How major works are announced

Status
Not open for further replies.

NealG

Member
Joined
6 May 2019
Messages
12
In March Liverpool street will be closed for several dates including 28th March - fair enough if works are needed. My issue is how its announced.

If you go to https://www.greateranglia.co.uk/travel-information/service-alterations?date=2026-03-01--2026-03-31 and click on Saturday 28th March.
You will find 3 sets of works with the titles:

  1. Tottenham Hale to Liverpool Street
  2. Shenfield/Southend Victoria/Southminster to Liverpool Street
  3. Ely/Bury St Edmunds to Cambridge
If you are coming from say Norwich it would be very easy to not realise that Liverpool Street is closed. Its mentioned near the end of the second entry
Surely it would be much clearer to have one entry titled Liverpool Street Closure with the relevant detail in there.

This is not a one-off - I had similar issues in January and nearly missed a 1hour bus!

1) Do others have the same issue with other TOCs?
2) is there a source of this data that is much easier to read?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

jfollows

Established Member
Joined
26 Feb 2011
Messages
10,075
Location
Wilmslow

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,012
Location
West Wiltshire
GWR tends to only add to their engineering works page once a month, few days ago was showing, remainder of Jan, Feb and March. They have now added April. So depending on what part of month those intending to travel, only get between 8 and 13 weeks notice. Not clear why the don't keep it nearer 12-13 weeks notice, because they update and remove the most recent week on a weekly basis.


However they show it by Station or area affected, not splitting it routes as per post #1.

But the areas can be misleading, for instance the one marked Bath weekend 25-26 April is more affecting Wiltshire than Bath and includes words 'As a result, train services operating between London and South Wales will also be reduced.' Not very obvious if you are in south Wales and wouldn't normally travel via Bath, so never going to read whole text of Bath area works.
 

leonie13

Member
Joined
25 Aug 2022
Messages
43
Location
Home Counties
Particularly on their website, I've always found Greater Anglia to have a frustrating way of describing their planned closures.

For example, this weekend the line is closed between Shenfield and Colchester. https://www.greateranglia.co.uk/tra...tions/colchesterbraintree-billericaysudbury-4

Saturday, 7 February 2026 to Sunday, 8 February 2026
Buses replace trains between Colchester and Billericay, Braintree and Witham as well as between Sudbury and Marks Tey

Trains will continue to operate between Norwich / Clacton-on-Sea and Colchester as well as Billericay and Liverpool Street

There surely has to be a more customer-friendly way of advertising service alterations.
 

SargeNpton

Established Member
Joined
19 Nov 2018
Messages
1,704
Another of the drawbacks of each TOC doing its own thing instead of there being common guidelines on how to show engineering works.
 

NealG

Member
Joined
6 May 2019
Messages
12
Reached from https://www.nationalrail.co.uk/status-and-disruptions/, enter date, done.
Excellent - much clearer.

I suspect the Anglia ones are written by somebody who thinks from a technical point of view rather than as a customer!
 

Oxfordblues

Member
Joined
22 Dec 2013
Messages
1,114
Here in Oxford we were told there would be no southbound trains during the current blockade and just a limited number of northbound departures. The notice failed to mention that Chiltern are running a full half-hourly service to Marylebone. Admittedly they're "northbound" departing Oxford, but they become southbound curving from Gavray Junction to Bicester South Junction, but most punters wouldn't know that.
 

800002

Member
Joined
19 Jun 2019
Messages
1,076
Here in Oxford we were told there would be no southbound trains during the current blockade and just a limited number of northbound departures. The notice failed to mention that Chiltern are running a full half-hourly service to Marylebone. Admittedly they're "northbound" departing Oxford, but they become southbound curving from Gavray Junction to Bicester South Junction, but most punters wouldn't know that.
I suspect that GWR were referring to their own scheduled services, and not that of other operators?
 

styles

Established Member
Joined
7 Dec 2014
Messages
4,614
Location
Gwynedd
Reached from https://www.nationalrail.co.uk/status-and-disruptions/, enter date, done.
I suppose the issue is individual TOC websites only covering their own disruption. Perhaps they should redirect to National Rail and ensure all the relevant information is on there instead.
 

