Assuming you can actually get to a point where the reduced capacity of a single track scheme matters.
And we are not going to get near that for this Scotland route.
Your single track high speed railway would be ruinous for capacity on Phase 1. You need as much possible slack (i.e. time saving by running at 360km/h rather than the timetabled 330km/h) as possible to get all the trains in the right order by Birmingham. Single track with passing loops wouldn't let you do any of that unless you want to end up with a route which is more double-track than single track, at which point you're not saving much money by doing that in the first place. Double track sections would need to go where the timetable demands rather than where it's cost-effective. Even then, I don't think you're going to get a lot of a cost saving even where you have twin-bore tunnels, as their safety case relies upon having intermediate cross-passages. Instead of having a shaft every three or so kilometres and a cheap cross-passage every few hundred metres you would have to have a shaft every kilometre or so, or have a parallel escape bore. Really, there's not a vast amount of point in building single-track high speed lines, especially when they require a lot of new civil engineering.
That said, there are actually single track high/higher speed railways. The French have plans to build an LGV branch line between Poitiers and Limoges, which will be single track 320km/h with passing loops. One of the more distant Spanish LAVs has been half-built with some of the separate civils for the second track left unfinished. There's also a higher-speed line in Sweden built as single track with passing loops. Normally, the economics of building a new line require the old line being busy enough to justify double track in the first place, but it seems that some European countries just build HSR lines for the sake of speeding up every journey rather than because it's genuinely necessary.