zwk500
Veteran Member
This isn't as simple as you make it sound.The section of cutting constrained to two tracks is very short, so it might be worth opening that out a bit to the west and separating out the Meadowhall/GC routes.
This isn't as simple as you make it sound.The section of cutting constrained to two tracks is very short, so it might be worth opening that out a bit to the west and separating out the Meadowhall/GC routes.
This isn't as simple as you make it sound.
Does Sheffield need more London services? If there's a need for more seats to London, could this not be achieved by running longer trains? In the future won't this need potentially be met by links to HS2? (I know that's far from certain). Both of these seem a better idea than messing up journeys for people who want to travel to Sheffield from the East or West of England.Sheffield needs more London services and yes the Manchester services are important but there could be a more efficient use of paths for these than the EMR service. Ideally all Manchester services should either use the through platforms and not terminate in these, or terminate in the west-facing bay platform (or both).
Doesn't the 'clean up' time also serve as recovery time, to absorb delays to incoming stock/crews so that the outbound service can still depart on time?On the latter point, surely 20-30 minutes is excessive? I would say 10 minutes is enough for a quick clean/clear up if a more thorough clean of the train is done at St Pancras.
So what you are saying is that connectivity in the north should be discarded for the sake of more London connectivity. Ever heard of levelling up? Some of us actually want it and don’t want to be beholden to the capital.Leicester and Manchester are more valid comparisons with Sheffield than Leeds is as far as the link to London is concerned; Leeds seems to lean more towards Manchester than Sheffield does and Sheffield has stronger links with the East Midlands than it does with West Yorkshire. Leicester has 3 or 4 London services and I think another one of these could be extended to Sheffield.
Of the two existing London services from Sheffield, one is relatively slow, so I think at the very least there should be a half-hourly express service which does the journey in under two hours. People often seem to underestimate the size of Sheffield - as a city on its own it is bigger than both Manchester and Leeds.
I don't agree about Sheffield having stronger links with the East Midlands than West Yorkshire. When I lived in Sheffield I knew plenty of people who worked in Leeds, I don't remember anyone working in the East Midlands (apart from Chesterfield, which doesn't really count!). Also when I was based in Sheffield, all my company's regional meetings/training courses etc were in Leeds (because we were the 'Yorkshire' region). I doubt we were unusual.Leicester and Manchester are more valid comparisons with Sheffield than Leeds is as far as the link to London is concerned; Leeds seems to lean more towards Manchester than Sheffield does and Sheffield has stronger links with the East Midlands than it does with West Yorkshire. Leicester has 3 or 4 London services and I think another one of these could be extended to Sheffield.
I think improving the Sheffield - London service would be a good thing, but not at the expense of connectivity between Sheffield and other parts of the North.Of the two existing London services from Sheffield, one is relatively slow and only formed of 4-5 coaches, so I think at the very least there should be a half-hourly express 10-coach service which does the journey in under two hours. People often seem to underestimate the size of Sheffield - as a city on its own it is bigger than both Manchester and Leeds. If another London service was introduced then all 3 would be well-filled before long.
At present between Sheffield and Manchester we need to see punctual, full length fast trains every hour from both TPE and EMR before we ask for any more. Currently we don't and Northern operate more stoppers than either of them. They're often more reliable because they don't have to come from Liverpool, Cleethorpes, Nottingham or Norwich. It may take an extra 20 minutes but they're increasingly popular.So what you are saying is that connectivity in the north should be discarded for the sake of more London connectivity. Ever heard of levelling up? Some of us actually want it and don’t want to be beholden to the capital.
Wouldn’t you rather see decent connectivity to/from the North West, East Midlands and East Anglia with South Yorkshire? (don’t underestimate the size of Sheffield either). Not everything in the north needs to point south.
I’d rather see a 3rd fast between Sheffield and Manchester and a 2nd proper fast between Leeds and Sheffield before a 3rd London service. I’m sure the people of Sheffield would prefer that too, better connectivity across the north.
Leicester gets its 4tph London service due to it being on both routes rather than anything else. It is also 99 miles from London which is rather more commutable than Sheffield although as we know commuting patterns are rather different to how they were 3 years ago.
Also don’t forget that for vast swathes of South Yorkshire they are equally served by the major South Yorkshire railhead that is Doncaster which already has plenty of London trains and it’s a damn sight quicker.
