• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

How would BR have handled the Intercity Express Programme

Status
Not open for further replies.

Energy

Established Member
Joined
29 Dec 2018
Messages
5,135
we wouldn't have had the multiplicity of different train types with incompatible coupling/electrical connections
Its not like the 165/166s and sprinters were deliberately made incompatible so Regional Railways couldn't take them.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,225
Location
"Marston Vale mafia"
I know this thread is specifically about IET but, if BR has continued in its present form, we wouldn't have had the multiplicity of different train types with incompatible coupling/electrical connections, and presumably we would still have a single rate of pay and uniform terms and conditions for train crew, albeit with various mileage allowances. EU membership would have required separate accounts for "track and trains", not necessarily the separate organisations we ended up with.

I don't think BR would necessarily have InterCity trains coupling to Sprinters. They didn't when they were BR.

80x are very BR like anyway. A standard InterCity train used by a significant number of operators which differ only in relatively small things like the colour of the seat covers.

== Doublepost prevention - post automatically merged: ==

Its not like the 165/166s and sprinters were deliberately made incompatible so Regional Railways couldn't take them.

This was a bit silly as it's literally just minor pinout changes, you can easily change them back, this has been done to convert 170s to 168s.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,522
Location
Northampton
I know this thread is specifically about IET but, if BR has continued in its present form, we wouldn't have had the multiplicity of different train types with incompatible coupling/electrical connections, and presumably we would still have a single rate of pay and uniform terms and conditions for train crew, albeit with various mileage allowances.
BR had nearly 50 years to get to these things, yet chose not to. There is no reason to suppose that in the 30 years it hypothetically would have had it would have shown any greater compulsion to standardise.

I think we'd have seen the different sectors develop along distinct lines, with cross-sector compatability not a high priority.
EU membership would have required separate accounts for "track and trains", not necessarily the separate organisations we ended up with.
Indeed. Although BR wasn't far off that anyway with the sectors, You'd have had a 'BRIL' alongside the 'BREL' and then Intercity, Regional Railways etc in a similar manner to today's franchises.

The key question is whether BR would have gone for bi-mode MUs or a more IC225 approach with bi-mode locos on push-pull mode.
 

Sad Sprinter

Established Member
Joined
5 Jun 2017
Messages
3,186
Location
Way on down South London town
BR had nearly 50 years to get to these things, yet chose not to. There is no reason to suppose that in the 30 years it hypothetically would have had it would have shown any greater compulsion to standardise.

I think we'd have seen the different sectors develop along distinct lines, with cross-sector compatability not a high priority.

Indeed. Although BR wasn't far off that anyway with the sectors, You'd have had a 'BRIL' alongside the 'BREL' and then Intercity, Regional Railways etc in a similar manner to today's franchises.

The key question is whether BR would have gone for bi-mode MUs or a more IC225 approach with bi-mode locos on push-pull mode.

I devised for XC, ex-WCML MK3s with a class 68 on one end and a class 91 on the other

Either that, or a class 68+MK3+DVT rake
 

Mikey C

Established Member
Joined
11 Feb 2013
Messages
8,247
BR would've pushed ahead with the interCity250, and potentially cascaded the displaced stock to an electrified GWML and MML, so no Intercity express programme necessary.
The displaced trains from the WCML would still need replacing by now, just as the displaced Mk3 carriages that went to various operators and the Class 90s to Anglia have/are being replaced now.

It's worth remembering that many of the high speed diesels bought post privatisation were for growth, and not for replacement of older stock, and the timescales would have required diesels for operations out of Paddington and St Pancras.
 
Status
Not open for further replies.

Top