HS2 construction updates

Status
Not open for further replies.

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,898
Location
Mold, Clwyd
Construction of Colne Valley Viaduct. Christ this machine is big
It's difficult to judge overall progress from the videos/photos so far, as they are often from close up.
The viaduct has 56 piers (58 with the abutments), and apparently has a 2-year build timescale (with a further year for finishing).
So the girder needs to advance at about a pier every two weeks.
It was launched on May 31, so has had 5 months to build up momentum.
However, I can only count about 5-6 completed spans in the recent photos (crossing the A412).
The girder can only go as fast as the piers are constructed ahead of it, plus curing time, but I think these are well in hand now with the four piers in the lake now complete.

Tunneling progress is impressive but once started is generally invisible to the public until the final breakthrough.
By contrast the Colne Valley Viaduct is right in the public gaze so will become an iconic symbol of HS2 progress.
I see steelwork for the 450m Wendover Dean viaduct is being delivered to site this month - this will be another very prominent structure.


Edit:
Something else you can see from the drone video in post #1496 is the new bridge which will take the Princes Risborough-Aylesbury railway over HS2 near Stoke Mandeville.
It's visible under construction lying alongside the railway at 9.09-25 in the video.
There's a Chiltern train pictured alongside it for a handy reference.
 
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Joined
18 Oct 2017
Messages
215
It's difficult to judge overall progress from the videos/photos so far, as they are often from close up.
The viaduct has 56 piers (58 with the abutments), and apparently has a 2-year build timescale (with a further year for finishing).
So the girder needs to advance at about a pier every two weeks.
It was launched on May 31, so has had 5 months to build up momentum.
However, I can only count about 5-6 completed spans in the recent photos (crossing the A412).
The girder can only go as fast as the piers are constructed ahead of it, plus curing time, but I think these are well in hand now with the four piers in the lake now complete.

There was a bit of a "go slow" crossing the A412 as they could only work there at night when the road could be closed. (In case it's not obvious to readers, you can't really be dangling hundreds of tonnes of concrete on cables above live traffic lanes!) It seems to have progressed a bit faster since.
 

12LDA28C

Established Member
Joined
14 Oct 2022
Messages
5,058
Edit:
Something else you can see from the drone video in post #1496 is the new bridge which will take the Princes Risborough-Aylesbury railway over HS2 near Stoke Mandeville.
It's visible under construction lying alongside the railway at 9.09-25 in the video.
There's a Chiltern train pictured alongside it for a handy reference.

I believe that is the final position of the bridge, it certainly seems to be fixed on supports which suggests the Aylesbury - Princes Risborough branch will be slewed / realigned slightly to the west with HS2 diving underneath. The branch line is due to be closed for a few weeks next year for this work to take place.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,229
I believe that is the final position of the bridge, it certainly seems to be fixed on supports which suggests the Aylesbury - Princes Risborough branch will be slewed / realigned slightly to the west with HS2 diving underneath. The branch line is due to be closed for a few weeks next year for this work to take place.
Yes it does get slewed west, I’ve dug out a map that shows the move, I’d estimate it’s about 1500m overall realignment:
 

Attachments

  • 673842E1-3997-44F0-A4FF-F58003F01C2E.jpeg
    673842E1-3997-44F0-A4FF-F58003F01C2E.jpeg
    1.7 MB · Views: 216
Last edited:

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,634
I believe that is the final position of the bridge, it certainly seems to be fixed on supports which suggests the Aylesbury - Princes Risborough branch will be slewed / realigned slightly to the west with HS2 diving underneath. The branch line is due to be closed for a few weeks next year for this work to take place.
11 weeks from April.
 

12LDA28C

Established Member
Joined
14 Oct 2022
Messages
5,058
11 weeks from April.

Excellent. Let's hope the trackwork can get sorted out for the full length of the branch as it's in a deplorable state at the moment, not helped no doubt by heavy ballast trains working over it most nights.

I'm sure the staff at Banbury depot will be looking forward to the increased workload during those 11 weeks!
 

Fazaar1889

Member
Joined
5 Oct 2022
Messages
629
Location
South East

New photos of the big bridge building machine.

