• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

How did the 10:47 Bedford to Bletchley make up so much time?

Status
Not open for further replies.

MikeT

Member
Joined
1 Feb 2020
Messages
17
Location
Bedford
Last Friday the 10:47 Bedford to Bletchley was delayed crossing the River Ouse bridge. It arrived at Bedford St Johns 42 mins late. Fast forward 40 mins and 10 station stops later and the train arrived at Bletchley only 24 mins late. If it can be done once, why not retime the services 18 minutes quicker?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

_toommm_

Established Member
Joined
8 Jul 2017
Messages
6,308
Location
South West London
Last Friday the 10:47 Bedford to Bletchley was delayed crossing the River Ouse bridge. It arrived at Bedford St Johns 42 mins late. Fast forward 40 mins and 10 station stops later and the train arrived at Bletchley only 24 mins late. If it can be done once, why not retime the services 18 minutes quicker?

Because it skipped all the intermediate stations, meaning the time built in for it to slow down, stop at each station, and accelerate back to line speed (or as close to as needed depending on the distance between the stations) wasn't needed:

 

lb001

Member
Joined
10 Dec 2023
Messages
70
Location
London
2S10 Bedford to Bletchley ran fast and did not call at any booked stations between Bedford St John’s and Bletchley on Friday 24th October, which is how it made up the time.

 

MikeT

Member
Joined
1 Feb 2020
Messages
17
Location
Bedford
Because it skipped all the intermediate stations, meaning the time built in for it to slow down, stop at each station, and accelerate back to line speed (or as close to as needed depending on the distance between the stations) wasn't needed:

Ha. I foolishly didn't spot "pass". What about the hundreds of passengers waiting for the train at Kempston Hardwick!!!!!
 

DarloRich

Veteran Member
Joined
12 Oct 2010
Messages
32,950
Location
Fenny Stratford
It didn't stop anywhere - compare that run with one of the freight trains and see what performance looks like. The empty stone train flies along the branch.

BTW - did it run in service? If so running non stop in service is a new one. I bet the sight of it flying through the local stations went down well!
 

_toommm_

Established Member
Joined
8 Jul 2017
Messages
6,308
Location
South West London
Ha. I foolishly didn't spot "pass". What about the hundreds of passengers waiting for the train at Kempston Hardwick!!!!!

Probably made to wait did the next train. I can imagine the uproar from them all at such a massive hub station!
 

The exile

Established Member
Joined
31 Mar 2010
Messages
9,481
Location
Somerset
Last Friday the 10:47 Bedford to Bletchley was delayed crossing the River Ouse bridge. It arrived at Bedford St Johns 42 mins late. Fast forward 40 mins and 10 station stops later and the train arrived at Bletchley only 24 mins late. If it can be done once, why not retime the services 18 minutes quicker?
Even ignoring the explanation for this event, basing a plan (ie a timetable) on what is done once is a potential recipe for disaster. I have managed to get home from work in 44 minutes once - planning based on anything less than 75 is asking for trouble.
 

bramling

Veteran Member
Joined
5 Mar 2012
Messages
20,457
Location
Hertfordshire / Teesdale
Last Friday the 10:47 Bedford to Bletchley was delayed crossing the River Ouse bridge. It arrived at Bedford St Johns 42 mins late. Fast forward 40 mins and 10 station stops later and the train arrived at Bletchley only 24 mins late. If it can be done once, why not retime the services 18 minutes quicker?

There’s generally quite little slack in timings these days.

If you look at schedules in something like RTTT, in general the only slack seen is various allowances (pathing, engineering or performance), and sometimes extra time built into station dwells. In general schedules without much of this will struggle to make up time unless something else applies, like a faster train provided compared to what the schedule is planned for, stations being skipped, or perhaps being routed on a fast line when booked on a slow line.

In olden times trains could make up time by treating speed limits a bit loosely, but you don’t see this nowadays. Or at least *very* rarely - I do remember a journey from King’s Cross to Hitchin about ten years ago on a pair of 321s where the train was being driven like a boy racer, but as an example of how rare it is this was about a decade ago and I haven’t experienced anything similar since. Back in the 90s in 317 days this was very common.
 

Crithylum

Member
Joined
21 May 2024
Messages
357
Location
London Borough of Ealing
This train made up 7 minutes from Cambridge to Stansted. The 755 being literal cruise missiles helps, although the extensions to Stansted were only introduced after the 755 indroduction (iirc), so surely they should be timed for 755s?

== Doublepost prevention - post automatically merged: ==

It seems like these services are being sped up by 3 minutes in the December timetable change, despite adding a stop at Cambridge South
 

Brubulus

Member
Joined
13 Oct 2022
Messages
974
Location
Cambridge
This train made up 7 minutes from Cambridge to Stansted. The 755 being literal cruise missiles helps, although the extensions to Stansted were only introduced after the 755 indroduction (iirc), so surely they should be timed for 755s?

