Killingworth
Established Member
You're correct in that realignment is happening each weekend to allow weekday running before it's all connected up in final positions, like the diagram displayed at the station in a fancy touch screen interactive display!Many thanks Killingworth. The first photo is the area behind the Industrial hamlet and Beauchief Gardens. Am I right in thinking that the bridge over the Sheaf is just out of shot at the bottom on the photo?
In this temporary layout the Down line appears to be going to the Up platform, I guess this will be re-aligned as the project progresses.
Here's how it looked on 2nd July at the start of this phase. You can see the bridge more clearly to compare. It's only about 40 years since there were 4 tracks from here into Sheffield.

== Doublepost prevention - post automatically merged: ==
I've not seen specific details of that but I've heard the work suffered during the last strike and completion is likely to be delayed for 6 months to get a new possession.Thanks a million for the updates Killingworth, don't suppose you happen to know what the works are at the Hazel Grove end?
In all the bits and pieces I've accumulated this may be a clue; "Buxton freight points. Installation of a set of points on the line to Buxton to allow direct access to the CNB1/2/3 lines from the BEJ lines" "This will provide a diverse route into this area for freight customers. This enhancement provides value to all customer stakeholders in the area and FOC’s as a key part of their business."
Due for implementation 2022 so looks to be part of it. I've been concentrating on the Hope Valley bits so may have more buried deep in the files. Will go excavating when I have a spare hour!
== Doublepost prevention - post automatically merged: ==
Platform 1 is to be restored to roughly it's original length, truncated in 1985. Platform 2 will be roughly the same length as island Platforms 2 and 3 removed in 1985. There is passive provision for a (very unlikely, not least due to the proximity of the River Sheaf)) restoration of Platforms 3 and 4. The width of the new platform is a local bone of contention as it's supposedly too narrow to allow more than the slimmest of small bus shelter type structures.That's a rather large Platform 2! Future-proofed?
It's not rather large when maybe 100 Manchester bound commuters or 50+ Saturday morning leisure users wait for delayed trains!

But the days of a W H Smith's shop between Platforms 2 and 3 are long gone.