https://www.bbc.co.uk/news/articles/cev80rpxpvno says

Severe weather forces closure of storm-hit port terminal​

One of Britain's busiest ports has closed one of its terminals following a "berthing incident" caused by severe weather conditions.

The incident took place on Friday at Terminal 5 of Holyhead Port on Anglesey, Stena Line Port announced, who said the terminal will remain temporarily closed to ensure safety.
It added that the port "continues to facilitate the full sailing schedule for ferry operators".
Let's hope that it is less serious this time around...
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

185143

Established Member
Joined
3 Mar 2013
Messages
5,333
https://www.bbc.co.uk/news/articles/cev80rpxpvno says

Let's hope that it is less serious this time around...
I'd assume it is, to be fair.

The port is still open and using the single berth timetable at least until it can be inspected.

Last time was an immediate closure. I'm using the port on Sunday and Monday. Only booked yesterday and it was down as being the current timetable, with a weather warning note for the weekend with some sailings amended.

Hope it sticks to that as the single berth timetable doesn't fit my plans at all.
 

Lewisham2221

Established Member
Joined
23 Jun 2005
Messages
2,750
Location
Staffordshire
Stena Estrid has collided with the remaining serviceable berth earlier today, closing the port again.

The UK's second busiest passenger ferry port has been forced to close after a berthing incident as a ship docked.

It is the second time in a year that Holyhead has been closed to ferries.

Stena Line, which operates the port, said the incident happened as its vessel Stena Estrid arrived on Wednesday morning from Dublin.

All services on both Stena and Irish Ferries have been either cancelled or delayed.

The port operates Terminal 3 and Terminal 5.

However, Terminal 5 was closed following an incident in December as one of the ferries docked in the port.

Poor weather conditions delayed underwater surveys, with repair work expected to get underway this month.

In the meantime, both Stena Line and Irish Ferries were sharing Terminal 3, after altering their timetables to accommodate both services running from a single terminal.

But with Terminal 3 now out of action, it means no ships can dock.

The Stena ship Estrid was travelling from Dublin at 04:30 on Wednesday and was due to dock at 08:00.

The ferry company said all passengers and freight operators "disembarked as normal".

A Stena spokesperson said: "A berthing incident occurred on Wednesday 7 January 2026 as the Stena Estrid berthed at Holyhead Port.

"The incident is currently being investigated.

"Holyhead Port is temporarily closed and ferry operators are notifying customers."
 

AlastairFraser

Established Member
Joined
12 Aug 2018
Messages
4,146
Stena Estrid has collided with the remaining serviceable berth earlier today, closing the port again.

I wonder why there are only 2 berths for ships on this route at Holyhead. It seems stupid to rely on only 2 berths on a route that is so crucial to British trade.
 

Steddenm

Established Member
Joined
2 Mar 2017
Messages
1,250
Location
Clane, Co. Kildare
Looking at Stena Estrid it appears to be listing slightly on her portside.

FB_IMG_1767856215066.jpg
She may have had some damage to her superstructure under the waterline.

image shows the ferry, MV Stena Estrid docked in Holyhead Port in the night with her apparently listing portside. All lights are on on the vessel.
 

Acathater

Member
Joined
11 Dec 2025
Messages
669
Location
NorthWest
the online service status pages for both ferry companies seem to show departures as normal - with some even running early

 

AndrewE

Established Member
Joined
9 Nov 2015
Messages
7,304
Looking at Stena Estrid it appears to be listing slightly on her portside.

View attachment 195475
She may have had some damage to her superstructure under the waterline.

image shows the ferry, MV Stena Estrid docked in Holyhead Port in the night with her apparently listing portside. All lights are on on the vessel.
I think a ship's superstructure is all above the waterline!
Maybe they have just loaded or unloaded unevenly, and it will get levelled up when the other side is completed...
 

Acathater

Member
Joined
11 Dec 2025
Messages
669
Location
NorthWest
I think a ship's superstructure is all above the waterline!
Maybe they have just loaded or unloaded unevenly, and it will get levelled up when the other side is completed...
"Tynwald" & "King Orry" used to routinely sail from Heysham listing like that.
One of the deckhands told me that in Tynwald's case it was because the ballast tank pumps were worn out
 

gabrielhj07

Established Member
Joined
5 May 2022
Messages
1,600
Location
Herts
Looking at Stena Estrid it appears to be listing slightly on her portside.