Sheffield Victoria would be the wrong solution. I'm not sure Renishaw station would really help, the actual village isn't that big and Eckington is just as close to Halfway Tram stop and has good bus links. Sheffield Midland is reasonably central but not in the best position for where people want to go. There is also a massive problem of fitting more conflicting movements over Nunnery Jn and of getting enough platform space at Sheffield. IIRC a previous study (using a pre-covid timetable) had worked out that 1tph was just about doable but 2tph was never going to work. 1tph was judged to not be enough to generate sufficient passengers, so presumably this next stage of further study will either be re-evaluating the timetable options or looking at the financials for 1tph.Interesting article relating to improvements around Sheffield. I think reopening Sheffield Victoria is very unlikely based on what people have said in this thread, but 'the old road' is in good working station and it'd be useful if stations like Beighton and Renishaw reopened.
Also don’t forget that for vast swathes of South Yorkshire they are equally served by the major South Yorkshire railhead that is Doncaster which already has plenty of London trains and it’s a damn sight quicker.
BCR? It sounds very expensive for little gain.What would you say to a chord from Askham on the ECML to Worksop or a chord from Parkgate to Bawtry ?
BCR? It sounds very expensive for little gain.
The expense won’t just be the chord (which I’m assuming you are thinking of without everything that would go with it), it will also be electrification, signalling, trackwork, earthworks, bridge works, most likely compulsory purchase orders, grade seperated junctions (we can’t afford anymore flat junctions on the ECML) and finally capacity. You mention freeing up capacity on the MML but conveniently leave out taking up capacity on the already busy ECML south of Doncaster.Whatever you do will be expensive!
I would love to know why you think speeding up services to Sheffield and freeing up capacity on the MML is 'little gain' ?
In the context of the ECML, it is likely that a new line will be built bypassing Doncaster. HS2 as originally proposed is very much dead if not very nearly dead. Freeing up capacity for more services through Doncaster such as Sheffield to Hull.The expense won’t just be the chord (which I’m assuming you are thinking of without everything that would go with it), it will also be electrification, signalling, trackwork, earthworks, bridge works, most likely compulsory purchase orders, grade seperated junctions (we can’t afford anymore flat junctions on the ECML) and finally capacity. You mention freeing up capacity on the MML but conveniently leave out taking up capacity on the already busy ECML south of Doncaster.
So again I ask, BCR? What is the overall time saving benefit compared to the exorbitant cost of implementation and loss of crucial ECML capacity compared to electrification of the route that already exists with trains ordered ready for the day the juice is switched on on the MML which has the capacity for Sheffield services already factored in.
You're making an assumption that HS2 will reach Leeds via Sheffield. I'd say that is unlikely, as the train from London would be no faster than via the ECML and it would feed extra trains through places including Sheffield that have no capacity for them. I agree a Doncaster bypass is part of the solution (on the big assumption that it's a problem the government actually plans to tackle), but I think it would come off the ECML to the south and perhaps pick up some of the abandoned HS2 route towards Leeds - not towards Sheffield.In the context of the ECML, it is likely that a new line will be built bypassing Doncaster. HS2 as originally proposed is very much dead if not very nearly dead. Freeing up capacity for more services through Doncaster such as Sheffield to Hull.
It is too early to say how HS2 and NPR from Sheffield will reach Leeds although a new chord could also connect into a mix of new and upgraded line around that area.
My general thoughts are about how HS2 could reach Sheffield, which it is always presumed to be from the South rather than from the North which might be better.

I've mentioned before (can't remember where!!) using this dive-under when visiting Sheffield for an interview as an aspirant student. I travelled from St Pancras (via Clay Cross and a four-platform Dore & Totley IIRC) and back via Retford to KX.Get the Dive-under dug out and reinstated
You're making an assumption that HS2 will reach Leeds via Sheffield. I'd say that is unlikely, as the train from London would be no faster than via the ECML and it would feed extra trains through places including Sheffield that have no capacity for them. I agree a Doncaster bypass is part of the solution (on the big assumption that it's a problem the government actually plans to tackle), but I think it would come off the ECML to the south and perhaps pick up some of the abandoned HS2 route towards Leeds - not towards Sheffield.