Ian Hardy

Member
Joined
18 Nov 2009
Messages
445
I suppose the issue is individual TOC websites only covering their own disruption. Perhaps they should redirect to National Rail and ensure all the relevant information is on there instead.
No, anything but that.

SWR's engineering work information is far superior than ever anything on National Fail's website is.

For all First MTR's woes with operating SWR, at least they were very good at telling you when it was planned that they weren't going to be operating normally and DOR has continued to upload this very good information:

This webpage has 3 months worth of detailed information:
https://www.southwesternrailway.com/plan-my-journey/planned-improvements

Then there is an Engineering work weekly summary which is a PDF file, which is sort of the same as the posters that are put up at stations:
https://www.southwesternrailway.com...-improvements/engineering-work-weekly-summary

When it was SWT, they even put the PDFs of the special timetables that were put up at stations being operated on the website, which was really useful. That stopped but at least there is now RTT, which when armed with the information from the SWR site, you can work things out easily.

Now if all TOCs were the same as SWR, I am sure the rail users would be better informed, but only if they bothered to look for it.
 

styles

Established Member
Joined
7 Dec 2014
Messages
4,614
Location
Gwynedd
No, anything but that.

SWR's engineering work information is far superior than ever anything on National Fail's website is.
For all First MTR's woes with operating SWR, at least they were very good at telling you when it was planned that they weren't going to be operating normally and DOR has continued to upload this very good information:

This webpage has 3 months worth of detailed information:
https://www.southwesternrailway.com/plan-my-journey/planned-improvements

Then there is an Engineering work weekly summary which is a PDF file, which is sort of the same as the posters that are put up at stations:
https://www.southwesternrailway.com...-improvements/engineering-work-weekly-summary

When it was SWT, they even put the PDFs of the special timetables that were put up at stations being operated on the website, which was really useful. That stopped but at least there is now RTT, which when armed with the information from the SWR site, you can work things out easily.

Now if all TOCs were the same as SWR, I am sure the rail users would be better informed, but only if they bothered to look for it.
That's easily solved - force operators to submit the same information to Network Rail, or set a minimum standard. Why doesn't SWR submit this information to Network Rail already?
 

Ian Hardy

Member
Joined
18 Nov 2009
Messages
445
That's easily solved - force operators to submit the same information to Network Rail, or set a minimum standard. Why doesn't SWR submit this information to Network Rail already?
I don't know why SWR doesn't send it or why National rail doesn't use it

This is what is on the NR site for the work near Salisbury today:
https://www.nationalrail.co.uk/engineering-works/andover-salisbury-7-feb-20260207/
Buses replace trains between Andover and Gillingham (Dorset) and between Salisbury and Warminster on Saturday 7 and Sunday 8 February
Starts Saturday 07 February 2026 to Sunday 08 February 2026
Train operators affected
Great Western Railway
South Western Railway
Route(s) affected
Great Western Railway between Portsmouth Harbour and Cardiff Central and also between Salisbury and Bristol Temple Meads
South Western Railway between London Waterloo and Yeovil Junction / Exeter St Davids
Description
Engineering work is taking place between Salisbury and Gillingham (Dorset), closing all lines.
Great Western Railway:
Rail replacement buses will operate between Salisbury and Warminster.
Trains between Portsmouth Harbour and Cardiff Central will now operate between Portsmouth Harbour and Salisbury and also between Warminster and Cardiff Central.
Trains between Salisbury and Bristol Temple Meads will operate between Warminster and Bristol Temple Meads.

