Fazaar1889
Member
Just looked at https://www.railmaponline.com/UKIEMap.php and have seen the eastern leg, it's a fully thought-out route. Phase 1 is the most expensive (I think???) and I've heard that 2a is shovel-ready/the cheapest and thus is a low-hanging fruit to build. On the assumption that a future government builds the eastern leg in full, how hard/expensive would it be?