Peter Mugridge
Veteran Member
30 or so years ago I reported a gradually deteriorating ride in the up direction over a particular bridge ( Bridge 6 - in the older numbering system - over Meadow Walk between Ewell West and Stoneleigh ), over which I commuted daily at the time. It was a slight but noticeable decline, specifically a particular bump and a wobble.
I received a letter back saying that they had sent a manger out to look at it and found that it required immediate remedial action. This was obviously done because a few days later the ride was normal.
About five years or so later, the entire bridge was rebuilt.
The lesson is clear - always report anything you are worried about. While many reports will be found to be within tolerances, as others above have mentioned, there is always the possibility that something important is not known about which could have serious consequences if ignored.
I received a letter back saying that they had sent a manger out to look at it and found that it required immediate remedial action. This was obviously done because a few days later the ride was normal.
About five years or so later, the entire bridge was rebuilt.
The lesson is clear - always report anything you are worried about. While many reports will be found to be within tolerances, as others above have mentioned, there is always the possibility that something important is not known about which could have serious consequences if ignored.