erikvd28
Member
Is it already known when they will start with the Curzon No.2 Viaduct?
Bromford tunnel TBM should be done any day now.
Bromford tunnel TBM should be done any day now.
I have slightly different take - the article is about prioritising contracts for "renegotation and rebaselining" which not quite the same as reprioritising for completion... It is mainly and indicator of where thing have gone wrong on timescale and cost so far.Not sure if should start new thread, or continue this HS2 reset one.
Construction News has outlined that 2 of the main civil contracts will be prioritised (the Midlands ones), because need to test the trains. The Chilterns one is civil substantially complete. The London tunnels to Euston should start early next year and take around 18 months.
Seems there is a firebreak of about 9 months before starting on railway installation to allow for weather delays (but this might be reduced if progress is good.)
![]()
HS2 prioritises two civils contracts in reset negotiations
HS2 Ltd is prioritising the renegotiation of a pair of major civils contracts as part of a sweeping reset of the high-speed rail programme. Alan Morris,www.constructionnews.co.uk
The junction etc at Handsacre is all agreed, its just at what point that any construction is expected to be programmed.North of Delta junction there is little progress, it seems to be kicked into the long grass.
No real construction has taken place except for the underbridges east of Lichfield for the WCML (completed 2023) and A38 (in progress), the bridge over the M42 north of Junction 9 (completed Christmas 2022) and the A5 being contra-flowed near Tamworth for close to 3 years - with no actual construction taking place.
There have also been a few minor road diversions along the way, but numerous proposed structures haven't even started utility diversions for example.
Is there any word on how they are actually going to rejoin the WCML at Handsacre?
Or is it that classic rail access at Calvert and Washwood Heath is critical to the rail installation phase so it needs to be accelerated?
I thought they could be tested (performance, ride, braking etc) on the basis of one train in use (equivalent of old one engine in steam) without signalling.They will need the signalling system and all its related ingredients finished before testing can start.
That's all to be controlled from Washwood Heath I think.
The HS2 train spec is to reach 360kph in 40km (strictly, within 535s), but "no residual acceleration at the maximum service speed of 360km/h is required". I'd be really surprised if the trains will be capable of ever reaching 10% over 360kph.My understanding is can test cab signalling on any ECTS equipped line, but can't do the 110% of max service speed test anywhere else in UK, unless got at least 50 miles of high speed track
CR is in no small part successful because TOCs have been removed from the ability to move passengers. Those people still need to get to work so the wonderful passenger numbers to use on metric were already there. perhaps a better measure of success would be to remove those commuters who have always travelled and see how many new passenger journeys are made each year..... And then what? Send everybody home?
HS1 and HS2 are being built for completely different reasons.
I really hope so. The parallels between HS2 and crossrail are evident (both poorly managed, late, expensive, capacity infrastructure projects) and people doubted CR could be rescued. Now it's a resounding success.
Is the junction at Handsacre actually agreed? I mean I actually don't believe that it will ever end at Handsacre because Colwich/Stafford its self is already extremely congested and my last few Avanti trains to Liverpool from Euston have been either held or delayed near Stafford/Colwich due to "congestion" - (Train Manager announcement)The junction etc at Handsacre is all agreed, its just at what point that any construction is expected to be programmed.
In terms of its layout, yes. Unless someone puts phase 2A back on the table, thats where it ends.Is the junction at Handsacre actually agreed? I mean I actually don't believe that it will ever end at Handsacre because Colwich/Stafford its self is already extremely congested and my last few Avanti trains to Liverpool from Euston have been either held or delayed near Stafford/Colwich due to "congestion" - (Train Manager announcement)
Are you not just transferring the whole reason why HS2 is being built up the line..
The HS2 Reset hasn't happened yet, although we know the Euston approach tunnels will be built in 2026-7.Plans to reboot the regeneration of Euston and the surrounding area are gathering pace following the HS2 reset.