You two might enjoy these photos (I'm not sure how to tag)
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,898
Location
Mold, Clwyd
The East Tsing Yi viaduct / interchange, on Route 8 directly above the Kwai Tsing container terminal.
I believe it's the structure on the right on this hazy picture taken from a Star ferry.
It certainly dominates the view across the harbour.

IMG_0056.JPG

This link shows a picture of the girder at work on the interchange section of the project:
 

D6130

Established Member
Joined
12 Jan 2021
Messages
8,931
Location
West Yorkshire/Tuscany
Apologies if this has been stated previously, but how is the Quainton Railway Centre being affected by the works and has it had to be relocated? It's not very clear from the otherwise excellent fly-through video.
 

12LDA28C

Established Member
Joined
14 Oct 2022
Messages
5,058
Apologies if this has been stated previously, but how is the Quainton Railway Centre being affected by the works and has it had to be relocated? It's not very clear from the otherwise excellent fly-through video.

It's still where it always was, the main line has been severed and lifted beyond the bridge immediately north of the station and heritage site. Station road itself has been closed but only beyond the Bucks Railway Centre entrance so I believe it's effectively still 'business as usual', indeed their website is currently advertising 'Panto Express' trains on the lead up to Christmas. Oh yes they are!
 

D6130

Established Member
Joined
12 Jan 2021
Messages
8,931
Location
West Yorkshire/Tuscany
It's still where it always was, the main line has been severed and lifted beyond the bridge immediately north of the station and heritage site. Station road itself has been closed but only beyond the Bucks Railway Centre entrance so I believe it's effectively still 'business as usual', indeed their website is currently advertising 'Panto Express' trains on the lead up to Christmas. Oh yes they are!
Many thanks!
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,229
Apologies if this has been stated previously, but how is the Quainton Railway Centre being affected by the works and has it had to be relocated? It's not very clear from the otherwise excellent fly-through video.
If you follow this link to an HS2 map of the area, the work is all to do with local permanent road closures, and resulting diversions over a relocated bridge. There’s no apparent impact on the railway centre itself, but road access will be from only the east side of the line.

 

D6130

Established Member
Joined
12 Jan 2021
Messages
8,931
Location
West Yorkshire/Tuscany
If you follow this link to an HS2 map of the area, the work is all to do with local permanent road closures, and resulting diversions over a relocated bridge. There’s no apparent impact on the railway centre itself, but road access will be from only the east side of the line.
Thanks for that. I haven't visited the preservation site since moving from Aylesbury to Skipton in 1991, but I seem to remember that a significant proportion of the Society's track and rolling stock were located on the West side of the line opposite the station building. Will that area still be accessible from within the complex, or have they had to move everything to the Up side?
 

Mikey C

Established Member
Joined
11 Feb 2013
Messages
8,232
Thanks for that. I haven't visited the preservation site since moving from Aylesbury to Skipton in 1991, but I seem to remember that a significant proportion of the Society's track and rolling stock were located on the West side of the line opposite the station building. Will that area still be accessible from within the complex, or have they had to move everything to the Up side?

HS2 itself doesn't directly affect their site, though I don't know the construction site has any impact on their operations
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,229
Thanks for that. I haven't visited the preservation site since moving from Aylesbury to Skipton in 1991, but I seem to remember that a significant proportion of the Society's track and rolling stock were located on the West side of the line opposite the station building. Will that area still be accessible from within the complex, or have they had to move everything to the Up side?
I think everything is unchanged, there are still the two footbridges giving access across the site over the stub of the Network Rail line, (which is currently lifted north of the station). There was no rail connection between west and east sides of the line, indeed no connection with NR at all.
 

DaveHarries

Established Member
Joined
12 Dec 2011
Messages
2,568
Location
England
If you follow this link to an HS2 map of the area, the work is all to do with local permanent road closures, and resulting diversions over a relocated bridge. There’s no apparent impact on the railway centre itself, but road access will be from only the east side of the line.

I note that the background mapping refers to the BRC's line as a "dismantled railway" when Google Earth shows that there is track in situ! Also I apologise if this is a silly question but will the new Station ROad incorporate the heritage bridge from the old route or will the bridge over the BRC's line be a newbuild?

