HS2 Ltd has announced the winners of the contracts to supply its rail systems (track, power, signalling etc).
mediacentre.hs2.org.uk
The winners are:
Track - Ferrovial/BAM Nuttall JV - rail will be supplied "via" Network Rail, slab base by Voestalpine/Porr
OHLE - Colas (using SNCF's V360 OCS design)
Tunnel & Lineside Equipment - Costain
High Voltage - Siemens-Costain JV
Telecoms - Siemens
3rd Party Telecoms- Hitachi-Telent JV
Command & Control (ETCS etc) and Engineering Management - Siemens
There are no details of costs either individually or overall, nor any delivery timescales.
It must represent a significant government approval for these contracts to be awarded.
There will be a 10-day standstill period before contract signature, to allow for objections.
Network Rail supplying the actual rail is quite a surprise, as opposed to a private-sector contractor.
The steel contract for rail will be a sensitive issue in manufacturing terms.
Siemens looks like the clear winner on the technical side.
Names notably absent from the above are Alstom and Balfour Beatty, although they have large contracts elsewhere on HS2.
The Chinese bids were all eliminated.
The OHLE contract did not go to any of the current Network Rail preferred suppliers (SPL, BB etc)
These contract awards are almost 2 years late on the original schedule.
They have obviously been in negotiation for a long time, in order for the full set to be announced simultaneously.
HS2 confirms rail systems contract winners
HS2 today named the teams that will deliver the high-speed rail project’s state-of-the-art track, signalling, communications, and other systems.
The winners are:
Track - Ferrovial/BAM Nuttall JV - rail will be supplied "via" Network Rail, slab base by Voestalpine/Porr
OHLE - Colas (using SNCF's V360 OCS design)
Tunnel & Lineside Equipment - Costain
High Voltage - Siemens-Costain JV
Telecoms - Siemens
3rd Party Telecoms- Hitachi-Telent JV
Command & Control (ETCS etc) and Engineering Management - Siemens
There are no details of costs either individually or overall, nor any delivery timescales.
It must represent a significant government approval for these contracts to be awarded.
There will be a 10-day standstill period before contract signature, to allow for objections.
Network Rail supplying the actual rail is quite a surprise, as opposed to a private-sector contractor.
The steel contract for rail will be a sensitive issue in manufacturing terms.
Siemens looks like the clear winner on the technical side.
Names notably absent from the above are Alstom and Balfour Beatty, although they have large contracts elsewhere on HS2.
The Chinese bids were all eliminated.
The OHLE contract did not go to any of the current Network Rail preferred suppliers (SPL, BB etc)
These contract awards are almost 2 years late on the original schedule.
They have obviously been in negotiation for a long time, in order for the full set to be announced simultaneously.