Following an incident on Friday (19 June) involving a collision between two East Midlands Railway (EMR) trains in the Bedford area, in which an EMR driver sadly died and many passengers were injured, the railway is expected to remain closed between Bedford and Luton for the rest of the week.
A complex recovery operation has begun to remove the damaged trains and carriages from the railway before engineers assess any damage and complete necessary repairs. The Overhead Line Equipment – the electrical wires that provide power to the electric trains – must be removed while a temporary access road and concrete foundation is constructed to support the operation of a crane.

Two 110 tonne rail-mounted Kirow Cranes will then lift the trains and carriages from the site before a road-mounted crane moves them onto a low loader – a heavy-duty, specialised trailer designed to carry extremely heavy equipment – to be transported away by road. Following this, engineers will then assess the track and make any repairs before reinstating the overhead lines and completing final safety checks ahead of reopening the railwa

It's not the first time that eyebrows will have been raised at an announcement that it will take at least a week.

Notwithstanding overhead power lines and the nature of modern signalling and telecoms, it does seem a long time. Accidents may be rare today, but is there no place for rail-borne cranes?

Over to you...
 
Last edited by a moderator:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Deepgreen

Established Member
Joined
12 Jun 2013
Messages
7,457
Location
Gomshall, Surrey
I suspect it isn't the actual clearing up that is time-consuming but the collection of evidence from the scene. Railways are far more complex these days than in the past, so there is far more to check for failure, etc.
 

ExRes

Established Member
Joined
16 Dec 2012
Messages
8,282
Location
Back in Sussex
It's not the first time that eyebrows will have been raised at an announcement that it will take at least a week.

Notwithstanding overhead power lines and the nature of modern signalling and telecomms, it does seem a long time. Accidents may be rare today but is there no place for rail-borne cranes?

Over to you...

6X99 arrived Elstow at 1258 with two cranes
 

Archvile

Member
Joined
12 Feb 2023
Messages
126
Location
UK
Same reason most things take longer now.
Internet = greater access to information = people more aware of their rights = more lawyers = more regulations.
Technology also allows us to have the means of investigating more thoroughly than a couple of decades ago.
 

AlterEgo

Verified Rep - Wingin' It! Paul Lucas
Joined
30 Dec 2008
Messages
29,174
Location
LBK
There are rail borne cranes involved at Bedford.
 

KNN

Member
Joined
9 Feb 2024
Messages
288
Location
Birmingham
It depends on the accident, a week ago everyone was saying how surprised they were with the quick reopening after a bridge strike.
 

sloaneesq

Member
Joined
19 Jan 2020
Messages
13
Location
Felixstowe, Suffolk
If there's a death, it's a crime scene. I'm assuming once the emergency services release the site, it's then an RAIB site. Once they've done their bit then comes the recovery and reinstatement. Once that's done, it's the testing. A week feels quick.
 

ExRes

Established Member
Joined
16 Dec 2012
Messages
8,282
Location
Back in Sussex
It's not the first time that eyebrows will have been raised at an announcement that it will take at least a week.

Notwithstanding overhead power lines and the nature of modern signalling and telecomms, it does seem a long time. Accidents may be rare today but is there no place for rail-borne cranes?

Over to you...

You should read the newly added post #380 on the, currently closed, main thread
 

sharpley

Member
Joined
18 Aug 2018
Messages
318
According to the BBC the carriages will be craned onto the side of the track where another crane will lift them on to a low loader. A temporary road and concrete hard standing area have to be built
 

Acathater

Member
Joined
11 Dec 2025
Messages
654
Location
NorthWest
In this case the signalling and warning systems are going to have to be checked cable by cable, every relay, every switch, every bulb, every circuit board. If there's a fault it has to be found. That's a lot of work
 

Cherry_Picker

Established Member
Joined
18 Apr 2011
Messages
2,825
Location
Birmingham
It was often done so much more quickly in the past.

Are you sure about that? Seems a hazy recollection of a single person isn't really the sort of evidence to go on here. Investigating thoroughly is important if it can help prevent future incidents and if that means the line stays closed for a few days then in the big picture it's a price worth paying.
 

AlterEgo

Verified Rep - Wingin' It! Paul Lucas
Joined
30 Dec 2008
Messages
29,174
Location
LBK
That's what I'm asking.

