
Why not just get the Ansaldobread v250s for cheap?
![]()
Dec 08, 2005 http://www.birminghammail.co.uk/news/local-news/metros-rubbish-trams-up-for-sale-15863Centro wants a brand new fleet of trams because the older Ansaldo Transporti models have been dogged by unreliability and poor build quality.
The trams have been a figure of fun - described publicly by operator Midland Metro, which owns them, as "rubbish" and having wiring like "plates of spaghetti".
Horrified bosses had discovered each tram was built to a different design, and currently one tram has been taken out of service to be cannibalised for spare parts.
I thought there was a big hole in the ground being dug for them?
Hopefully not Hitachi but I bet it will be.
Im sure China could teach them a lot about burying a wreck of a high speed train to try and keep it out of the journalists eye :P
![]()
![]()
I realise that my OP assumes that HS2 will go ahead of course.
Do posters think that any train manufacturer bidding for the HS2 contract would be required at least to have an assembly factory in the UK rather than importing finished units from abroad?
Also, given there are currently 56 Pendolino units on the WCML made up of 35 11-car units and 21 9-car units, how many units of what composition might be required for HS2? I understand that many of the Pendos will still be required of course on the classic route between London and Glasgow anyway.
The forthcoming 374s have a top speed of 320kph. Given that the oft stated speed of HS2 is 360kph, I'd be surprised if it wasn't simply a latter day, slightly upgraded edition of this (providing that it lives up to expectations). Why waste money experimenting, when you can basically place a follow on order?
In their 2012 Economic Case for HS2, the DfT have suggested that the completed "Y" network will require (quite astonishingly, in my opinion) 105 x 200m HS2 captive sets, 68 x 200m classic compatible sets and 15 x 260m classic compatible sets.Also, given there are currently 56 Pendolino units on the WCML made up of 35 11-car units and 21 9-car units, how many units of what composition might be required for HS2? I understand that many of the Pendos will still be required of course on the classic route between London and Glasgow anyway.
aren't 374s a bit of overkill as they can run on 3 different voltages?
Well, yes, although they may need to run on 2 voltages (someone else might know what the electrification plan is for HS2)
They could well have an advantage, but it would be a fairly slim advantage as the number of sets being talked about is not insignificant in its own right and would be an order worth chasing.I imagine that many suppliers would be interested in supplying the trains with a European gauge, but that the trains to British classic gauge will be much less attractive, as they'll be a unique design. Hitachi, having a plant producing the classic gauge 800 and 801 might have an advantage here, especially if the DfT wants one supplier to supply all the trains?
I can't imagine there will be too many major shifts in things between now and then, other than Hitachi having their first TSI offering available for off-the-shelf orders by then.As the tendering process is not likely to be for several years yet, it won't be current models that are offered.
Of course. 'Velaro' is simply the Siemens name for their whole family of high-speed EMUs (similar to Desiro and Nexas for their regional and suburban multiple units respectively) and not just one particular version. Their HS2 bid won't be the Velaro D, the Velaro E, the Velaro RUS, the Velaro CN or the Velaro e320, it will be the next updated version tweaked to meet the HS2 requirements and probably called the Velaro GB or Velaro UK.Having said that, if Siemens put in an offer it'll likely be an evolution of the Velaro?
The forthcoming 374s have a top speed of 320kph. Given that the oft stated speed of HS2 is 360kph, I'd be surprised if it wasn't simply a latter day, slightly upgraded edition of this (providing that it lives up to expectations). Why waste money experimenting, when you can basically place a follow on order?
12 years after the original? Pretty sure by then things will have changed once again...
You could've said that about the Class 377 12 years ago, yet the design was used again recently for the LM 172s and 387s. Depends how successful the 374s are in the UK, but since they're based on an ICE I don't see why a variation on them cant be used for HS2.
There would not necessarily need to be one, but the powers that be may choose to require it in the specification for qualification or include it as a scored component of the competition.Why would there necessarily have to be a manufacturing facility in the EU for the HS2 rolling stock? The HS1 class 395s were built in Japan, for example.