How would you electrify Dawlish?

Status
Not open for further replies.

Hartington

Member
Joined
5 Jul 2013
Messages
165
The recent stranding of a Voyager at Dawlish, having been hit by a wave, had me wondering. If (and yes, I accept it's a big if) how do you electrify along the sea wall? Water and electricity don't seem to be happy bedfellows.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

cf111

Established Member
Joined
13 Nov 2012
Messages
1,393
The line at Saltcoats gets battered some winters:

a-train-makes-it-s-way-along-the-shore-near-saltcoat-north-ayrshire-scotlan-pic-pa-433016561.jpg


No idea if they could do Dawlish in the same fashion, but my understanding of the issues with Voyagers was that it is to do with the onboard computers packing in when the resistor banks on the roof are hit by the salt water.
 
Last edited:

Philip Phlopp

Established Member
Joined
31 May 2015
Messages
3,003
The recent stranding of a Voyager at Dawlish, having been hit by a wave, had me wondering. If (and yes, I accept it's a big if) how do you electrify along the sea wall? Water and electricity don't seem to be happy bedfellows.

It's very straightforward.

I'd look to install lattice portals rather than solid masts, tighten the spacing between them to maybe 35 or 40 metres, and add metal grids at the top of the masts to protect against debris, if that's an issue.

It might be necessary to increase the tension to deal with wire deflection caused by waves/spray, so I'd suggest the Series 1 equipment rather than Series 2, if that's a consideration.

You would want to be able to isolate the sea wall electrically during extremely violent weather, and probably have provision for wire renewals in the most at risk areas of the wall, so providing tensioning and crossovers in sensible positions. I'd have thought you would want to continue to provide traction electricity to Teignmouth and Dawlish Warren during an electrical isolation of the sea wall section, so that would be provisioned accordingly.

Beyond that, maybe the use of some additional stainless steel components if there's anything that's particularly at risk from prolonged exposure to spray.
 

mcmad

Member
Joined
11 Mar 2015
Messages
1,073
The problems tend not to be the construction of the OLE itself but the tripping when the waves bridge earth to OLE. Solid conductor rail won't make any difference.
 

Domh245

Established Member
Joined
6 Apr 2013
Messages
8,426
Location
nowhere
Could there not be a system similar to the system used on some French Tramways with the Ground level power supply, where the power is only switched on to a small section when the train is practically underneath it before then switching off again when the train is clear of that section.

Without paying the slightest attention to cost, if you have an insulated 25kV feeder cable buried beneath the ballast and then feeding short sections (half a tension length?) of overhead line separated by ceramic sections but without the full neutral section kit (with no phase difference as it is fed from the same source). There may need to be a longer stretch of insulator to prevent arcing damage, although said section could also double up as the activation switch for the section ahead. Thoughts?
 

Philip Phlopp

Established Member
Joined
31 May 2015
Messages
3,003
Could there not be a system similar to the system used on some French Tramways with the Ground level power supply, where the power is only switched on to a small section when the train is practically underneath it before then switching off again when the train is clear of that section.

Without paying the slightest attention to cost, if you have an insulated 25kV feeder cable buried beneath the ballast and then feeding short sections (half a tension length?) of overhead line separated by ceramic sections but without the full neutral section kit (with no phase difference as it is fed from the same source). There may need to be a longer stretch of insulator to prevent arcing damage, although said section could also double up as the activation switch for the section ahead. Thoughts?

Saltcoats manages to remain operational in some terrible weather, so I'd be hesitant to start worrying about special feeding and isolation arrangements for the route until it's determined whether or not the overhead wires will trip out whilst the route otherwise remains available to traffic, or whether the overhead electrification performs correctly after the sea/weather/spray conditions are so severe the route is closed to all traffic.

There's a lot of work being done on remote isolation equipment with the installation of the SCADA remote control equipment work being undertaken, so there are options out there for isolating the route, but nothing which self isolates the route as a train passes (yet).
 

Carntyne

Member
Joined
8 Jul 2015
Messages
1,024
The wires at Saltcoats usually don't come down, just a risk of a train being stuck there if there's a particularly big wave that trips everything.

Craigendoran on the North Clyde to Helensburgh also suffers the same during high tides though doesn't make for as dramatic pictures!
 

TheKnightWho

Established Member
Joined
17 Oct 2012
Messages
3,183
Location
Oxford
Am I correct in thinking Saltcoats is relatively standard, just with a stronger coating on the masts and insulation rated up to 50kV under normal conditions?
 

QueensCurve

Established Member
Joined
22 Dec 2014
Messages
2,196
Saltcoats manages to remain operational in some terrible weather, so I'd be hesitant to start worrying about special feeding and isolation arrangements for the route until it's determined whether or not the overhead wires will trip out whilst the route otherwise remains available to traffic, or whether the overhead electrification performs correctly after the sea/weather/spray conditions are so severe the route is closed to all traffic.

There's a lot of work being done on remote isolation equipment with the installation of the SCADA remote control equipment work being undertaken, so there are options out there for isolating the route, but nothing which self isolates the route as a train passes (yet).

Maybe it is not a major problem. Here is a video clip of huge waves hitting the OHLE at Saltcoates with no obvious sign of arcing:-

https://www.youtube.com/watch?v=rgSrwFlJKF4

I am pretty sure I have seen a picture of arcing at Saltcoats in a severe storm around 2009 or 2010. I think it was published by the Guardian but I can't find it online.

