes down the tubes.

No, what it means is that the large number of people who do go on these trains from end to end, despite them stopping during the journey, would then switch to HS2 so that they wouldn't take up any space on the remaining classic services which would still be used by people who live in between. Also, when you're not having to appeal to end-to-end travellers, you don't need to run as fast by skipping as many stops as possible, so more people would be able to use the train. With that, you can then fit more trains on the classic lines since they'll have more regular stopping patterns. If you actually look at the things HS2 Ltd have produced you'll see proposed stopping patterns for the WCML, MML and ECML once HS2 Phases 1 and 2 have been implemented have actually been produced. The only remaining long distance WCML services would be one to Chester/North Wales, one to Scotland via Manchester and Stoke, another to Scotland via Birmingham and one more Birmingham service, all of which would stop at most major WCML stations like Milton Keynes and Rugby.

If a new line on that route or similar is to be built it would be better to build one for freight. This avoids the difficulty of needing to call at lots of intermediate points to be any use because it is already well established that rail freight works best for long-distance haulage between a few major hubs, and it releases capacity for real by not only reducing the number of trains needing to use existing lines, but by removing a whole class of trains with their own acceleration/speed/braking characteristics which makes the business of organising paths for the remaining classes that much simpler.

Freight services run non-stop, so their normal running speed is approximately their average speed, which is what matters over long distances. Even though passenger services may run at faster speeds, their average speeds will be lower since they will stop regularly. As a result, freight and stopping passenger services can actually fit together not too badly. The trains which cause problems are the non-stop ones which run at full linespeed, e.g. the current Scotland services which run non-stop to Warrington Bank Quay or York. These are the ones you put on HS2.

Rather than spend money improving service between London and four towns which already have excellent services - and at the expense of reducing the service available to other towns if the purported capacity improvements are to materialise - I would prefer to see it spent on sorting out things which the current railway network does notably badly. Journeys in directions to or from London are something it does pretty well. Journeys at right angles to that tend to be somewhere between painfully slow and tedious and not worth trying. Many of the routes which used to run at right angles to London no longer exist and those which do remain tend to have a ropy service. If we are going to spend huge amounts of money on the railways I would far rather see it spent on reopening these closed routes and upgrading the existing ones so that the railway becomes a truly useful means of making journeys at right angles to London.

It's not a case of one or the other. The east-west rail link is happening now, as is the improvements being made to TransPennine services. The case for these is improved by HS2, since they become more useful as more north-south services can stop where the east-west lines cross.

It is galling to see such worthwhile projects as East West Rail getting stuck in the mire on the eastern section because a few miles of new construction are needed, while the hundreds of miles of new construction for HS2 don't seem to be a problem. Bedford to Cambridge is one of those journeys which you just don't do by train - the alternatives being either all the way into London and all the way out again, or all the way round via Leicester, Peterborough and Ely, both of which are ridiculous. Uckfield-Lewes - which should never have been closed, and wouldn't have been had it not been for East Sussex County Council pulling strings behind the scenes to save themselves a few quid on bridging it - is another one whose possible reopening is dragged out endlessly over problems which are very minor compared to HS2. A third example is taking ten years to get moving on the Halton Curve, which should be a no-brainer - not being able to run direct trains between Lime Street and the North Wales coast for the sake of a mere ten million pounds to fettle up something that already exists is really silly.

So we shouldn't build HS2 because we're not solving other problems first?

Another area where the money could be better spent is on providing longer trains - by far the simplest way to increase capacity, on any line, not just the West Coast, and also making journeys much more pleasant for passengers. Nobody likes being crammed in like sardines. Voyagers are widely criticised for being far too small, and now the mistake is being repeated with 5-car IEP sets apparently to replace full-size HSTs.

5-car IEP sets which are intended to be coupled up when they leave King's Cross or Paddington, so that they may split to serve different destinations well enough without providing too much capacity.

Virgin run 11-car Pendolinos. How are you going to extend them further? The new IEP sets will be either 234m long or 260m long (2x5 car). How are you going to extend these further, once a 10th car is added to the 9-car sets? London Midland run 12-car 350s in the peak. How are you going to extend these further?

I could go on but I've probably said enough :) There are many, many deficiencies of the current railway network the remedying of which would be a far better way to spend the money than on HS2, and it could be so spent if the political will to do it was there.

DfT's 2007 Delivering a Sustainable Railway stated "Higher speed is not the only or best way of cutting journey times. Nor is it without cost. Increasing the maximum speed of a train from 200 km/h to 350 km/h means a 90 per cent increase in energy consumption. In exchange, it cuts station-to-station journey time by less than 25 per cent and door-to-door journey-time by even less."

I don't see how a ~50% journey time saving (2 hour 8 minutes down to 1 hour 8 minutes for Manchester trains) is less than 25%.

The same DfT that produced this report, back when Labour thought the future of the railways was bio-diesel, now strongly advocates HS2. If you think their current support is unreasonable and that their opinions are biased, then why would it be unreasonable to say that their previous opposition was biased against the idea?

Please describe how you're going to cut journey times between London and Manchester, without using high speed rail. There's only so much you can do to improve things at either end.

As you say, the capacity argument is fallacious. Because of the very limited number of places it would serve, HS2 could not replace long distance fast trains on existing tracks.

You can think this all you like but you're just as wrong as someone saying that the law of gravity does not apply to them. Just because you may not want it to be true, doesn't mean it isn't true.
 