== Doublepost prevention - post automatically merged: ==

It seems like these services are being sped up by 3 minutes in the December timetable change, despite adding a stop at Cambridge South
It probably got lucky at the airport tunnel, you usually have to wait for a Stansted Express service.
 

pokemonsuper9

Established Member
Joined
20 Dec 2022
Messages
4,662
Location
Greater Manchester
This train made up 7 minutes from Cambridge to Stansted. The 755 being literal cruise missiles helps, although the extensions to Stansted were only introduced after the 755 indroduction (iirc), so surely they should be timed for 755s?

== Doublepost prevention - post automatically merged: ==

It seems like these services are being sped up by 3 minutes in the December timetable change, despite adding a stop at Cambridge South
30 second dwell at Audley End instead of 3 minutes, and 2 minutes of pathing time not needed (since due to being late the path would already be free) will be a lot of that saving
 

dk1

Veteran Member
Joined
2 Oct 2009
Messages
19,911
Location
East Anglia
Back in the day I’ve easily made up 20 minutes on the East Suffolk line. Obviously speeds would be exceeded a bit but more importantly if the guard informed us there was nobody to get off we’d just slow down then whack it open and claw back a minute or so at lightly used stations such as Westerfield, Darsham & Brampton. The rest would be very brief stops with a buzz buzz & away. Sadly today the former would be classed as a fail to call resulting in disciplinary action.
 

MontyP

Member
Joined
18 Nov 2015
Messages
539
There’s generally quite little slack in timings these days.

If you look at schedules in something like RTTT, in general the only slack seen is various allowances (pathing, engineering or performance), and sometimes extra time built into station dwells. In general schedules without much of this will struggle to make up time unless something else applies, like a faster train provided compared to what the schedule is planned for, stations being skipped, or perhaps being routed on a fast line when booked on a slow line.

In olden times trains could make up time by treating speed limits a bit loosely, but you don’t see this nowadays. Or at least *very* rarely - I do remember a journey from King’s Cross to Hitchin about ten years ago on a pair of 321s where the train was being driven like a boy racer, but as an example of how rare it is this was about a decade ago and I haven’t experienced anything similar since. Back in the 90s in 317 days this was very common.
Surely it's the opposite? So many journeys seem to be padded these days to avoid being late at the ultimate destination. You only have to look at journey times vs 30 years ago to see this.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,966
Surely it's the opposite? So many journeys seem to be padded these days to avoid being late at the ultimate destination. You only have to look at journey times vs 30 years ago to see this.

This is a perception, and not reality.

There are only 5 types of timing allowances, and three of them (engineering time, pathing time, and adjustment time) are there to make the timetable fit together and in the first case to allow for temporary speed restrictions. There is more pathing time now than there used to be, but that is a function of there being more trains on the network.

The other two allowances are 1) performance allowance, which is designed to allow for minor delays that could reasonably be expected but the location of them will vary (eg all trains in the Welwyn viaduct area get a minute of performance allowance, and have done for a long time), and 2) public differentials, where the arrival time is advertised to passengers later than the working timetable. This latter one is the only one that can be reasonably said to be ‘padding’, and the amount of it in the timetable as a whole has fallen by almost 70% in the past few years.
 

87015

Established Member
Joined
3 Mar 2006
Messages
5,078
Location
GEML/WCML/SR
This is a perception, and not reality.

There are only 5 types of timing allowances, and three of them (engineering time, pathing time, and adjustment time) are there to make the timetable fit together and in the first case to allow for temporary speed restrictions. There is more pathing time now than there used to be, but that is a function of there being more trains on the network.

The other two allowances are 1) performance allowance, which is designed to allow for minor delays that could reasonably be expected but the location of them will vary (eg all trains in the Welwyn viaduct area get a minute of performance allowance, and have done for a long time), and 2) public differentials, where the arrival time is advertised to passengers later than the working timetable. This latter one is the only one that can be reasonably said to be ‘padding’, and the amount of it in the timetable as a whole has fallen by almost 70% in the past few years.
And slack SRTs and extended dwells, largely led by NR seniors inability to accept or understand aggregate running times because it doesn’t make their spreadsheet targets green so just want everything extended and massive extra PB.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,966
And slack SRTs and extended dwells, largely led by NR seniors inability to accept or understand aggregate running times because it doesn’t make their spreadsheet targets green so just want everything extended and massive extra PB.

I fundamentally disagree!
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,748
And slack SRTs and extended dwells, largely led by NR seniors inability to accept or understand aggregate running times because it doesn’t make their spreadsheet targets green so just want everything extended and massive extra PB.
Are you geuinely suggesting all SRTs are taken in isolation? If anything dwells are too short and that is down to TOC practices.
 
Joined
9 Dec 2023
Messages
591
Location
High Wycombe
and 2) public differentials, where the arrival time is advertised to passengers later than the working timetable. This latter one is the only one that can be reasonably said to be ‘padding’, and the amount of it in the timetable as a whole has fallen by almost 70% in the past few years.
Yeah looking at RTT+ for Marylebone back in October 2020 it looks like the public times were in most cases 5 mins later. It’s actually pretty nice like that because obviously late is technically on time, and on a good day you can even be several minutes early while also technically being on time!
 

Archvile

Member
Joined
12 Feb 2023
Messages
129
Location
UK
This is a perception, and not reality.

