All trains should have 1 minute engineering allowance approaching Tebay, not just 390s.
Noticed that when I had a look in the planning rules, not that everything does!
All trains should have 1 minute engineering allowance approaching Tebay, not just 390s.
The present track layouts at Dundee and Inverness both date from the second half of the 1980s and already contain a good number of crossovers and turnouts fit for 40 mph. Those with lower speeds are likely to be constrained by the physical characteristics of the sites.
Aberdeen's layout dates from the early 1980s and looks as though it might benefit from some higher speed turnouts.
Perth's steam age layout needs ripping up and starting again.
It actually varies in different parts of the UK. Between Taunton and Exeter where the line speed is 100 I feel more lateral G forces than anywhere else in the country. It's a stretch you don't want to try to walk the length of the train to buy a coffee and take it back to your seat.I may be wrong but I seem to remember reading permisable speeds on curves are often lower in the uk than elsewhere.
K
It actually varies in different parts of the UK. Between Taunton and Exeter where the line speed is 100 I feel more lateral G forces than anywhere else in the country. It's a stretch you don't want to try to walk the length of the train to buy a coffee and take it back to your seat.
It actually varies in different parts of the UK. Between Taunton and Exeter where the line speed is 100 I feel more lateral G forces than anywhere else in the country. It's a stretch you don't want to try to walk the length of the train to buy a coffee and take it back to your seat.
It actually varies in different parts of the UK. Between Taunton and Exeter where the line speed is 100 I feel more lateral G forces than anywhere else in the country. It's a stretch you don't want to try to walk the length of the train to buy a coffee and take it back to your seat.

I always scalded my hands with the Maxpax BR coffee on the reverse curves just south of Winsford. They have been eased now.
(image removed - no applicable COSHH assessment found)
Adding the Down Loop?
The current Down fast is now a straight from Hartford to Winsford, so you're probably right.I always assumed that the extra two tracks to crewe must have been added east of the original formation and the main lines slewed to connect to the fasts.
It could only conclude that it should be disposed of to a licensed processor; definitely not for internal consumption.I have never yet seen a suitable COSHH assement for Maxpax coffee (or even a hazard datasheet).