South Western Railway:
Rail replacement buses will operate between:
Andover and Gillingham (Dorset)
Salisbury and Gillingham (Dorset)

And this is what is on the SWR website:
https://www.southwesternrailway.com/plan-my-journey/planned-improvements/february-2026-works
Altered train services and buses replace trains in the Salisbury area Saturday 7 and Sunday 8 February
The lines in the Salisbury area will be closed all weekend due to maintenance work.
Great Western Railway services will be affected by this work. Please see their publicity for more details.
London Waterloo to Exeter services will be revised and will terminate at Salisbury.
A revised service will run between Gillingham and Exeter.
Buses will run between Andover and Gillingham (non-stop).
Buses will run between Salisbury, Tisbury and Gillingham.
South Western Railway services to Yeovil via Westbury will terminate at Salisbury due to work in the Warminster area.
 

saismee

Established Member
Joined
20 Oct 2023
Messages
1,672
Location
UK
GA's disruption and engineering information has always been a bit subpar. My main gripe is that the main "routes" are all between London Liverpool Street and X, but they run a lot of regional routes which just don't appear in the app disruption page. It will happily state "Generally good service" meanwhile all trains via Thetford are canned and the swing bridge at Somerleyton has collapsed (not based on real events).
 

MKB

Member
Joined
15 Oct 2008
Messages
666
Reached from https://www.nationalrail.co.uk/status-and-disruptions/, enter date, done.
I too have struggled with the information on that page.

I just want to be able to enter that I plan to travel from, as an example, Nuneaton to London Euston on 12 December 2026, and that it immediately tells me whether any services that day could be affected by planned works. (Currently it only shows the next three months.)

I don't want to have to select each operator individually, and then work out from the prose whether anything listed affects my part of their route network.

The way it's worded often makes it difficult to understand what will be happening exactly where and exactly when. It's also often unspecified until very much nearer the time what alternative arrangements will be in place, making it difficult to commit to booking theatre, flights, etc.

More than once I have had to pay for an Uber home from Heathrow to the Midlands because I learned too late that there would be no train options after arriving when ordinarily there are.
 

jfollows

Established Member
Joined
26 Feb 2011
Messages
10,075
Location
Wilmslow
Yes, but the engineering works planned for December 2026 have not been defined, agreed or scheduled yet.
 

MKB

Member
Joined
15 Oct 2008
Messages
666
Yes, but the engineering works planned for December 2026 have not been defined, agreed or scheduled yet.
I thought the engineering blockades were planned at least a year in advance? I'd have thought that budgeting for them makes that a necessity.

Certainly when sports fans have complained about having no public transport, news articles have quoted rail industry sources as saying it was the event organisers' responsibility for not scheduling their event when there were rail closures planned, and some of these events (e.g. cup finals) are planned up to a year ahead.
 

jfollows

Established Member
Joined
26 Feb 2011
Messages
10,075
Location
Wilmslow
Dream on!
I’ve only just been able to buy advance tickets for May, let alone December.
Sure, there will be long term plans, but they won’t translate into detailed arrangements of the sort you want now.
 

Segedunum

Established Member
Associate Staff
International Transport
Joined
22 Dec 2013
Messages
4,749
Location
Up North
I thought the engineering blockades were planned at least a year in advance? I'd have thought that budgeting for them makes that a necessity.

Certainly when sports fans have complained about having no public transport, news articles have quoted rail industry sources as saying it was the event organisers' responsibility for not scheduling their event when there were rail closures planned, and some of these events (e.g. cup finals) are planned up to a year ahead.
Engineering works can be pencilled in years out, but initial timetables aren't submitted to Network Rail until T-16 weeks.

In the weeks leading up to that T-16 cutoff, plans can and do get altered/binned off entirely. You would struggle to provide anything more than the vaguest information (and that would be caveated with a warning that everything could well change).
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,624
I thought the engineering blockades were planned at least a year in advance? I'd have thought that budgeting for them makes that a necessity.

Certainly when sports fans have complained about having no public transport, news articles have quoted rail industry sources as saying it was the event organisers' responsibility for not scheduling their event when there were rail closures planned, and some of these events (e.g. cup finals) are planned up to a year ahead.
Blockades will be known at that distance, but the actual timetable is still subject to the informed traveller process, so bidding at 16 weeks and offer at 12. Even when NR tell event organisers, they still don't have to take heed of it, thats not the railways problem.
 

