Purple Orange
On Moderation
If the eastern leg is cancelled, what services should be running on the line upon completion?
The HS2 network would have the following:
Stage 1:
Stage 2 (should Manchester - Leeds NPR be built)

The HS2 network would have the following:
- 3 London - Manchester
- 3 London - Birmingham
- 2 London - Liverpool
- 2 London - Scotland
- 1 London - Macclesfield
- 2 Birmingham - Manchester
- 1 Birmingham - Scotland
- 6 spare London paths
- 3 spare Birmingham paths
- 4 available Manchester paths, should there be no NPR.
Stage 1:
- 3rd Birmingham - Manchester (200m)
- 3rd London - Liverpool (200m)
- 4th London - Manchester (200m)
- 4th London - Birmingham (200m)
- 1st Birmingham - Liverpool (200m)
Stage 2 (should Manchester - Leeds NPR be built)
- Double all three Birmingham-Manchester services to 400m
- Double the 4th London - Manchester to 400m.
- Add a 5th and 6th London-Manchester at 400m, then extend 4 to Leeds (two split to head to Newcastle)
- Run 2 of the Birmingham-Manchester’s on to Leeds (1 splits to head to Newcastle)
