The access in and out of Toton from the south is quite limited. The route through Long Eaton town station only has access to Derby - the east chord has been built on. The goods line has access to Nottingham and Leicester via the High Level goods line.
fair point, do you think it would be quicker for drivers to change cabs & reverse at Toton, continuing to Nottingham via Beeston?Running Derby/Leicester to Nottingham via the Trowell-Radford line is just insane - a very slow journey for what benefit?
Do you think it would be quicker for drivers to change cabs & reverse at Toton, continuing to Nottingham via Beeston?
For those looking the quote in question is on Page 40, not 41.
At a quick glance I couldn't see a date of publication for the plan but I suppose things could have moved on as far as HS2 is concerned. Given that the intended route has been with various Ministers for the last year or so and they'd have fiddled with it to suit their political ends no doubt.
HS2 has to join WCML somewhere up near Manchester and maybe Golborne is sensible, although I didn't envisage it going quite that far north on this phase.
It's interesting that whilst the mention of Manchester could cover links to both the airport and central, there is no mention of Crewe or anywhere else as a link point.
There are 2 double track lines into Toton from the south:
The west of the 2 has access only from the West, I guess that will be used for HS2 -straightest option.
The Easterly line has Chords to the east and west. At present I think it can access Leicester and Nottingham but not Derby. I think this would remain the freight/Pax access to Toton. Access towards Derby would be added with additional flying junctions where the 'Leicester/power station' chord reaches Trent Junction
.
Considering that we are on a HS2 thread, the matter of drivers changing cabs and reversing would indeed be one to cause concern to those who see High Speed routes as a modern and fast railway method of transportation.
Is it worth checking if this novel idea had ever been considered by the operators of the Japanese Shinkansen rail services...:roll:
At the same time; the Chancellor has announced (in the autumn statement) that he envisages trimming £1.5 bn from the Phase 2 costs. The easiest way to achieve this would be to cut the proposed northwestwards extension of Phase 2 into Lancashire, so that, at Phase 2, the line will stop at the Manchester city centre terminus.
Absolutely right on the last point; if the WCML link is at Golborne, there would be little point in having another link further south at Crewe; and contrariwise, if the link is at Crewe, there would be no point of Golborne. Notwithstanding the CP5 publication, I strongly suspect that the Golborne link is the former plan (reflecting planning up to around April last year), while the 'south of Crewe' link is the one that will be found in the forthcoming announcement.
A possible Golborne link only made business sense as providing classic-compatible services from Euston to Glasgow north of Phase 2. Former Secretaries of State ensiaged that Phase 2 would represent the full extent of the system for a number of years, and hence tried to maximise the apparent benefit that could be demonstrated on the Scots services following Phase 2 by configuring the WCML link as far north as possible. But it turns out the Scots weren't interested; what they wanted was Phase 3 (within Scotland) as soon as possible - indeed if possible concurrently or in advance of Phase 2.
At the same time; the Chancellor has announced (in the autumn statement) that he envisages trimming £1.5 bn from the Phase 2 costs. The easiest way to achieve this would be to cut the proposed northwestwards extension of Phase 2 into Lancashire, so that, at Phase 2, the line will stop at the Manchester city centre terminus. If there is then a link from Phase 2 onto the Northern Hub within Manchester, that would allow some Scots classic compatible services to join temporarily at Manc. Others would have to carry along the WCML all the way south to Crewe; which is where the Liverpool classic-compatibles will join.
Of course. once the Scots have decided which side of the country (west or east) they intend to link Phase 3 to Phase 2, then it could become necessary to revive the northwestwards extension. But, if the Phase 2 link to Liverpool is at Crewe, a Golborne link onto the WCML would be largely redundent - the prioirty would be for a link onto the Liverpool-Leeds line around Culcheth. If there is to be another HS2/WCML link north of Manchester, I would expect it to be some way north of Preston.
Given that HS2 will need to pass through/over Trent Junction, that would be a potential junction on HS2, however there isn't unlimited space at Trent Jn, you have housing to the North, Trent Lock to the south West. It's also in the Trent flood plain, so anything new will be viaducts rather than tunnels, so noise levels become an issue for nearby housing.
I disagree, the issue at hand was the time penalty of classic compatible services running at 110mph rather than 125mph tilting to Scotland
Although this hasn't stopped the Dutch...
--- old post above --- --- new post below ---
What's to stop the classic compatibles tilting? The French have shown high speed and tilt can be done.
I agree. Communist dictatorships are not the way forward.As any wise man will tell you - in the time it takes us to build a new station, China builds an entirely new city. It shouldn't be this way.
What's to stop the classic compatibles tilting? The French have shown high speed and tilt can be done.