Hophead

Established Member
Joined
5 Apr 2013
Messages
1,395
I wouldn't expect detailed information regarding timetables, but I simply don't believe that the railway has no idea what engineering work is scheduled for the late May holiday weekend (as an example). GWR do give an indication regarding major works beyond the 3-month period, but a quick search on other Inter City operators reveals nothing at all for what must be a popular weekend for travel; Avanti even state quite explicitly: "No planned engineering work" - and I suspect that really is not the case.

If I know that a line will be disrupted, I may be able to reschedule to another date, or arrange to go elsewhere. As stated above, we passengers can book events and accommodation, but can only hope that we will be able to get where we are going at or near to the time shown in the timetables.
 
Last edited:

Ian Hardy

Member
Joined
18 Nov 2009
Messages
445
I wouldn't expect detailed information regarding timetables, but I simply don't believe that the railway has no idea what engineering work is scheduled for the late May holiday weekend (as an example). If I know that a line will be disrupted, I may be able to reschedule to another date, or arrange to go elsewhere. As stated above, we passengers can book events and accommodation, but can only hope that we will be able to get where we are going at or near to the time shown in the timetables.
On the Operational Rules page of the Network Rail website: https://www.networkrail.co.uk/industry-and-commercial/information-for-operators/operational-rules/

Network Rail publishes the Engineering Access Statement (EAS) and as part of the EAS, there is a National Map showing the planned works for each week of the year with coloured highlights on the lines that works are planned

The map covering the period 13/12/2025 to 06/04/2026 - issued 14/07/2025:
https://sacuksprodnrdigital0001.blo...ons 5 & 7/V2.1/NAT MAPS EAS ARP 2526 V2.1.pdf

Below is an small extract of the map for 28 February/01 March 2026:

1771885055810.png

The map covering the period 11/04/2026 to 27/09/2026 - issued 15/11/2024:
https://sacuksprodnrdigital0001.blo...tions 5 & 7/V2/NAT MAPS EAS ARP FWLA 2627.pdf

The map covering the period 03/10/2026 to 28/03/2027 seems to have been removed from the NR site

The map covering the period 03/04/2027 to 26/09/2027 - issued 13/02/2026:
https://sacuksprodnrdigital0001.blo...s 5 & 7/V1/NAT MAPS EAS ARP DRAFT 2728 V1.pdf

The map covering the period 02/10/2027 to 26/03/2028 - issued 13/02/2026:
https://sacuksprodnrdigital0001.blo...ns 5 & 7/V1/NAT MAPS EAS ARP FWLA 2728 V1.pdf

These maps will give you an idea where anything is planned to be occur from now until 26/03/2028, however things might change.
 

Vexed

Member
Joined
12 Jan 2020
Messages
637
Location
Herts / Hants
The map covering the period 13/12/2025 to 06/04/2026 - issued 14/07/2025:
https://sacuksprodnrdigital0001.blo...ons 5 & 7/V2.1/NAT MAPS EAS ARP 2526 V2.1.pdf

Below is an small extract of the map for 28 February/01 March 2026:
I think you've screenshotted an older file than you've linked to there. The link does show issued 14/07/2025 but your screenshot does not!

Just a general warning to everyone that these files aren't the most obvious to work with and locate on the Network Rail website.

The map covering the period 03/10/2026 to 28/03/2027 seems to have been removed from the NR site
Here it is
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,624
Just a general warning to everyone that these files aren't the most obvious to work with and locate on the Network Rail website.
Technically they are documents for NR/TOC/FOC use, they are uploaded for transparency.
 

Ian Hardy

Member
Joined
18 Nov 2009
Messages
445
I think you've screenshotted an older file than you've linked to there. The link does show issued 14/07/2025 but your screenshot does not!

Just a general warning to everyone that these files aren't the most obvious to work with and locate on the Network Rail website.


Here it is
Many thanks for finding the missing link, I agree that the Network Rail EAS pages are difficult to use, also thanks the info that I had screen shot an older version than the map that I had linked to.
 