Hi, does anyone know when there will next be a blockade of the route out of Euston, for the HS2 works that are happening there? Thanks.
Isn't work on Euston for HS2 stopping?

As it happens there appears to be a T3 possession on the fast lines today out as far as West London Junction. Trains on two tracks, with crossover moves slow to fast at North Wembley Junction.

Only lines B and C open into Euston.
 
Last edited:

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,662
Hi, does anyone know when there will next be a blockade of the route out of Euston, for the HS2 works that are happening there? Thanks.
The blocks were never more than half stations anyway on the high side. The next planned all line block of Euston is Easter 2024, but that is all NR work causing that.
Isn't work on Euston for HS2 stopping?

As it happens there appears to be a T3 possession on the fast lines today out as far as West London Junction. Trains on two tracks, with crossover moves slow to fast at North Wembley Junction.

Only lines B and C open into Euston.
There will be some HS2 work up until Xmas.
 