• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Hinged Signal Posts?

Status
Not open for further replies.

2StepsForward

New Member
Joined
19 Jun 2011
Messages
1
Hello all,

I'm new here so please be gentle with me!
I'm trying to research the use of hinged or wind down style signal posts.

I know they do exist but can't find much info via Google. Working at heights adjacent to 25,000 volts gives a strong case to do all maintenance at ground level but we still put up standard straight posts.

Does anyone have any information about where they have been used or trialled either in the UK or overseas?

Big thank you :)

2SF
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Old Timer

Established Member
Joined
24 Aug 2009
Messages
3,702
Location
On a plane somewhere at 35,000
Hello all,

I'm new here so please be gentle with me!
I'm trying to research the use of hinged or wind down style signal posts.

I know they do exist but can't find much info via Google. Working at heights adjacent to 25,000 volts gives a strong case to do all maintenance at ground level but we still put up standard straight posts.

Does anyone have any information about where they have been used or trialled either in the UK or overseas?

Big thank you :)

2SF
They are on the Trent Valley section.

There are also some in the section Bletchely to Watford Jct.

There are wind-down prinmarily to remove the need for working platforms so as to comply with the absolutely crazy Working at Height Regulations, rather than the need to avoid OHL Equipment.

The smaller signal unit also requires a smaller post and a base that is only the size of a room rather than the complete house.
 
Status
Not open for further replies.

Top