Yes but you're using the Netherlands and France as examples, which only goes to underline ever more boldly we do things in this country
Due to numerous factors, but predominately due to the deadly tag-team of NIMBYs and the Unions, this country has not got the infrastructure it deserves. Other European countries are far, far, far more advanced because they don't have the same handicaps as we do.
As any wise man will tell you - in the time it takes us to build a new station, China builds an entirely new city. It shouldn't be this way.
Be careful what you wish for - in a Chinese regime, you'd have no chance of protesting about Preston Bus Station - it'd have been knocked down in under a day with no chance of petitioning any councillors![]()
Indeed. They'd probably demolish it with the passengers still inside.
Have they? Im sure i remember HS2 Ltd responding to a question about tilt by replying that there are no high speed (186mph+) trainsets with active tilt and no plans by any manufacturer to produce any - i think due to the weight penalty. They've also said that cost effective upgrades have been identified which would minimse the time lost by lack of tilt on the northern WCML.
Chris
The power cars would not tilt, because that would entail developing a whole new powered and tilting bogie
The end trailers (adjacent to the power cars) would have their motors removed to make room for the tilt system
This testing cycle was repeated after the Fiat hydraulic tilt system was replaced by the Alstom-designed electromechanical system which was expected to provide higher reliability, lower mass, lower volume and lower cost.
It's very odd that when you look at the DfT website under 'Our announcements' there's a heading - 'High Speed Rail - Statement for Parliament' dated 17th Jan 2013 i.e. today.
When you click on it you get a page about a written statement from Justine Greening given on 27th March 2012. Then it says the page was updated today.
So why should a page written in Spring 2012 be changed 9 months later or is someone at the DfT manipulating the record?
At the end of this month I will receive HS2 Ltds route and station advice for high speed rail lines to Leeds, Manchester and Heathrow. This is an important next step in our aspiration for a truly national high speed network, as set out in our programme for government. Phase 2 of High Speed Two will spread the benefits of high speed rail further across the country, increasing capacity and enhancing connectivity by extending high speed rail lines to Leeds and Manchester and connecting other major conurbations in the North and in Scotland through seamless transition onto the existing network.
In fulfilment of its remit, HS2 Ltds advice will include options for stations in Manchester, Leeds, South Yorkshire, the East Midlands and at Heathrow Airport, as well as advice on the case and potential locations for additional stations. It will also cover the impact of Phase 2 of the network in releasing capacity on the Midland and East Coast main lines, as well as further extending the benefits of released capacity within the west coast corridor.
I will consider this advice objectively and in detail over the coming months, and I intend to publish it in the autumn together with a government response setting out initial preferred route and station options. An important part of this process will be to consider the views of delivery partners in the cities where HS2 stations may be located, including any underpinning evidence which they have identified. Understanding local desires and plans for development will be crucial in helping me reach initial preferences for station locations. I am particularly keen to ensure that the network best supports the economic potential of the cities and regions it serves, through well-integrated station locations that build on local and regional plans.
Minimising the risk of blight is a serious consideration, and it is for this reason that I expect to publish HS2 Ltds advice once I have reached a view on routes and station options. Publishing a detailed range of possible options without an indication of the governments preferences would generate unnecessary and harmful blight across areas that ultimately might never be affected by the lines. I will be working with national environmental stakeholders to discuss key sustainability issues and how best to consult on lines of route going forward to help meet the needs of different stakeholders and the public.
Following publication, the input of interested parties, including MPs and their constituents, will be valuable to help further develop the proposals that will go forward for subsequent formal public consultation. Only once a full public consultation has been launched and completed will any decisions be reached.
When preferred route options are published in the autumn we will consult on and introduce an exceptional hardship scheme to assist property owners impacted by the proposals. Further, in order to reduce uncertainty for those affected by the proposals, and to ensure that the benefits for passengers and business of a national high speed rail network are realised as soon as possible, I have asked my officials to explore options for bringing forward formal public consultation on Phase 2 of High Speed 2 to 2013, and I will set out my proposed timetable later this year.
It's very odd that when you look at the DfT website under 'Our announcements' there's a heading - 'High Speed Rail - Statement for Parliament' dated 17th Jan 2013 i.e. today.
When you click on it you get a page about a written statement from Justine Greening given on 27th March 2012. Then it says the page was updated today.
So why should a page written in Spring 2012 be changed 9 months later or is someone at the DfT manipulating the record?
The Coalition Government in its infinite wisdom decided that instead of each department having its own website (roughly 24) they would move to a single website for the entirety of Government, so far theyve moved 6 and its a total mess, to be honest it was a total mess when they just moved Dft and DCLG, they also designed a website with what looks like early 2000's mobile phone internet in mind.
But back to your question its a repost as its a new website and the original was on the old website.