View attachment 195475
She may have had some damage to her superstructure under the waterline.

image shows the ferry, MV Stena Estrid docked in Holyhead Port in the night with her apparently listing portside. All lights are on on the vessel.
I’ve heard that there’s damage to her starboard side below the waterline, so she’s been heeled over to keep it in the air.
 
Joined
8 Nov 2025
Messages
12
Location
Staffordshire
Had they got around to repairing the first damaged berth yet? Or are both berths now out of action? The fact this is now the third such incident in as many years raises a few eyebrows about the state of the whole system.
I can't help but be reminded of that old Clark and Dawe sketch. "Well, the port isnt supposed to fall off"
 

EyeKay

Member
Joined
16 Mar 2024
Messages
88
Location
UK
I wonder why there are only 2 berths for ships on this route at Holyhead. It seems stupid to rely on only 2 berths on a route that is so crucial to British trade.
Like most things, I guess it comes down to who would pay for the infrastructure that is only used occasionally.
 

StoneRoad

Member
Joined
6 Jan 2010
Messages
479
Location
Haltwhistle
Listed as Terminals 3 & 5 ... I echo the question why only two linkspans are normally available in such a busy port ?

As for berths [not] getting clouted by berthing ships ... that's down to both enough training and weather / tidal conditions affecting the controllability of the vessel.
Watching Manxman pirouette to present her stern to the linkspan at Douglas & Heysham and then back in - it takes a few minutes.
Some modern ferries - like cruise liners - have a massive windage which can make docking more difficult ...

it's bad enough trying to park 11 1/2 tons of wooden boat into a pontoon berth in a crosswind, with a long keel, single propellor / rudder set-up.
 

Acathater

Member
Joined
11 Dec 2025
Messages
669
Location
NorthWest
not just modern ferries.......at Heysham, Mona's Isle used to create panic whenever it arrived due to the number of times it hit things - linkspan, other ships, sea wall... Sometimes it even missed the harbour entrance and got beached. Combination of too much windage and not enough power
 

AlastairFraser

Established Member
Joined
12 Aug 2018
Messages
4,146
Like most things, I guess it comes down to who would pay for the infrastructure that is only used occasionally.
True, this is the kind of provision that should really be legislated to make sure that at least a berth and a backup berth is constantly available at crucial ports like Holyhead.
 

Trainbike46

Established Member
Joined
18 Sep 2021
Messages
4,362
Location
belfast
At least one of the berths appears useable as there are still sailings, with both Irish and Stena. It sounds like on this occassion the damage was to the ship, not the berth.

Though the Stena Estrid is clearly out of action, with the Stena Nordica filling in, and the Ben-my-Chree (IOM Steam Packet) filling in on Rosslare-Fishguard.
 

Krokodil

Established Member
Joined
23 Jan 2023
Messages
6,525
Location
Wales
True, this is the kind of provision that should really be legislated to make sure that at least a berth and a backup berth is constantly available at crucial ports like Holyhead.
That's exactly what does exist. However both of them got pranged.

== Doublepost prevention - post automatically merged: ==

Though the Stena Estrid is clearly out of action, with the Stena Nordica filling in
Local staff tell me that the substitution was imminent anyway, so that Estrid could go in for a scheduled refit. The ballast tanks of Estrid were used to force a list and keep the hole out of the water until divers could arrive and weld a patch onto it so that the ship could make its way to dry dock.
 

90019

Established Member
Joined
29 May 2008
Messages
6,890
Location
Featherstone, West Yorkshire
not just modern ferries.......at Heysham, Mona's Isle used to create panic whenever it arrived due to the number of times it hit things - linkspan, other ships, sea wall... Sometimes it even missed the harbour entrance and got beached. Combination of too much windage and not enough power
Was it navigated by Leslie Philips?
 

185143

Established Member
Joined
3 Mar 2013
Messages
5,333
That's exactly what does exist. However both of them got pranged.

