But the real goal is to emulate our continental cousins in providing the UK with High Speed rail network connecting what are deemed the principal commercial centres that will gain economically by having faster connections to London while addressing nasty CO2 emmissions from domestic air services.
This is the 'new found' holy grail discovered by our UK politicians and so this is what we are going to get if all sides agree it is affordable over the project lifespan (dilutes the current economic woes arguement) - which appears the case at present. As the consultation blurb remarks - we in the Uk are getting left behind due to our poor transport infrastructure while our neighbours push on with developing their High Speed networks.
OK - so the current consultation will continue with defining and refining the precise details of the proposed route but messing around with alternative schemes which involve large scale modification of the existing lines of way (and therefore inevitably the existing infrastructure) is not going to be seen by the politicians as delivering the ultimate goal of a new sparkling line with sleek new trains. It is cleara showpiece project 'that Britain can be proud of' is what is required.
In any case, every crossing or parallel work site with the existing infrastructure has the huge potential to inflate estimated costs exponentially after the detailed surveys have been done (aka WCML) let alone the impact on lineside properties which will galvanise a whole new group of opponents. People will reasonably complain about the new line passing through the pristine countryside (wherever that may be) but the government will know that building on greenfield sites or uncomplicated lines of way (ex GCR) is going to be cheaper and less disruptive to existing transport corridors than building adjacent to existing lines through hundreds of back gardens / streets etc.
I'm confident it will happen but share some of the concerns regarding integration with existing rail and lack of capacity on HS2 itself for continental workings or indeed high speed freight which doesn't even figure.
This is the 'new found' holy grail discovered by our UK politicians and so this is what we are going to get if all sides agree it is affordable over the project lifespan (dilutes the current economic woes arguement) - which appears the case at present. As the consultation blurb remarks - we in the Uk are getting left behind due to our poor transport infrastructure while our neighbours push on with developing their High Speed networks.
OK - so the current consultation will continue with defining and refining the precise details of the proposed route but messing around with alternative schemes which involve large scale modification of the existing lines of way (and therefore inevitably the existing infrastructure) is not going to be seen by the politicians as delivering the ultimate goal of a new sparkling line with sleek new trains. It is cleara showpiece project 'that Britain can be proud of' is what is required.
In any case, every crossing or parallel work site with the existing infrastructure has the huge potential to inflate estimated costs exponentially after the detailed surveys have been done (aka WCML) let alone the impact on lineside properties which will galvanise a whole new group of opponents. People will reasonably complain about the new line passing through the pristine countryside (wherever that may be) but the government will know that building on greenfield sites or uncomplicated lines of way (ex GCR) is going to be cheaper and less disruptive to existing transport corridors than building adjacent to existing lines through hundreds of back gardens / streets etc.
I'm confident it will happen but share some of the concerns regarding integration with existing rail and lack of capacity on HS2 itself for continental workings or indeed high speed freight which doesn't even figure.