• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

History of Class 308

Status
Not open for further replies.

pdeaves

Established Member
Joined
14 Sep 2014
Messages
5,932
Location
Gateway to the South West
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

DidcotDickie

Member
Joined
12 Mar 2017
Messages
160
Location
Oxfordshire
I'm not sure but it looks like they are the original 308/2s which were built for Tilbury boat trains and parcels use on the London Tilbury & Southend line. These were originally 4 car units with passenger accommodation in the three trailers and parcels in the motor coach which contains the guards van. Most of these parcel vans were converted in the 1970s to passenger accommodation so that they could be used throughout the LT&S. They weren't very popular with the punters or operators as the absence of one passenger car was a nuisance, especially on peak workings. Usually they were confined to Tilbury loop line working where passenger loadings were lower, but they were also used when parcels and newspaper traffic required more space than the usual guards van. Boat train workings were fairly rare.

These two units retain the original parcels van motor coaches of the 308/2 which were not converted to passenger accommodation and presumably two of the driving trailers. The intermediate trailer has been removed so they are running as three car units. I don't know but it's possible that the driving trailers have been gutted for parcels use.

Hope this helps.
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,433
Location
Yorks
I'm surprised that they didn't go for a MLV type solution for heavy parcels traffic.
 

delt1c

Established Member
Joined
4 Apr 2008
Messages
2,182
MLV on 25v overhead would have requiered a considerable redesign.
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,433
Location
Yorks
MLV on 25v overhead would have requiered a considerable redesign.

I would have assumed something more organically linked to the AC electrics, but a single car luggage vehicle, rather than a redesign of the Southern/Tyneside version.
 

delt1c

Established Member
Joined
4 Apr 2008
Messages
2,182
without todays intensive turnaround the 308 was sufficient, to my mind the only flaw was incorporating it in the power car.
 

306024

Established Member
Joined
23 Jan 2013
Messages
3,974
Location
East Anglia
In the late 70s these units (in 4 car configuration) were diagrammed to the 03.59 Liverpool St to Shoeburyness and 04.10 Liverpool St to Tilbury Riverside newspaper trains. Their peak workings were indeed hidden on quieter services. Occasionally a cruise ship docking at Tilbury would see a special boat train working with one or two of these units to accommodate the luggage, but as DidcotDickie says, these were not at all frequent.
 

delt1c

Established Member
Joined
4 Apr 2008
Messages
2,182
The logical solution would have been a wired BG to operate between 2 x 4 car units, but then this was BR thinking at the time
 

306024

Established Member
Joined
23 Jan 2013
Messages
3,974
Location
East Anglia
The logical solution would have been a wired BG to operate between 2 x 4 car units, but then this was BR thinking at the time

Fortunately BR logic and thinking at the time included fitting the train in the platform. Such a formation wouldn't have fitted in platforms 16 to 18 at Liverpool St, which had to be used occasionally for the newspaper trains when engineering work prevented use of longer platforms.

Post #4 of this thread explains a lot more.

https://www.railforums.co.uk/threads/class-308-with-luggage-van.123176/
 
Last edited:

Alfie1014

Established Member
Joined
27 Jun 2012
Messages
1,205
Location
Essex
The logical solution would have been a wired BG to operate between 2 x 4 car units, but then this was BR thinking at the time

I don't think any of the BR MkI ER EMUs ever worked with hauled stock, they were EP brake compared with most of the hauled fleet at the time being vacumn braked and no provision for through control for the EMUs. I'm not saying it couldn't be done but there was no need at the time, compared to DMUs where they frequently hauled vans especially in the early days. Also on the LTS where the units worked for most of their lives, post electrification there were few facilities for, shunting and releasing hauled stock left after modernisation. In their latter lives 991-5 were also used a departmental/sandite units.

There are more pictures including this one of mine of 308317 at Upminster in this Flickr group for the 302-312s;

https://www.flickr.com/photos/8673209@N04/22699309733/in/pool-class302-312/

and this one of 308991 with a Class 309 en-route to Ilford in 1983;

https://www.flickr.com/photos/8673209@N04/23300291186/in/pool-class302-312/
 

delt1c

Established Member
Joined
4 Apr 2008
Messages
2,182
i agree that none of the BG.s ever operated with EMU's. My thinking always was that the 308/9's could have been built as standard 3 car units making them more flexible and 5 BG's could have been through wired for EMU operation. That way any available EMU on ER could have been used with the BG's as requiered.
 

30907

Veteran Member
Joined
30 Sep 2012
Messages
21,991
Location
Airedale
i agree that none of the BG.s ever operated with EMU's. My thinking always was that the 308/9's could have been built as standard 3 car units making them more flexible and 5 BG's could have been through wired for EMU operation. That way any available EMU on ER could have been used with the BG's as requiered.
Can't see that 3-car sets would have been a great advantage on the LTS (unless you diagrammed 4 together, I suppose)
 