Yes. Its true. I work it. A train cannot stand at s48 to then let a train pass on the Down Main. On the panel, the overlap will drop out visually, but the interlocking will still not allow the Down Main to be set past Dore South Junction. The only way this can happen is by way of an emergency release, for emergency use only, if a train has failed at S48 for example, but we need a guarantee from the driver at s48 that no movement will be made, and to advise the driver that trains will be passing on the Down Main. Its a written rule too, in the panels Signal Box Special Instructions. S48, is really close to the mainline. Like I said, that process is for emergency use only. S48 is not a place we can/or are allowed to stand a train when traffic needs to pass on the down. And the other problem, the emergency release has been out of use for the last 3 years anyway.Is this actually true whenever a train is standing at S48, or is it an overlap that will time out and free the route after a period that indicates the train approaching it must have come to a stand or almost so?
== Doublepost prevention - post automatically merged: ==
Yes, I believe it will get a standard length overlap that gets rid of this problem.It's ludicrous that the interlocking doesn't allow a train to be signalled on the down Midland main line if a train is standing on the curve at Dore South Junction. Any plans to move signal S48 further away from the main line as part of the impending resignalling?