The elephant in the room: HS2. There are existing arguments over the fact that the London-Birmingham-Crewe-Manchester line is being considered as a project benefiting both England and Wales for funding purposes. Without getting into that patch of long grass again, the planned rolling stock and routes for HS2 do not include any trains to Chester or North Wales, neither do they include any bi-mode designs (not even the classic-compatible variety). This implies that any London-North Wales services will remain on the WCML, or involve a change onto HS2 at Crewe.
In light of the HS2 situation, I reckon that if Westminster agreed to fund the electrification of the NWCL, in order to allow direct classic-compatible services post-HS2, the argument over HS2 funding and Barnett consequentials would evaporate overnight. That may even be what the Welsh Government are trying to manoeuvre towards.
I'm not aware of a separate report either. There would have been a lot of legwork on a local level feeding into the final report: a lot of details would need to be omitted. (It's possible that what I was told was originally mess room gossip from one of the inspectors/surveyors.)The 1981 'Review of Main Line Electrification' is available on the web (https://www.railwaysarchive.co.uk/documents/DoTBRB_Electrification1981.pdf). Unfortunately CTRL+F (Find) isn't finding any specific mention of Conwy - maybe there's a more-detailed study of the north Wales line specifically out there somewhere?
You mean it'll end up discontinued?Discontinuous electrification is probably dead in the long run as a result
Discontinuous electrification is probably dead in the long run as a result
Did the work for that report include any examination of the individual costs and difficulties of electrifying particular lines or locations? Or did it just make general assumptions about typical costs per mile?The 1981 'Review of Main Line Electrification' is available on the web (https://www.railwaysarchive.co.uk/documents/DoTBRB_Electrification1981.pdf). Unfortunately CTRL+F (Find) isn't finding any specific mention of Conwy - maybe there's a more-detailed study of the north Wales line specifically out there somewhere?
Clearance for 25kV has effectively reached zero with the surge arrestor and insulating paint scheme being pursued on the valley lines.
Discontinuous electrification is probably dead in the long run as a result
Clearance is still needed between the wire and the train roof.
Yes and no, and there are bi-modes and bi-modes.Surely bimodes are the way to serve routes which are only partially electrified - already successful on the GW, LNER and GE routes.