Dore Station Junction to Earles Sidings SBI'm guessing DE = Dore to Earles ?
Dore Station Junction to Earles Sidings SBI'm guessing DE = Dore to Earles ?
Earle’s SidingsOr could be Dore to Edale. Where's the Route boundary?
Must be getting moved then, as the LNW(N)/LNE route boundary is currently at 154mi20ch - 88 yards west of Dore West Jn.Earle’s Sidings
It is getting moved in line with the controlling signalling location so Dore to Earle’s goes to York ROC and the Regional boundary moves with it.Must be getting moved then, as the LNW(N)/LNE route boundary is currently at 154mi20ch - 88 yards west of Dore West Jn.
Earles sidings remains LNW(N) with the Bamford loop in LNE.It is getting moved in line with the controlling signalling location so Dore to Earle’s goes to York ROC and the Regional boundary moves with it.
Yes correctEarles sidings remains LNW(N) with the Bamford loop in LNE.
And there's no immediate plan to resignal further west although it will happen one day.Yes correct


At last! The exciting part begins!When stumps were drawn last night a few sleepers and a very short section of track was left below Twentywell Lane road bridge. At long last rail users at Dore & Totley can see real progress.
Next will come in May with work on foundations for the footbridge towers, new platform and extension to the current platform.
View attachment 133233


got some more shots of the progress here - there's from just before the station down to further than you can see from the MML - will make an edit if i can see how far down when my train comes back down to get to hope valley - and the sleepers reach most of the way up the platform.When stumps were drawn last night a few sleepers and a very short section of track was left below Twentywell Lane road bridge. At long last rail users at Dore & Totley can see real progress.
Next will come in May with work on foundations for the footbridge towers, new platform and extension to the current platform.
View attachment 133233


got some more shots of the progress here - there's from just before the station down to further than you can see from the MML - will make an edit if i can see how far down when my train comes back down to get to hope valley - and the sleepers reach most of the way up the platform.
View attachment 133300View attachment 133301
edit: both the sleepers and the knew track end just south of the bridge over the track, a bit south of dore station junction.


Apologies if I am being dense here but surely that should have been known in the first place? Wasn't it @Bald Rick that said you pay for your ground conditions / groundwork whether you do them or not?Work on the Dore loop/chord at West View Lane is halted as the hill side below Poynton Wood has proved unsuitable for further soil nailing. Work on a different solution is understood to be starting soon.
Apologies if I am being dense here but surely that should have been known in the first place? Wasn't it @Bald Rick that said you pay for your ground conditions / groundwork whether you do them or not?
It's only a token 100m length so far, just from the station to the bridge in background of my picture.
== Doublepost prevention - post automatically merged: ==
Work has started on foundations for the second platform at Dore & Totley - and the cherry blossom by the car park is good to see.
Until 1985 Dore & Totley had 4, but only 2 operational since the 1960s. Here's how it was in the 1920s.Nice pictures - it must be pretty exciting for anyone regularly using Dore & Totley station to see substantial improvements being built literally right in front of them. I'm a bit jealous - although I shouldn't be really as my local station already has three platforms!


I can confirm that there are a lot of old building remains hidden in those trees. At one time there was a brick works at the top of the slope but I remember a lot of smaller building debris and foundations scattered all over the hilside.
eI have relatives in the Totley, Coal Aston and Eckington areas and they have mentioned before that there is a belief that a lot of local woods were planted around the time of WW1 as a result of large-scale deforestation for wood to be used in the construction of trenches and pit-props for the mines which were rapidly expanding to meet the wartime demand for coal. Not sure how accurate it is, or if it's only specific woods.I Spent most of my Childhood playing in those woods so I knew every inch of them by the time I was a teenager. There are many signs that the woods are relatively modern - probably younger than the railway.
Ground investigation was carried out in 2021, but despite this the ground conditions were unforeseen. The GI concluded the slope was clay, but it also contains a counterfort drain (loose rock and brick). Also the ground water level is higher than expected, possibly exasperated by the wet winter (see Nuneham viaduct).Apologies if I am being dense here but surely that should have been known in the first place? Wasn't it @Bald Rick that said you pay for your ground conditions / groundwork whether you do them or not?

Until 1985 Dore & Totley had 4, but only 2 operational since the 1960s. Here's how it was in the 1920s.
View attachment 136287


Ended up at Dore & Totley today so got some photos
View attachment 137537
Track looks to be in starting to enter their place to the South of the station.
View attachment 137538
Not a whole lot seems to have changed this week, this looks quite similar to Monday's images.
Interesting to note what actually has occurred in the five years that this thread has been running.
I'm sure this has been discussed before - maybe in this very thread!I digress but this saga gets worse. The Hope Valley scheme is now bigger than just redoubling at Dore. It grew by 2013 into a plan to provide 2 extra hourly fast paths between Sheffield and Manchester.
By 2015 it was realised that couldn't happen due to congestion into both Manchester and Sheffield and the scope was reduced to only one extra fast path. Delivery is imminent and it has dawned that even one extra hourly path is problematic. Why? Partly removal of those two tracks from Dore into Sheffield. Can they be restored? No. Parts of the old track bed have been sold off and built on, bridges have been removed and various items of lineside eqipment would need resiting.