nr758123
Member
The Local Shop for Local People was built on Deer Hill above Marsden.Well, Hadfield (where most of that was filmed) is on a local rail service from Manchester, albeit not Castlefield!![]()
The Local Shop for Local People was built on Deer Hill above Marsden.Well, Hadfield (where most of that was filmed) is on a local rail service from Manchester, albeit not Castlefield!![]()
I would guess not. The stations on thay line would probably do very well if it had the same service as the Altrincham line.
The Local Shop for Local People was built on Deer Hill above Marsden.

For metrolink to take on the line, Id have thought a metro tunnel would be needed under manchester.Hence why Metrolink would be a game-changer. There would be losers - Widnes and Warrington West being the main ones - but the vast majority would be winners. Liverpool-Sheffield could run via Chat Moss once an hour as a 6-car 185 formation, dividing at Sheffield for Cleethorpes and Nottingham, or just curtail one of them to Manchester Pic.
== Doublepost prevention - post automatically merged: ==
I was going to say "except the shop itself" but you beat me to it![]()
For metrolink to take on the line, Id have thought a metro tunnel would be needed under manchester.
Well it would need additional central Manchester capacity for the tram system, there are other ways to provide it than some enormously expensive tram tunnel.
What would the cost of this be and wouldn't you still need a way to give Birchwood, Widnes and Liverpool South Parkway a Manchester rail link?What ways would that be? It wouldn't be a tram tunnel to begin with, if it came to pass. Tram-trains on the surface; metro trains underground.
It wouldn't be a tram tunnel to begin with, if it came to pass. Tram-trains on the surface; metro trains underground.
What ways would that be?
wouldn't you still need a way to give Birchwood, Widnes and Liverpool South Parkway a Manchester rail link?
What would the cost of this be and wouldn't you still need a way to give Birchwood, Widnes and Liverpool South Parkway a Manchester rail link?
Rather than change modes those that can will just drive"Get off the Merseyrail train at Warrington, walk down the platform and board a tram"?
Or double back through Lime Street
Rather than change modes those that can will just drive
Even if the number lost is in the 1000s? I think most through passengers would get into their cars unless like me they have no choice.1 passenger lost, 10 gained.
Rail does not have to retain all existing passengers at any cost - it has to ensure maximum possible traffic.
Even if the number lost is in the 1000s? I think most through passengers would get into their cars unless like me they have no choice.
The adjacent viaduct cant be used and its being turned in to a national trust park in order to get some use and restoration for it.Tram trains and metro trains are essentially interchangeable, I don't think its safe to assume what would be going through such a tunnel.
Well ultimately the current bottleneck is in between Cornbrook and the 4-platform station at St Peter's Square.
There is an adjacent twin track-width unused viaduct for much of the route, and if some car parking is sacrificed it may be possible to force four tracks throughout.
Certainly cheaper than a full blown metro tunnel.
Most stockport-london passengers will benefit from the airport hs2 station and piccadilly hs2. The town wins overall id say.Birchwood would be served by Metrolink services to Manchester 5 times per hour. This is better than one fast train per hour (the stopper isn't really relevant). Go and ask people in Ormskirk if they prefer 4tph to Liverpool as they have, or if they'd rather 1tph fast and 1tph slow, and I don't think many are going to choose the latter.
Widnes would be a loser, they'd have to change. Every beneficial scheme has a loser, e.g. Coventry and Stockport are the big HS2 losers, as their present 3tph fast to Euston is only provided out of convenience, they don't justify it on their own.
South Parkway could travel via Liverpool and onto the TPE fasts, or if they prefer change at Warrington C.
Flixton has a population around the 11,000 mark, much of which is in residential areas. Is the existing rail service something seem as attractive?
I would guess not. The stations on thay line would probably do very well if it had the same service as the Altrincham line.
I think they mean the Altrincham Metrolink lineDoesn't Flixton have something like 20 services each way during the week, which I think is slightly more than Altrincham (Mid Cheshire line). And on Sundays, a broadly hourly service each way, whereas Altrincham is only once every two hours.
Probably, but just wanted to emphasise that the heavy rail service frequency through Altrincham is mediocre at best.I think they mean the Altrincham Metrolink line
Probably, but just wanted to emphasise that the heavy rail service frequency through Altrincham is mediocre at best.
As Glenn stated, im referring to the metrolink line. I dont think many people have a prefence for using the heavy rail link from Altrincham to Piccadilly, other than a dedicated few.Probably, but just wanted to emphasise that the heavy rail service frequency through Altrincham is mediocre at best.
Well ultimately the current bottleneck is in between Cornbrook and the 4-platform station at St Peter's Square.
.
More accurately, it is most likely the crossing of Oxford Street to get into St Peters Square that is the actual limitation, and the impact of the traffic lights on the operation of the trams.
Indeed so. The 2-track line through Cornbrook and over the viaduct could accommodate more than the planned maximum of 45tph (a tram every 80 seconds on average), but Oxford Street would effectively be barred to road traffic if the traffic signal priorities were adjusted to pass more trams than this (many are double sets 56m long, traversing the crossing at little more than walking pace).More accurately, it is most likely the crossing of Oxford Street to get into St Peters Square that is the actual limitation, and the impact of the traffic lights on the operation of the trams.
Indeed so. The 2-track line through Cornbrook and over the viaduct could accommodate more than the planned maximum of 45tph (a tram every 80 seconds on average), but Oxford Street would effectively be barred to road traffic if the traffic signal priorities were adjusted to pass more trams than this (many are double sets 56m long, traversing the crossing at little more than walking pace).
Indeed so. The 2-track line through Cornbrook and over the viaduct could accommodate more than the planned maximum of 45tph (a tram every 80 seconds on average), but Oxford Street would effectively be barred to road traffic if the traffic signal priorities were adjusted to pass more trams than this (many are double sets 56m long, traversing the crossing at little more than walking pace).
So really the problem is the inability to route traffic on Oxford Street around that crossing?
Because ideally we'd have 50tph or more to allow Atherton and Warrington conversions.
If you want to put both Atherton and Warrington over the track west of St Peter's Square, you would need that though.Additional capacity is not needed for Atherton.
Warrington is what can’t fit. You’ve got 45 tph running through SPS, which can service 15 tph to Piccadilly, 15 tph to Victoria and 15 tph to Salford Central (5 to Wigan via Atherton and 10 to Eccles & Media City).If you want to put both Atherton and Warrington over the track west of St Peter's Square, you would need that though.
Although myself I often ponder Atherton via Victoria.......
Warrington is what can’t fit. You’ve got 45 tph running through SPS, which can service 15 tph to Piccadilly, 15 tph to Victoria and 15 tph to Salford Central (5 to Wigan via Atherton and 10 to Eccles & Media City).
Salford Central?
EDIT:
If you are going to serve Salford Central, wouldn't it be more logical to run along Chapel Street and join the core lines at Victoria?
That allows you access to the line through Shudehill and Piccadilly Gardens to Piccadilly, which still has plenty of spare capacity.
Well given that we have projects that you are saying there is not capacity for, funneling even more trams into the limiting portion of the system sounds like a bad idea.Why? There is capacity
and a line from Chapel Street to Alibert Square to join the 2CC opens access to a part of the city centre that is not served by the tram.