History question, did WAGN run 12 car trains when they operated in and out of Liverpool Street? When did they start?
December 2011, once the Class 379s were introduced. This is when platforms at Stansted Mountftitchet, Sawbridgeworth, Broxbourne and Cheshunt were all lengthened, and 7/8 was built at Cambridge.
Ironically, when the peak 1Hxx fasts were lengthened, the stops at the lengthened platforms were removed!
So in 317 times everything was max 8 in passenger service?
I believe so, yes.
And how about more Inner - Suburban duties? Chingford/Enfield Town etc?