... the another train? Also, can you express that distance in minutes like you would see in the train station.
At a train station you can sometimes see two services at the same platform at the same time with the front one departing a couple of minutes before the rear one and I don't just mean at origin stations or where portions divide.
That's called the headway. Michael's described it above so I shan't go into too much detail, but for example the headway on the Medway valley was about 12-14minutes due to the semaphore signalling along there.
To add to that, headways can readily be under two minutes, if that is what is required. For example, the signalling principles on many London Underground lines are not substantially different from National Rail tracks (i.e., they used fixed block colour light signalling, albeit with different technologies and working practices). These lines can comfortably achieve a train every 2 minutes or so.
Most NR Commuter lines have a "planning headway" of around 3-4 minutes, which is the rule followed when designing the timetable. It should be noted that the "planning headway" is designed to leave a little room for manouvre, as trains can be easily delayed by a few seconds here or there.
I should also note that a 3 minute planning headway can mean a wide range of distance separations between trains.
If two 40mph trains are planned to be 3 minutes apart, they will (at line speed) be 2 miles apart
If two 100mph trains are planned to be 3 minutes apart, they will be 5 miles apart.
So you can see that time separation and distance separation are two distinct things, and a slow train can follow another much closer (by distance) than a fast one.
Medway Valley is majority of Absolute Block (AB) working so 'headways' don't exist in terms of planning. With AB you can't depart a station until 2 minutes after the train in front of you has cleared the block section ahead.
AB indicates locations where absolute block signalling applies: here the headway is to be calculated from the transit time of the first of each pair of trains running between the consecutive block posts being considered.
Yes, but seeing as it is based on the SRT it is always stipulated as AB otherwise you would have a myriad of headways.
Out of interest, does anyone know the headway on the Maidstone East line? It's just that whenever trains from the coast are diverted that way, only 1tph ever runs between Ashford - Charing Cross.