If it is guessing in that way when it is late it should really add the SRTs and minus the pathing and performance allowances.
Predicting the future is difficult. To do it well, you need what is essence artificial intelligence which is able to understand the human brain and determine what regulation decisions are likely to be made. This is interesting reading on those lines.RTT is not so good at predicting the future.
RTT will look, in some very limited areas, at trains ahead of the existing one where I have modelled the track (pointwork, lines, etc) so it can attempt to 'follow on' and attempt to second guess any regulation decisions, such as looping. Needless to say, this isn't one of them.It was some 15 minutes late, so it lost its sequence and meant it would conflict with the CLC stopper from Oxford Road.
Turning this over in my head, I decided to let the EMT go and get the following Airport-Liverpool 319 via Chat Moss instead, which was pretty much to time.
While travelling I kept track of the CLC trains, and predictably the stopper was let out at Oxford Road on time and duly held up the EMT service all the way down the line to Edge Hill.
In the end the 319 overtook the EMT and arrived 15 minutes ahead of it at Lime St.
Meanwhile the RTT feed continually showed an over-optimistic arrival for the EMT service, not correcting for the delay behind the stopper.
On a side note, it's worth noting that many industry systems have huge budgets purely for system development (hundreds of thousands of pounds, in some cases millions). I have a development budget of about, er, nil and yet, most of the time, come very close to reality. Even the hosting budget for many systems is huge - whereas at the moment I'm struggling to find the money to go for a ~£10,000 upgrade on new servers and a new hosting location so that RTT can be improved in the future. Difficult times.