There are only 5 types of timing allowances, and three of them (engineering time, pathing time, and adjustment time) are there to make the timetable fit together and in the first case to allow for temporary speed restrictions. There is more pathing time now than there used to be, but that is a function of there being more trains on the network.

Interesting, I never knew that. I always assumed the 'engineering allowance' was for using slow lines when the fasts are under possession, or to allow for crossover speeds etc.
 

Taunton

Veteran Member
Joined
1 Aug 2013
Messages
12,342
This is a perception, and not reality.

(commentary on "So many journeys seem to be padded these days to avoid being late at the ultimate destination. You only have to look at journey times vs 30 years ago to see this.")


Really? Well, let's look at reality. Someone above mentions the local East Suffolk Line, Ipswich to Lowestoft. It's 50 miles.

1982. 25-year old (then) rattling Modernisation Plan Met-Cam dmu with piddling little 150hp engines. Vacuum brakes. All stations, end to end 80 minutes.

2025. Brand new Class 755 demu with whacking great 1,290hp engine, modern air brakes. Wow, might it even make the run within the hour? And it's now ... 86 minutes. And that's from new trains introduced by what was regarded as one of the better operators.
 

Brubulus

Member
Joined
13 Oct 2022
Messages
974
Location
Cambridge
(commentary on "So many journeys seem to be padded these days to avoid being late at the ultimate destination. You only have to look at journey times vs 30 years ago to see this.")


Really? Well, let's look at reality. Someone above mentions the local East Suffolk Line, Ipswich to Lowestoft. It's 50 miles.

1982. 25-year old (then) rattling Modernisation Plan Met-Cam dmu with piddling little 150hp engines. Vacuum brakes. All stations, end to end 80 minutes.

2025. Brand new Class 755 demu with whacking great 1,290hp engine, modern air brakes. Wow, might it even make the run within the hour? And it's now ... 86 minutes. And that's from new trains introduced by what was regarded as one of the better operators.
I would suspect this is due to increased dwells from sliding doors and lower line speeds as the line has decayed and standards have increased.
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,748
Interesting, I never knew that. I always assumed the 'engineering allowance' was for using slow lines when the fasts are under possession, or to allow for crossover speeds etc.
It is for both, TSRs for after engineering work and during engineering work in your example.

== Doublepost prevention - post automatically merged: ==

(commentary on "So many journeys seem to be padded these days to avoid being late at the ultimate destination. You only have to look at journey times vs 30 years ago to see this.")


Really? Well, let's look at reality. Someone above mentions the local East Suffolk Line, Ipswich to Lowestoft. It's 50 miles.

1982. 25-year old (then) rattling Modernisation Plan Met-Cam dmu with piddling little 150hp engines. Vacuum brakes. All stations, end to end 80 minutes.

2025. Brand new Class 755 demu with whacking great 1,290hp engine, modern air brakes. Wow, might it even make the run within the hour? And it's now ... 86 minutes. And that's from new trains introduced by what was regarded as one of the better operators.
You can guarentee that will be professional driving policies where you aren't going to platforms at higher speeds and dwell times as noted.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,966
Really? Well, let's look at reality. Someone above mentions the local East Suffolk Line, Ipswich to Lowestoft. It's 50 miles.

1982. 25-year old (then) rattling Modernisation Plan Met-Cam dmu with piddling little 150hp engines. Vacuum brakes. All stations, end to end 80 minutes.

2025. Brand new Class 755 demu with whacking great 1,290hp engine, modern air brakes. Wow, might it even make the run within the hour? And it's now ... 86 minutes. And that's from new trains introduced by what was regarded as one of the better operators.

In the up direction, 3 minutes of that is waiting time at Beccles whilst trains cross in the new loop. That wasnt needed in 1982. The rest (and more) will be the reduced linespeed (max 55mph) and the various automated crossings that have linespeeds below that, in some cases down at 15 mph, and in one case (Darsham in the down) requires the train to stop short of the crossing before then proceeding into the station. None of that applied in 1982.
 

dk1

Veteran Member
Joined
2 Oct 2009
Messages
19,911
Location
East Anglia
In the up direction, 3 minutes of that is waiting time at Beccles whilst trains cross in the new loop. That wasnt needed in 1982. The rest (and more) will be the reduced linespeed (max 55mph) and the various automated crossings that have linespeeds below that, in some cases down at 15 mph, and in one case (Darsham in the down) requires the train to stop short of the crossing before then proceeding into the station. None of that applied in 1982.
You do not have to stop short at Darsham before proceeding into the platform. Why Did you think that? it’s an AHB at Darsham.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,966
You do not have to stop short at Darsham before proceeding into the platform. Why Did you think that? it’s an AHB at Darsham.

Sorry, I have misread the sectional appendix, it‘s stop at the station before proceeding southbound from either platform. Of course trains that stop at the station for passenger calls stop anyway, but trains not calling there (test trains, rail head treatment, the occaisonal freight) all have to stop for the crossing southbound.

Nevertheless, there are plenty of speed restrictions for level crossings below the prevailing linespeed across the line - nearly 20 in each direction.
 
Status
Not open for further replies.

Top