It's still where it always was, the main line has been severed and lifted beyond the bridge immediately north of the station and heritage site. Station road itself has been closed but only beyond the Bucks Railway Centre entrance so I believe it's effectively still 'business as usual', indeed their website is currently advertising 'Panto Express' trains on the lead up to Christmas. Oh yes they are!
Hopefully the track will be put back in when the diversion of Station Road is completed: as far as I can see from that map in the link the HS2 line isn't running on the formation of the BRC route and that there will have to be one long bridge over both lines.

Dave
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,229
I note that the background mapping refers to the BRC's line as a "dismantled railway" when Google Earth shows that there is track in situ! Also I apologise if this is a silly question but will the new Station ROad incorporate the heritage bridge from the old route or will the bridge over the BRC's line be a newbuild?
I think the only uses of “dismantled railway”, to the left of the BRC correctly refer to the former curve leading away to Verney Junction, and the former Ashendon Junction to Grendon Junction link, which is now replaced by a road anyway

The existing NR track is on the map, it’s just shown as a single grey line. The existing station road bridge will still be needed, and the drawing clearly shows two separate new bridges, one new Station Road Overbridge above HS2, and another just a little further to the northeast named as the Aylesbury Link Overbridge
 

TheHSRailFan

Member
Joined
16 Jun 2018
Messages
297
Apologies if this has been stated previously, but how is the Quainton Railway Centre being affected by the works and has it had to be relocated? It's not very clear from the otherwise excellent fly-through video.
HS2 (like everyone else has said) basically skims it. You will only have to worry when East West Rail (Update thread linked) revitalises their Aylesbury spur for the project which is currently shelved.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
112,941
Location
"Marston Vale mafia"
HS2 (like everyone else has said) basically skims it. You will only have to worry when East West Rail (Update thread linked) revitalises their Aylesbury spur for the project which is currently shelved.

In essence the through Network Rail line lops Quainton Road in half. I don't think EWR Aylesbury would really change that, though there might be changes at Aylesbury Vale Parkway. Doubling it wouldn't change that either, there's a spare bit of trackbed. As I understand it there's no access between the two halves of the preserved operation nor to the mainline - Quainton Road shuttles operated by Chiltern (when those have operated) ran on the mainline which still has a platform at Quainton.

This is all clearly visible on Google Maps aerial view.
 

12LDA28C

Established Member
Joined
14 Oct 2022
Messages
5,058
HS2 (like everyone else has said) basically skims it. You will only have to worry when East West Rail (Update thread linked) revitalises their Aylesbury spur for the project which is currently shelved.

'Currently shelved'... although the track is being relaid to 90mph line speed so maybe futureproofing for when it's eventually approved?
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,634
'Currently shelved'... although the track is being relaid to 90mph line speed so maybe futureproofing for when it's eventually approved?
You can't run the service without it being 90 so its a requirement rather than future proofing.
 

12LDA28C

Established Member
Joined
14 Oct 2022
Messages
5,058
I think the point was that if there was no intention of ever running it the line would either not be reconnected or just done as a low speed freight only line.

Indeed. The line has to be reconnected to serve Calvert waste disposal site. This however would clearly not have to be a 90mph line.

== Doublepost prevention - post automatically merged: ==

You can't run the service without it being 90 so its a requirement rather than future proofing.

As the only 'service' that would use the line north of Quainton (if the Aylesbury spur was not built for passenger services) would be the 'binliner' trains to Calvert, there would be no requirement for 90mph running and it could remain a 30mph freight line as it has been for decades.
 

JamesT

Established Member
Joined
25 Feb 2015
Messages
4,828
Indeed. The line has to be reconnected to serve Calvert waste disposal site. This however would clearly not have to be a 90mph line.

== Doublepost prevention - post automatically merged: ==



As the only 'service' that would use the line north of Quainton (if the Aylesbury spur was not built for passenger services) would be the 'binliner' trains to Calvert, there would be no requirement for 90mph running and it could remain a 30mph freight line as it has been for decades.
How much more expensive is rebuilding it as a passenger-grade line over a freight-only?
 