• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

HS1 between Folkestone & Ashford

Status
Not open for further replies.

Cletus

Established Member
Joined
11 Dec 2010
Messages
2,397
Location
Dover
Why does the HS1 between the Channel Tunnel and Ashford use the original track?

Surely it would make sense for the trains to use the higher speed line and then that would improve journey times?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

TGV

Member
Joined
25 Nov 2005
Messages
734
Location
320km/h Voie Libre
HS1 does go from Ashford to Eurotunnel. Eurostars use that 300km/h TVM equipped section. There is an old 3rd rail line running along side it for most of that distance up to Dollands Moor - maybe you're getting confused with that?

The Southeastern High Speed services don't use that section of HS1 because they diverge at Ashford and head towards Folkstone and Dover which uses the old track - not the new high speed line.
 

Cletus

Established Member
Joined
11 Dec 2010
Messages
2,397
Location
Dover
HS1 does go from Ashford to Eurotunnel. Eurostars use that 300km/h TVM equipped section. There is an old 3rd rail line running along side it for most of that distance up to Dollands Moor - maybe you're getting confused with that?

The Southeastern High Speed services don't use that section of HS1 because they diverge at Ashford and head towards Folkstone and Dover which uses the old track - not the new high speed line.

The HS1 trundles along the same track as the Charing Cross trains through Westenhanger / Sandling, so my question was, why doesn't it use the high speed track between Dollands Moor & Ashford as it does between Ashford & St Pancras? Or there differences I don't know about?
 

TGV

Member
Joined
25 Nov 2005
Messages
734
Location
320km/h Voie Libre
The Southeastern Highspeed trains don't use that section of CTRL because they need to serve the two stations in Folkestone on the way to/from Dover. And they are not on the high speed track - they need to leave HS1 at Ashford and trundle through Westenhanger because there is no other way for them.
 

notadriver

Established Member
Joined
1 Oct 2010
Messages
3,736
You would need a new junction near Saltwood. Quite a lot of money for a very small saving in journey time.
 
Status
Not open for further replies.

Top