It was often done so much more quickly in the past.
Can you give an example? Ufton Nervet also resulted in a six day closure for example.
 

Andrew1395

Member
Joined
30 Sep 2014
Messages
664
Location
Bushey
Do you have an examples please?
Harrow & Wealdstone in 1952 which I think involved a three train collision, the two slow lines were open at 05:00 the following morning. The DC (Lioness Line) three day after, as the wrecked locomotives had to cleared from the track. The fast lines I think were closed for four days. A temporary footbridge also opened on the fourth day to allow passengers access to the six + bay platforms.

Different world of course 70 years ago. Though being a fully integrated organisation probably did speed up recovery.
 

flitwickbeds

Member
Joined
19 Apr 2017
Messages
767
Harrow & Wealdstone in 1952 which I think involved a three train collision, the two slow lines were open at 05:00 the following morning. The DC (Lioness Line) three day after, as the wrecked locomotives had to cleared from the track. The fast lines I think were closed for four days. A temporary footbridge also opened on the fourth day to allow passengers access to the six + bay platforms.

Different world of course 70 years ago. Though being a fully integrated organisation probably did speed up recovery.
As did the extremely reduced requirements on health and safety, and investigating what happened so lessons can be properly learnt and changes implemented.
 

SteveT

Member
Joined
12 Oct 2017
Messages
71
Can you give an example? Ufton Nervet also resulted in a six day closure for example.
Ufton Nervet is relatively recent.

Hither Green 1967 – accident Sunday evening, slow lines back in action Tuesday morning, fast lines Wednesday.
 

Rail Ranger

Member
Joined
20 Feb 2014
Messages
1,111
In 1952 the railways were an essential part of the country's economic infrastructure. There would have been a continuous procession of coal trains heading towards London past the site of the Bedford collision. Those days are long gone.
 

DarloRich

Veteran Member
Joined
12 Oct 2010
Messages
32,886
Location
Fenny Stratford
It's not the first time that eyebrows will have been raised at an announcement that it will take at least a week.

Notwithstanding overhead power lines and the nature of modern signalling and telecomms, it does seem a long time. Accidents may be rare today but is there no place for rail-borne cranes?

Over to you...
Could you expand on this? What is your expectation for service restart and why?
 

Javelin_55

Member
Joined
9 Apr 2020
Messages
156
Location
South East
Please don't forget that the announcement of the long closure has come 24 hours after the RAIB got on site. It's possible the evidence they've already collected points to multiple complex or conflicting causes.
 

Acathater

Member
Joined
11 Dec 2025
Messages
654
Location
NorthWest
Harrow & Wealdstone in 1952 which I think involved a three train collision, the two slow lines were open at 05:00 the following morning. The DC (Lioness Line) three day after, as the wrecked locomotives had to cleared from the track. The fast lines I think were closed for four days. A temporary footbridge also opened on the fourth day to allow passengers access to the six + bay platforms.

Different world of course 70 years ago. Though being a fully integrated organisation probably did speed up recovery.
mechanical signals, not electronic
simple steam locomotives, not modern electronic controls
no overhead catenary getting in the way
more available labourers to do the work
fewer health & safety considerations
 

apinnard

Member
Joined
2 Aug 2017
Messages
378
Location
Kettering
Yes, I've since seen that but the vehicles are still being taken away by road.
How else are you expecting nine very damaged and in some places likely out of gauge (let alone their height if there even were flatbed wagons to carry them) large metal boxes to be shifted?
 

Horizon22

Established Member
Associate Staff
Jobs & Careers
Joined
8 Sep 2019
Messages
10,941
Location
London
If I recall - from a now retired ex-colleague - after Ladbroke Grove, a reduced service that only went as far as Ealing Broadway was in place for at least a week.
 

deltic

Established Member
Joined
8 Feb 2010
Messages
3,712
There is a clear difference between the time taken to clear fatal road collisions on the motorway network and those on the rail network. National Highways has targets for the former, not aware of any for the latter.
 

Failed Unit

Established Member
Joined
26 Jan 2009
Messages
9,720
Location
Central Belt
In this age I think 1 week is about what is expected. Other ones in the region were about the same. (Potters Bar and Hatfield) which were both complex to tidy up.
 