• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

HS Atlantic (Funding Pending)

Status
Not open for further replies.

Frank Scully

Member
Joined
6 Feb 2014
Messages
10
Location
Colchester
This is my entirely unrealistic and never-to-be funded-in-my-lifetime plan for a new build high speed route which would connect the far south west and south coast with Gatwick/London Victoria and the international station at Ashford, allowing for interchange with HS1. It opens up a new continuous route across southern England and gives a direct connection from the SW to Gatwick and Ashford while avoiding travel and interchange at Paddington. Stopping pattern could be New west Cornwall HS station>>>New mid Cornwall HS station>>new east Cornwall station>>Plymouth>>>>Exeter>>Somewhere in Dorset maybe>>Bournemouth>>new South Hants station serving the conurb>>Brighton>>Gatwick Airport>>London Victoria (or ...Brighton>>Ashford International). Blue line is the alt route which allows for a more central station serving south Hants.
 

Attachments

  • HS Atlantic.PNG
    HS Atlantic.PNG
    547.6 KB · Views: 132
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,253
It’s definitely not original. Posters have come up with such a route quite a few times before.

I’m sure you must have read the map caption for the South Downs National Park before drawing a line through it? Similarly the New Forest, 3 or 4 AONBs?
 

Frank Scully

Member
Joined
6 Feb 2014
Messages
10
Location
Colchester
Moot points really as this country is in the grip of a chronic nimby epidemic and we'll soon be building nothing anywhere so your land designations are quite safe.
 

Iskra

Established Member
Joined
11 Jun 2014
Messages
10,680
Location
West Riding
...Was anyone else expecting this to be a thread about a High Speed Line under the Atlantic? :D
 

PGAT

Established Member
Joined
13 Apr 2022
Messages
2,125
Location
Selhurst
How would you have High Speed Rail (especially in 3rd rail land!) from Gatwick to Victoria?
 

mike57

Established Member
Joined
13 Mar 2015
Messages
2,375
Location
East coast of Yorkshire
Taking this proposal semi seriuosly, there just will never be the passenger flow to justify an HS4 or what ever. From west of Exeter you would catch a train to London, then catch HS1 from there, from Brighton north you already have Thameslink which goes through St Pancras. Which leaves Bournemouth - Southampton - Portsmouth (forget west of Bounemouth to Exeter there just aren't the centres of population). The Hampshire coast could benefit from better links east - west along the coast, journeys are slow, but even improvements to existing infrastructure seem unlikely.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,463
Location
Northampton
I'm surprised by the choice to bypass every single major urban area except Plymouth, which gets completely buldozed to fit the HS line in.
 

Shaw S Hunter

Established Member
Joined
21 Apr 2016
Messages
3,486
Location
Over The Hill
The one merit to the principle behind the idea is the provision of additional track capacity between Brighton and Southampton. Services all along that corridor are painfully slow thanks to the relatively high density of population served by just a double-tracked line. There is surely a lot of medium distance traffic being lost to road travel thanks to having to fit in a decent frequency of stopping services and thereby preventing the operation of genuinely fast trains.
 

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,165
The thread title confuses me. What does "funding pending" mean?
 

mike57

Established Member
Joined
13 Mar 2015
Messages
2,375
Location
East coast of Yorkshire
is the provision of additional track capacity between Brighton and Southampton.
The existing route is pretty hemmed in by development so I dont think 4 tracking would be an option, so any new route is going to have go north of the existing strip of urban sprawl. That raises several problems, geography, and the fact that the South Downs National Park pretty well starts where the urban area finishes, certainly at the eastern end.

Its a while since I was down there, but from memory most of it is ~70mph, would there be any benefit in upping this to say 90mph where the alignment allows, its fairly straight for the most part.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,463
Location
Northampton
The one merit to the principle behind the idea is the provision of additional track capacity between Brighton and Southampton. Services all along that corridor are painfully slow thanks to the relatively high density of population served by just a double-tracked line. There is surely a lot of medium distance traffic being lost to road travel thanks to having to fit in a decent frequency of stopping services and thereby preventing the operation of genuinely fast trains.
No it doesn't because it doesn't go anywhere near Brighton and there's no sensible way to get trains out of Brighton and onto the new line. The new line also runs effectively slap bang over the top of the South Downs.
Its a while since I was down there, but from memory most of it is ~70mph, would there be any benefit in upping this to say 90mph where the alignment allows, its fairly straight for the most part.
the amount of Ldvel crossings may well constrain the linespeed, but even if it was possible the amount of stations down there means it would be difficult to take advantage of any uplifts.
 

MattRat

On Moderation
Joined
26 May 2021
Messages
2,126
Location
Liverpool
Does OP live in Plymouth and just wants their own Eurostar to Paris? Because that's what this looks like. Even then, there are better ways to do this that can be useful to London too.
 

Shaw S Hunter

Established Member
Joined
21 Apr 2016
Messages
3,486
Location
Over The Hill
No it doesn't because it doesn't go anywhere near Brighton and there's no sensible way to get trains out of Brighton and onto the new line. The new line also runs effectively slap bang over the top of the South Downs.

There's a reason I used the word principle, namely that additional track capacity would be very useful but the OP's proposal wouldn't provide it in itself. I'm also well aware of the significant geographic obstacles to just about any expansive rail scheme along the Coastway. The only realistic option would be for some dynamic loops here and there but the locations where it might be possible to add a stretch of 3 or 4 tracking might not actually help to provide a useful timetable.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,463
Location
Northampton
There's a reason I used the word principle, namely that additional track capacity would be very useful but the OP's proposal wouldn't provide it in itself. I'm also well aware of the significant geographic obstacles to just about any expansive rail scheme along the Coastway. The only realistic option would be for some dynamic loops here and there but the locations where it might be possible to add a stretch of 3 or 4 tracking might not actually help to provide a useful timetable.
Indeed they don't. The areas it's needed most is Portslade-Shoreham/Lancing area, which is heavily built up and has lots of level crossings. There's no realistic open land until you're beyond Barnham. The only thing that might make a substantive improvement is the grade-separation of Arundel Jns/Ford Triangle, but that doesn't help with slow trains delaying fast trains.
 
Status
Not open for further replies.

Top