== Doublepost prevention - post automatically merged: ==


Local staff tell me that the substitution was imminent anyway, so that Estrid could go in for a scheduled refit. The ballast tanks of Estrid were used to force a list and keep the hole out of the water until divers could arrive and weld a patch onto it so that the ship could make its way to dry dock.
Yes and no. Estrid was due to depart imminently.

Nordica was planned to be released by Ben-my-Chree for approximately 4 months. Though Estrid was covering for one of the Birkenhead-Belfast ships, I think Edda was planned for refit first. That's obviously now set back until Estrid's emergency dry docking is completed.
 

AlastairFraser

Established Member
Joined
12 Aug 2018
Messages
4,146
Linkspans cost tens of millions
Do you really think they're going to be sitting around as backup spares?
Holyhead is absolutely crucial to not just the North Wales economy, but the economy of the entire UK and Ireland too. This is the second time there has been a degraded service plan in recent years and nearby ports cannot cope with anywhere near the level of traffic that Holyhead does.
It's a matter of national importance that there is some sort of resilience beyond 2 linkspans at the port, and if it means perhaps a subsidy for increased ferry frequency to justify investment in additional linkspans, or an upgrade of alternative suitable facilities so they can take all rerouted Holyhead traffic, then it would be a worthy investment.
 

Acathater

Member
Joined
11 Dec 2025
Messages
669
Location
NorthWest
Holyhead is absolutely crucial to not just the North Wales economy, but the economy of the entire UK and Ireland too. This is the second time there has been a degraded service plan in recent years and nearby ports cannot cope with anywhere near the level of traffic that Holyhead does.
It's a matter of national importance that there is some sort of resilience beyond 2 linkspans at the port, and if it means perhaps a subsidy for increased ferry frequency to justify investment in additional linkspans, or an upgrade of alternative suitable facilities so they can take all rerouted Holyhead traffic, then it would be a worthy investment.
If there's to be a subsidy to allow spare linkspans, that needs to come from the Irish government.
 

berneyarms

Established Member
Joined
26 Nov 2013
Messages
3,110
Location
Dublin
If there's to be a subsidy to allow spare linkspans, that needs to come from the Irish government.
So the Irish government should solely subsidise an investment that would prevent damage such as was suffered by the local economy in Anglesey during the extended closure last time?

This is important to both economies either side of the Irish Sea.
 

AlastairFraser

Established Member
Joined
12 Aug 2018
Messages
4,146
If there's to be a subsidy to allow spare linkspans, that needs to come from the Irish government.
It is crucial to the economy of N Wales too, they already get proportionally less transport investment per capita than South Wales does (especially the Valleys).
The need for increased state support for innovation and reliability for the UK maritime industry was a key theme identified in the Union Connectivity Review commissioned by the UK government back in 2021.

== Doublepost prevention - post automatically merged: ==

So the Irish government should solely subsidise an investment that would prevent damage such as was suffered by the local economy in Anglesey during the extended closure last time?

This is important to both economies either side of the Irish Sea.
Exactly
 

Acathater

Member
Joined
11 Dec 2025
Messages
669
Location
NorthWest
So the Irish government should solely subsidise an investment that would prevent damage such as was suffered by the local economy in Anglesey during the extended closure last time?

This is important to both economies either side of the Irish Sea.
The ferry exists to either export products from Ireland, or to carry products to Ireland - little of which will be of UK origin. It's up to Ireland to protect its supply routes. Cessation of the ferry would have relatively little effect on the UK
 

90019

Established Member
Joined
29 May 2008
Messages
6,890
Location
Featherstone, West Yorkshire
The ferry exists to either export products from Ireland, or to carry products to Ireland - little of which will be of UK origin. It's up to Ireland to protect its supply routes. Cessation of the ferry would have relatively little effect on the UK
What on earth gives you that idea?

Having spent the last couple of years dropping and picking up trailers from ports (including Holyhead on a fairly regular basis), I can assure you that there are plenty of UK products being transported to Ireland on the ferries - hauliers aren't just sending empty trailers across and bringing back full ones.
 