brad465
Veteran Member
The former canal tunnels, having been carved out of chalk but not fully brick-lined, were subject to a 20mph speed restriction for around 5 years until January 2004, when the line was shut for a whole year so all the exposed walls could be reinforced with concrete, preventing chalk falls and allowing the line speed to be raised to 70mph, in line with the rest of the North Kent line.
While I have memories of going through the tunnel when the restriction was in place, what I wasn't old enough to understand was the timetable impact at the time. This must have been significant, given the tunnel section is over 2 miles long, including the cutting gap between the two tunnels, and 20mph all the way along must have deterred passengers. Does anyone know how long trains took back then to go between Higham and Strood (compared to the 5 minutes allocated today), and if a notable surge in passengers followed the repairs, particularly above any average increase nationally?
While I have memories of going through the tunnel when the restriction was in place, what I wasn't old enough to understand was the timetable impact at the time. This must have been significant, given the tunnel section is over 2 miles long, including the cutting gap between the two tunnels, and 20mph all the way along must have deterred passengers. Does anyone know how long trains took back then to go between Higham and Strood (compared to the 5 minutes allocated today), and if a notable surge in passengers followed the repairs, particularly above any average increase nationally?