Really? I would have thought that as it is the lions' share of what the railway uses it is worth thinking about - and building into strategy. Maybe not a lot to be done now, although don't the French TGV routes have coasting boards where on-time trains can cut power? A more resilient timetable might allow more of that here.
Higher speed gobbles up power (3rd - or higher? [mathematical] power of speed) and, to my mind, service frequency and reliability is more important anyway: Timetables need to be re-drawn to provide a good service for the whole country with connectivity as a priority, rather than the Balkanised airline-on-wheels express services we have on some lines currently.
Voyagers are apparently notoriously fuel-hungry, and there must be figures for the other fleets. Need to learn from this for future procurement.
Ancillaries on trains also need to be considered, both at the design stage and in use. (I saw that the Germans are experimenting with solar pv on the roof of a bus trailer because the hauling bus can't supply eneough electricity to power the a/c on both
https://www.ra ilforums.co.uk/threads/solar-panel-on-munich-trailer-bus.229913 I would ask whether they can't just have better-insulated and ventilated trailers that are bearable in the summer...)
We all need to recognise that our high demands have energy implications: faster trains, warmer interiors in winter, air-conditioning in summer... Just adjust our expectations and dress for the season!