running fewer trains is clearly one possible answer to that, albeit not one that is necessarily desirable. (Although it might be on some lightly used services, such as my 5MW train home last night that had about 30 people on it.)
A few decades ago the Swiss considered shortening trains outside the peaks. They concluded that the shunting would take as much as they saved from main-line running as the trains were mostly loco-hauled. Maybe other costs came into that too.
However nowadays I wonder if it would be worth re-examining. Your 5MW train would presumably use about 3 MW if it was half the length, so if we plannned our services around double sets (properly connected throughout) but singles in the evenings it would save some energy, albeit at the cost of doubling the number of driving cabs to be built and carried round.
A benefit on the WCML would be that at times of day when the full train length was not justified a "fast" Scottish departure from Euston could couple with the previous hour's class 9 at Stafford or Crewe and then split at Carlisle or Carstairs, giving better connectivity and a much better service than now - or even pre-Covid - when passengers on the Class 9s are at the mercy of the connection into the shorter TPE services N of Preston for Glasgow and Edinburgh alternate hours.
Of course there is no Birmingham to Glasgow service at all at the moment...