Definitely not the views of the majority on here.
You think the majority of people on this site think their should only be one class of carriage?
Definitely not the views of the majority on here.
1+1 would never take off.
The markup on the ticket price would be so large noone would ever bother.
That kind of clientele will just take a plane out of City airport.
No it couldn't. Not successfully. Two words: Utter outrage. This is one for those who understand how real people think.
Huh?? You think this is the 80s? Actually, in today's world, it is a massive moral issue. The enormous disparity is in fact something which gets a lot of people very exercised. To this end, a HS2 pampering the super-elite could be the very iconic thing which loses the conservatives the next election. Despite Jeremy Corbyn.
1 + 1 seating is offensive to my own eyes
I think heathrow express first class has 1+1 seating, which presumably does work for them?

I think heathrow express first class has 1+1 seating, which presumably does work for them?
That is IIRC a way to let people keep luggage with them.
They are standard 2+1 seats.
On HS2 that would just lead to huge corridor space wasted in the middle.
People aren't going to pay huge sums of money for 1+1 seating on such a short journey. Captive journeys will last 100 minutes at most and most will last far less than that.
Seems rather strange to consider 3+3 seating when new stock these days tends to be 2+2 and fewer seats so more people can stand.
Depending on passenger numbers it could be possible that HS2 phase 1 opens with 2+2 seating and then as passenger numbers grow then there could be options for 3+2 seating to stay to appear on some of the busier services as phases 2 is completed.
Really the line should be built to Shinkansen gauge - but that wouldn't tick the relevant TSI boxes so we are stuck for no real reason other than european bureaucracy.
I don't think this would be practical. Looking at train width:
- 2.7m - current typical width of British trains
- 3.15m - UIC structural loading gauge (presumably HS2 is proposing to use this?)
- 3.4m - Shinkansen structural loading gauge
The 3+2 seating option is in general use on Shinkansen, but not in general use in European high speed trains (which are presumably designed for UIC gauge). So unless we could find a way to comfortably provide another seat width using the extra 45cm that UIC gives, we'd need to use the Shinkansen gauge. This would require changes to HS2's specification, changing formation cross section and structural clearance. Once you decide to do that, you would really need to use the full width right from the start.
Platforms are another matter, but I hope HS2 goes with a UK height platform at the UIC lateral offset, so level boarding will be possible universally, otherwise all the classic compatibles (the majority of the fleet to begin with) will face a large step down from the train at all the new stations including Euston.
You are assuming they still procure two sets. I have said elsewhere that there will be a substantial amount of gauge works required on the existing network. There is a tipping point where the extra works to provide the gauge for the captive sets could mean you just order the one type.
That would be enormously expensive with the long stretches of classic compatible running they are proposing to implement.
It is far more likely we will get an entirely CC fleet.
I think that was what he was implying.
Makes sense to me, especially in the beginning when the only fully UIC route will be to Birmingham. There'll always be the flexibility to order some wider or even double-decker stock subsequently for more capacity as the traffic grows, but it's interesting Japan have phased out double decker Shinkansens on their network. Those trains were slower than the latest units though and they're chasing uniformly higher speeds and further route extensions, sometimes with their equivalent of our classic compatibles, the Mini-Shinkensen sets. They're also looking at a small degree of tilt to raise speed on the earliest high speed lines and even gauge changing trains for extensions (not something I thing we'll ever need to consider unless a Ffestiiog branch is proposed!).
Wasn't one of the arguments for UIC that rolling stock should be cheaper as it's a common size, rather than the UK's oddball gauge? Even if it's not connected to HS1, isn't asking Alstom for a TGV Duplex or Siemens for a Velaro going to be easier than something custom? Isn't the danger of going for Shinkansen spec that we swap one odd size for another?
The Japanese have the opposite problem to Britain - stagnant or falling passenger numbers on many railway routes
I have read that daily high speed commuting on certain mid distance routes into Tokyo has been hammered by property price stabilisation after many years of stratospheric inflation. Many more people are able to actually afford to live nearer their jobs today.
Which is rather a good thing in a political context...
Indeed, if HS2 will just make Brum a London commuter suburb, it should be cancelled forthwith and replaced with a cheaper 125mph capacity build (basically adding 2 "fast-plus" tracks to the WCML to solve the south WCML capacity issue, which is the only ground under which I think it is justified).
. . . and from a environmental point of view.
I agree with you about the formation, although running slower might save a bit on the energy bills.HSTEd said:But 125mph won't be significantly cheaper than the high speed line.
It would have all the same equipment and require almost the same tunnels and everything.