Now we are certain that HS2 isn't going to be what it was to be - at least within the next 15 if not 20 years..
a) the total number of services will lower on the core than it is still to be built for.
b) Curzon St is also being built for the original number of services.
c) Extra journey times because of OOC terminus for first 5-10 years may suppress Birmingham-London demand (as there is also +10 min walking cost at Birmingham end for eg. Wolverhampton traffic, no Cov traffic, extra walking for any other suburban in the area).
This makes me think, yet again, that connecting HS2 to more interesting railways would still be worth doing, more than ever.. the Berkswell overpass could be so much better as a junction.. link it with Cov-Brum here. Divert Cross-Country and the classic WCML (ie. Cov) traffic to New Street this way.
a) the total number of services will lower on the core than it is still to be built for.
b) Curzon St is also being built for the original number of services.
c) Extra journey times because of OOC terminus for first 5-10 years may suppress Birmingham-London demand (as there is also +10 min walking cost at Birmingham end for eg. Wolverhampton traffic, no Cov traffic, extra walking for any other suburban in the area).
This makes me think, yet again, that connecting HS2 to more interesting railways would still be worth doing, more than ever.. the Berkswell overpass could be so much better as a junction.. link it with Cov-Brum here. Divert Cross-Country and the classic WCML (ie. Cov) traffic to New Street this way.
Then... either: terminate at Curzon St .. or build HS2 to New Street connecting line, either near Curzon St, or the Duddeston area. I don't know which is better - seems six of one, half a dozen the other.
- reduces journey times of XC and Classic-WCML.
- frees up capacity on the dual-track Cov-New St traffic, massively - improves suburban services.
- win for local/national traffic! - something they could actually sell!