TheSlash
Established Member
I think the London to Brighton bike ride is this weekend and it set me thinking about the wonderfull idea by the 3 main Southern TOC's, to do away with brake vans
If i ran a railtour company, i'd round up a few spare brake vans that are lying around {Meldon quarry etc}. I'd grab a few spare TSO's and put them into a rake, maybe 3 brakes and 5 TSO's. Then i'd top and tail it with some locos, perhaps 73/2's?
To complete my plan, i'd run a pick up only service from Brighton to London calling at Preston Park, Haywards Heath, Three Bridges, East Croydon, Clapham junction and Victoria.
I'd try and make up 2 sets minimum and then run 2 services. From Victoria i'd run the stock into a stabling point near Brighton, ideally Lovers Walk, but possibly Three Bridges. At the time the majority of riders are likely to be finishing at Brighton, i'd then run a few services from Brighton to London, set down only.
Such a shame that ideas can't be copyrighted
If i ran a railtour company, i'd round up a few spare brake vans that are lying around {Meldon quarry etc}. I'd grab a few spare TSO's and put them into a rake, maybe 3 brakes and 5 TSO's. Then i'd top and tail it with some locos, perhaps 73/2's?
To complete my plan, i'd run a pick up only service from Brighton to London calling at Preston Park, Haywards Heath, Three Bridges, East Croydon, Clapham junction and Victoria.
I'd try and make up 2 sets minimum and then run 2 services. From Victoria i'd run the stock into a stabling point near Brighton, ideally Lovers Walk, but possibly Three Bridges. At the time the majority of riders are likely to be finishing at Brighton, i'd then run a few services from Brighton to London, set down only.
Such a shame that ideas can't be copyrighted