HS2 Project Update, January 2023

Status
Not open for further replies.

Fazaar1889

Member
Joined
5 Oct 2022
Messages
629
Location
South East
The HS2 team have posted another update for January 2023. They talk about apprenticeships and bridges that have started to take shape. They're planning to go diesel-free by 2029 which is interesting... because don't they plan to finish construction for phase 1 around 2029?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,904
Location
Mold, Clwyd
There's nothing there that hasn't been covered separately.
The envelopes for completion of the authorised sections are: phase 1 (Birmingham/Lichfield) 2029-33, and phase 2a (Lichfield-Crewe) is 2030-34.

In the Northolt tunnels, TBM Shushila has advanced 77m in the last week to 573m, so increasing its rate, but its mate Caroline appears to have been stopped for a week.
On the map, Shushila is now about level with the Uxbridge branch of the Met.
 