Note - this is to do with current station, taxi/bus area and getting ready for wider schemes in the Euston development. Not HS2 station.![]()
Euston reset kicks off £300m design and engineering role hunt
Five-year deal covers station overhaul and wider regeneration districtwww.constructionenquirer.com
Plans to reboot the regeneration of Euston and the surrounding area are gathering pace following the HS2 reset.
A quick look on Google Earth shows that the construction compounds north of Delta Junction to Handsacre, bar those mentioned above, appear to have been abandoned some time ago. Could it be that some contracts have been delayed to meet treasury demands. Have there been any signs of a slowing of construction between Delta and Old Oak?
The Handsacre deferral was the first element of cost control for HS2, before any of the later Phase 2 cancellations were made.A quick look on Google Earth shows that the construction compounds north of Delta Junction to Handsacre, bar those mentioned above, appear to have been abandoned some time ago. Could it be that some contracts have been delayed to meet treasury demands. Have there been any signs of a slowing of construction between Delta and Old Oak?
Thanks for sharing - is that four years from when the rest of Phase 1 opens in 2035?Looks like handsacre is delayed for 4 years https://www.ft.com/content/ae083314-1a16-4c19-94db-0548b7b0d15b
The limit has been in place for a while so it is very easy not to be aware. One of the review learnings from earlier this year was that the scale of simultaneous HS2 works was also contributing to construction inflation (plant and labour availability) hence focusing on reduced mileage (and structures) under construction at any point in time reduces cost pressures.Thank you for the information. I wasn't aware that there had been a 7bn annual cap given to the project. It makes sense that they should progress the central section and have something to show for their efforts as soon as possible. Getting passengers on the trains will change everything although still a long way off.
Water Orton & Delta Junction: too late to change plans thereThe Handsacre deferral was the first element of cost control for HS2, before any of the later Phase 2 cancellations were made.
At Lichfield they finished the WCML underpass to the south and are still working on the A38 changes for HS2 to the east.
The declared "pause" was to have been 2 years, but we are past that time now.
They are also still working on all sections of the Water Orton viaducts of the Delta junction, not just the Old Oak-Birmingham side.
Thanks for sharing - is that four years from when the rest of Phase 1 opens in 2035?
I can't see the full FT piece, but the 4-year delay probably means the Network Rail job at Handsacre is pushed into CP8 (2029-34), or whatever it will be called under the GBR funding regime.Its not clear, i dont believe it would be on top of 2035 though. Nor is it clear whether thats taking into account the 2 year delay already.
Changing from HS2 at Birmingham would be slower than direct WCML services for essentially all journeys, so that's a non-starter. Saying that you aren't going to attempt to benefit passengers north of Birmingham or provide any capacity benefits on the WCML is an option, but it probably pulls you straight back into the question of whether it's even worth completing to BirminghamLurker here playing devil's advocate, but given HS2 needs to cut costs is a Handsacre connection to the WCML even really necessary at this point?
Given that it's clear now that HS2 is going to be operating for years without one, is it really that much trouble for passagers travelling north of Birmingham to change at Curzon street for a HS2 continuation service departing from new street?
If HS2 was built to Crewe, could the Handsacre connection be abolished? Obviously yes, it could, but wouldn't be popular in Stoke. Would this allow sufficient connections to Manchester? Would it save a meaningful amount of money, that would offset a bit of the cost of getting to Crewe?
Plans for London Euston are yet to be finalised and rail industry leaders have warned that capacity constraints on the west coast mainline could mean that HS2 trains joining the network actually worsens existing services. It is understood that the latest deferral was partly needed to allow fuller consideration of how the challenges of running full services from central London to the north could be met.
It's highly unlikely that cancelling handsacre would get you a meaningful distance towards Crewe. Which is going to cost many billions.If HS2 was built to Crewe, could the Handsacre connection be abolished? Obviously yes, it could, but wouldn't be popular in Stoke. Would this allow sufficient connections to Manchester? Would it save a meaningful amount of money, that would offset a bit of the cost of getting to Crewe?
HS2 put the cost at up to £7bn before it was cancelled. It will be more like £10bn now.