On a slight digression, I have seen runoff water from the roof at Crewe in heavy rain discharging directly onto the catenary with no flashover. This of course is not salt water.
 

colchesterken

Member
Joined
12 Oct 2010
Messages
768
They could upgrade a couple of preserved Westerns to pull the trains through the switched off sections
That would get me and the other spotters going west
They could do it on summer Saturdays " just for fun " would love to see a Western at full power along the sea wall again
 

L&Y Robert

Member
Joined
22 Apr 2012
Messages
585
Location
Banbury 3m South
Isn't the sea-wall and cliffs at Dawlish, and the very railway itself, of special landscape value? Masts and portal structures (lattice ones, I read, with special debris screens), at closer spacings too, and contact wires and catenary (2 of each, of course) would mess up the landscape somewhat, don't you think?
 

najaB

Veteran Member
Joined
28 Aug 2011
Messages
33,608
Location
Scotland
Isn't the sea-wall and cliffs at Dawlish, and the very railway itself, of special landscape value? Masts and portal structures (lattice ones, I read, with special debris screens), at closer spacings too, and contact wires and catenary (2 of each, of course) would mess up the landscape somewhat, don't you think?
Think of how the rusting pile of electric trains that have gotten stranded will ruin the landscape even more!
 

Philip Phlopp

Established Member
Joined
31 May 2015
Messages
3,003
Isn't the sea-wall and cliffs at Dawlish, and the very railway itself, of special landscape value? Masts and portal structures (lattice ones, I read, with special debris screens), at closer spacings too, and contact wires and catenary (2 of each, of course) would mess up the landscape somewhat, don't you think?

No different to Sydney Gardens in Bath, the Royal Border bridge at Berwick upon Tweed, Edinburgh Waverley station or countless other projects. Edinburgh Waverley and Sydney Gardens are in UNESCO World Heritage sites, and the Forth Bridge, which is in line for electrification, is similarly a UNESCO World Heritage site.

The absolute most you can hope for is some architecturally sympathetic masts onto which the prevalent OLE system of the day will be mounted upon, though for most of the route, I would probably suggest twin track cantilevers mounted on the cliff side of the route would be both sensible engineering solutions and will have the least impact on the landscape.

I do seem to find myself repeatedly reminding people that a far more historically important and significant railway, the Liverpool and Manchester Railway, has successfully been electrified, with stations including Rainhill being sympathetically treated.

Those hoping to play the landscape or architecture card to stop electrification really need not bother - focus your energies on ensuring the work is done as sympathetically as possible, suggest practical and affordable options when the Network Rail and contractor teams conduct public meetings, explain to them patiently where you wouldn't want a mast or portal and suggest alternatives.

It's worth bearing in mind that the designers, consultants and engineers who draw up the plans won't know your town or village intimately so if they're missing something, kindly point it out to them instead of assuming they already know and don't care.
 

colchesterken

Member
Joined
12 Oct 2010
Messages
768
I was impressed with how they did the wiring in Paddington trainshed
it is hardly noticeable,very neat
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,295
Conductor rails might require more support positions (~15m max span) but it has to be remembered that the line is adjacent to a cliff face for significant distnaces and thus additional supports are probably available - indeed if nothing else masts would not stand out against a background as the cliff is only a few feet away.
(Paint them the same colour as the stone? - a sort of off-beige?)

Conductor rail also has a far simpler look to it - and is considerably more rugged.

Although it would probably be cheaper just to do a Saltcoats.
 

34D

Established Member
Joined
9 Feb 2011
Messages
6,043
Location
Yorkshire
Won't all the (theoretical) elecric trains through Dawlish be bi mode?

If so, surely having a short section without catenary (for both reasons) is entirely feasible?
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,295
Won't all the (theoretical) elecric trains through Dawlish be bi mode?

If so, surely having a short section without catenary (for both reasons) is entirely feasible?

Once you are electrifying Dawlish there is little reason not to continue to Penzance.
At which point you have electrified the entire main line in Cornwall and can dispense with the bi-modes.
 

Philip Phlopp

Established Member
Joined
31 May 2015
Messages
3,003
Conductor rails might require more support positions (~15m max span) but it has to be remembered that the line is adjacent to a cliff face for significant distnaces and thus additional supports are probably available - indeed if nothing else masts would not stand out against a background as the cliff is only a few feet away.
(Paint them the same colour as the stone? - a sort of off-beige?)

Conductor rail also has a far simpler look to it - and is considerably more rugged.

Although it would probably be cheaper just to do a Saltcoats.

I don't like the idea of painting masts, but I'd make an exception for a stretch at Dawlish, and it would work as excellent weather protection, provided it's done using a high quality polymer coating, of the sort favoured in the North Sea (and used on the Forth Bridge). The route will be quiet enough to allow for a few possessions to allow for re-painting every 15 years too.

DC isn't feasible for Dawlish for a mixture of safety and reliability concerns, the line suffers from weather and wave conditions that are of little concern for 25kV AC OLE, but which would short circuit 750V DC - the route had to discontinue track circuit signalling because it was difficult to deal with shorting between the tracks.
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,295
DC isn't feasible for Dawlish for a mixture of safety and reliability concerns, the line suffers from weather and wave conditions that are of little concern for 25kV AC OLE, but which would short circuit 750V DC - the route had to discontinue track circuit signalling because it was difficult to deal with shorting between the tracks.

I mean 25kV overhead conductor rail.
Even I would balk at third rail on that section.
 

HowardGWR

Established Member
Joined
30 Jan 2013
Messages
4,981
Once you are electrifying Dawlish there is little reason not to continue to Penzance.
At which point you have electrified the entire main line in Cornwall and can dispense with the bi-modes.
You appear to have forgotten Exeter to Bristol and Taunton to Newbury. The latter has not much higher a frequency of use than a branch line, so I would think the former would have priority and tie in with a Bristol to Brum wiring.
 